Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹41.7 LAccepted-AOC | ₹41.7 L Quoted ₹52.7 L | L2 | Accepted-AOC L1 |
| 2 | L1₹48.8 LRejected-AOC 2 64 24 1 PONNANDI NAGAR 2ND STREET MUTHIAHPURAM TUTICORIN 628 005 | TUTICORIN | TAMIL NADU | 628005 | ₹48.8 L | L1 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PARVATHI ENTERPRISES L1 | A. SUDALAIMUTHU CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for clearing of coal / coal dust and foreign materials daily on walkways of both sides, return side under belt throughout conveyors, deck sheets, and tail end area and Junction towers etc. of conveyors 69,70 & 71 including hire charges for T&Ps and cost of all required consumables etc. complete. | 130 | ACTVY | 15,38,550 ₹18.2 L | 16,61,400 ₹19.6 L |
| 2.00 | Charges for changing the drive either from A to B or B to A drive and checking the hold back assembly for conveyors 69,70 & 71, including hire charges for T&Ps and cost of all required consumables and etc., complete. | 1 | OPN | 36,235 ₹42,757.30 | 39,135 ₹46,179.30 |
| 3.00 | Charges for assisting works for providing belt joint / pulley lagging in conveyors 69,70 & 71 by take up tower counter weight arresting, belt clamping, removing and re-fixing 10 Nos. idler frames with idlers, normalizing the conveyor and trial run etc. including hire charges for T&Ps and cost of all required consumables and etc. complete. | 6 | OPN | 2,18,700 ₹2.6 L | 2,36,190 ₹2.8 L |
| 4.00 | Charges for lifting and loading the fluid coupling / rotating assembly to drive floor, removing and assembling the auxiliaries with fluid coupling / oil coolant inlet and outlet, scoop actuator assembly and fixing of solenoid valve, lifting and positioning on the frame in between gearbox and HT motors, alignment checking in conveyors 69,70 & 71 including hire charges for T&Ps and cost of all required consumables and etc., complete. | 1 | OPN | 52,015 ₹61,377.70 | 56,175 ₹66,286.50 |
| 5.00 | Charges for removing the defective oil heat exchanger from its position, dismantling the oil heat exchanger top & bottom sides separated by cutting, heating the oil pipe lines to remove sediments in all the pipe line 32 Nos. cleaning with water and rinse with diesel, lifting, leading, positioning and commissioning the system, conveyors 69,70 & 71 including hire charges for T&P’s and cost of all required consumables and etc. complete. | 1 | OPN | 38,425 ₹45,341.50 | 41,500 ₹48,970 |
| 6.00 | Charges for Bearing checking of pulleys & Plummer blocks of conveyors 69,70 & 71 by belt clamping and take up tower arresting and loosening the belt to the required level by using heavy duty chain blocks, lifting the pulley from its position, dismantling the bearings with sleeve and placing the pulley to its original position and free rotation checking, greasing, cover fixing, lowering the take up tower, releasing the chain block, belt clamps and trial run including hire charges for T&P’s and cost of all required consumables and etc., complete. | 5 | OPN | 2,47,425 ₹2.9 L | 2,67,225 ₹3.2 L |
| 7.00 | Charges for arrangement made for replacing the pulley, providing chain block, slings arrangement, fixture readiness for bearing removal, belt clamps shifting to the required floor, pulley loading & unloading to the required floor, conveyor belt arresting at 3 places, take up tower lifting to 15 feets by manually operated chain block, cross beam arrangements made for lifting the pulley, removal of bearings from defective pulley, servicing the Plummer block bearings, positioning the spare pulley with Plummer blocks, alignment checking, greasing, cover fixing, rotation checking, releasing the belt clamps. Lowering the take up tower, normalizing, trail running of conveyors 69,70 & 71 including hire charges for T&P’s and cost of all required consumables and etc complete. | 1 | OPN | 50,645 ₹59,761.10 | 54,695 ₹64,540.10 |
