| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance | -5.15% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.1 L+₹25,818.69 (3.29%)Admitted-Fee/PreQual/Technical/Finance 11 126 GWAL TOLI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | -2.03% | ₹8.1 L+₹25,818.69 (3.29%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance HOUSE NO 95 26 HALIM COMPOUND PEACHBAG KANPUR | KANPUR | UTTAR PRADESH | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Affidavit not uploaded |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Affidavit not uploaded |
Tender Value
₹8.3 L
EMD Value
₹82,752
Closing Date
19 Sept 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Repair work on the collapsed drain slab opposite 12/480 N.L.K. School, located in Gwaltoli Khalasi Line under Ward 04, Zone-04.
2026_NNKAN_1183230_1
308/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-04
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹82,752
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Barricating with ropes, ballies and bamboos etc all complete. Barricating with ropes, ballies and bamboos etc all complete. | 80 | rmt | 50 | ₹4,000 |
| 2 | Desilting Of Open Nala Including . etc all complete. Desilting Of Open Nala Including . etc all complete. | 202.5 | cum | 180 | ₹36,450 |
| 3 | Dismentling reinforced cement concrete or reinforced brick work including stacking of dismantled materials Dismentling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). | 11.05 | cum | 1,200 | ₹13,262.4 |
| 4 | Suggestiv Empty Bag Filling by Sand. Supply and Laying of sandy earth plastic cement bags (volume 0.035cum) including cost of earth , cost of empty bags , labour , stitching with sutely complete , laying and placing complete at the place of restoration of Embankment | 300 | bags | 40 | ₹12,000 |
| 5 | Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. | 96 | hours | 228 | ₹21,888 |
| 6 | steel work welded in built up sections/ framed work including cutting hoisting fixing in position and applying a priming coat etc all comp steel work welded in built up sections/ framed work including cutting hoisting fixing in position and applying a priming coat etc all comp- | 500 | kg | 120 | ₹60,000 |
| 7 | Concrete/R.C.C. Work-RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) Reinforced cement concrete work In beams, suspended floors, roofs having slope up to 15• landlngs, balconies, shelves, chaDas, lintels, bands, plaln window sllls, staircases and splral stair cases above pllnth level up to floor five level, excluding the cost of centering, shuttering, finishing andreinforcement. | 24.57 | cum | 8,720 | ₹2,14,242.55 |
| 8 | Concrete/R.C.C. Work-steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in positon and biding all comp Steel reinforcement for R.C.C. work Including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 23.14 | qtl | 7,200 | ₹1,66,608 |
| 9 | Retaining walls, return walls, walls (any thickness) Including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. Centering and shuttering including strutting, propping etc. and removal of form work for (Upto 5th Floor) :- | 219.51 | sqm | 390 | ₹85,608.9 |
| 10 | Class-150 brick work in 1:4 cement, c.sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement : 4 coarse sand) | 10.15 | cum | 6,600 | ₹66,990 |
stage.html
html • 0.02 MB
finance_2225207.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_2225207.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .