Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical PLOT NO 927 SECTOR 47 GURGAON 2022R6406 | GURGAON | Accepted-Technical Qualified |
Tender Value
₹33.4 L
EMD Value
₹66,900
Closing Date
27 Feb 2026, 3:00 pmClosed
Amit Kumar
Division - Road Maintenance and Urban Amenities
Providing and laying