| 8.00 | Charges for routine cleaning of the Plummer blocks resilient couplings, greasing of 6 to 7 points periodically, routine checking of belt scrappers and skirt board rubber and adjustment replacing of worn out rubber fabrication and providing of damaged scrappers and skirt board sealing system providing of new scrappers if required, removal of choke inside chute, checking oil level and top up works in conveyor 69,70 & 71 store drawal of materials including, cost of consumables, hire charges for T&P’s etc complete. | 130 | OPN | 8,43,050 ₹9.9 L | 9,10,650 ₹10.7 L |
| 9.00 | Replacement of damaged oil seal in input pinion shaft of gear box model SDN 500 of conveyor 69,70 & 71 charges for dismantling the multi discs, scoop actuator assembly, and fluid coupling assembly, cooling fan leading and lifting the input pinion shaft, inspecting the bearing, shaft, removing the hub and wornout oil seal, providing new one, on both sides assembly the auxiliaries, alignment checking, trial run, monitoring the conveyor, including T&P’s hire charges and consumables, lead and lift etc., complete. | 1 | OPN | 1,24,370 ₹1.5 L | 1,34,320 ₹1.6 L |
| 10.00 | Charges for dismantling the fluid coupling model SC11A from the drive motor and gearbox, oil draining lifting and lowering the assembly, dismantling the internal parts, removing the without oil seal, assembly by new one, checking the bearing, assembly the accessories oil filling, trial run, monitoring the conveyor including T&P’s hire charges, and consumables etc., complete | 1 | OPN | 74,970 ₹88,464.60 | 80,965 ₹95,538.70 |
Tender Value
Refer Docs
EMD Value
₹34,500
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-II- Upkeepement, attending breakdown and preventive mechanical maintenance of conveyors and monitoring of Conveyors -69,70 71 for the period from 01.04.2026 to 30.09.2026
2025_EB_633455_1
CE/SE/MI/TTPS/56/2026-2027
Open Tender
Miscellaneous Works
183 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹34,500
Yes
24 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Charges for clearing of coal / coal dust and foreign materials daily on walkways of both sides, return side under belt throughout conveyors, deck sheets, and tail end area and Junction towers etc. of conveyors 69,70 & 71 including hire charges for T&Ps and cost of all required consumables etc. complete.
Charges for changing the drive either from A to B or B to A drive and checking the hold back assembly for conveyors 69,70 & 71, including hire charges for T&Ps and cost of all required consumables and etc., complete.
Charges for assisting works for providing belt joint / pulley lagging in conveyors 69,70 & 71 by take up tower counter weight arresting, belt clamping, removing and re-fixing 10 Nos. idler frames with idlers, normalizing the conveyor and trial run etc. including hire charges for T&Ps and cost of all required consumables and etc. complete.
Charges for lifting and loading the fluid coupling / rotating assembly to drive floor, removing and assembling the auxiliaries with fluid coupling / oil coolant inlet and outlet, scoop actuator assembly and fixing of solenoid valve, lifting and positioning on the frame in between gearbox and HT motors, alignment checking in conveyors 69,70 & 71 including hire charges for T&Ps and cost of all required consumables and etc., complete.
Charges for removing the defective oil heat exchanger from its position, dismantling the oil heat exchanger top & bottom sides separated by cutting, heating the oil pipe lines to remove sediments in all the pipe line 32 Nos. cleaning with water and rinse with diesel, lifting, leading, positioning and commissioning the system, conveyors 69,70 & 71 including hire charges for T&P’s and cost of all required consumables and etc. complete.
Charges for Bearing checking of pulleys & Plummer blocks of conveyors 69,70 & 71 by belt clamping and take up tower arresting and loosening the belt to the required level by using heavy duty chain blocks, lifting the pulley from its position, dismantling the bearings with sleeve and placing the pulley to its original position and free rotation checking, greasing, cover fixing, lowering the take up tower, releasing the chain block, belt clamps and trial run including hire charges for T&P’s and cost of all required consumables and etc., complete.
Charges for arrangement made for replacing the pulley, providing chain block, slings arrangement, fixture readiness for bearing removal, belt clamps shifting to the required floor, pulley loading & unloading to the required floor, conveyor belt arresting at 3 places, take up tower lifting to 15 feets by manually operated chain block, cross beam arrangements made for lifting the pulley, removal of bearings from defective pulley, servicing the Plummer block bearings, positioning the spare pulley with Plummer blocks, alignment checking, greasing, cover fixing, rotation checking, releasing the belt clamps. Lowering the take up tower, normalizing, trail running of conveyors 69,70 & 71 including hire charges for T&P’s and cost of all required consumables and etc complete.
Charges for routine cleaning of the Plummer blocks resilient couplings, greasing of 6 to 7 points periodically, routine checking of belt scrappers and skirt board rubber and adjustment replacing of worn out rubber fabrication and providing of damaged scrappers and skirt board sealing system providing of new scrappers if required, removal of choke inside chute, checking oil level and top up works in conveyor 69,70 & 71 store drawal of materials including, cost of consumables, hire charges for T&P’s etc complete.
Replacement of damaged oil seal in input pinion shaft of gear box model SDN 500 of conveyor 69,70 & 71 charges for dismantling the multi discs, scoop actuator assembly, and fluid coupling assembly, cooling fan leading and lifting the input pinion shaft, inspecting the bearing, shaft, removing the hub and wornout oil seal, providing new one, on both sides assembly the auxiliaries, alignment checking, trial run, monitoring the conveyor, including T&P’s hire charges and consumables, lead and lift etc., complete.
Charges for dismantling the fluid coupling model SC11A from the drive motor and gearbox, oil draining lifting and lowering the assembly, dismantling the internal parts, removing the without oil seal, assembly by new one, checking the bearing, assembly the accessories oil filling, trial run, monitoring the conveyor including T&P’s hire charges, and consumables etc., complete
Charges for transporting, loading the MS/SS liner plates from Stores, Unloading to respective discharge chutes of conveyor 69,70 & 71 preparation of required size, removal of existing worn out liner plates, fixing by new one, scrap materials devoluted to stores, including cost of MS / SS welding electrodes, lead and lift, consumables and T&Ps hire charges and etc., complete.
Charges for transporting, loading the SS/MS parent plates from Stores, Unloading to respective discharge chutes of conveyor 69,70 & 71 preparation of required size, removal of existing worn out parent plates, fixing by new one, scrap materials devoluted to stores, including cost of MS / SS welding electrodes, lead and lift, consumables and T&P’s hire charges and etc complete.
Charges for leading the rope grease from pocket / department stores to received place of conveyor – 69,70 & 71 cleaning the rope, greasing, cleaning the sheeve pulleys for free movement in Conveyor – 69,70 & 71 including T&P’s hire charges and consumables lead and lift etc complete.
Charges for transporting, loading the respective idler frames / idlers from stores, unloading to the required – conveyors 69,70 & 71 replacing the existing worn-out idler frames / idlers by providing by new one, monitoring the belt sway, scrap material devoluted to stores, including T&P’s hire charges and cost of consumables etc., complete.
Charges for routine monitoring, cleaning and checking the mechanical equipments of conveyor 69,70 and 71 daily including Belt training, joint checking, removal of choke inside chute, skirt board checking, monitoring of chutes, liner plates& deflector plates, checking of idler free rotation, monitoring of gear box and fluid coupling, cleaning and lubricating take up moving parts, solenoid valve operation checking, checking of scoop actuator, oil pump and oil heat exchanger, including T&P’s hire charges, cost of consumables, etc., complete.
A. SUDALAIMUTHU CONTRACTOR (BID ID -1546426)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_757866.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid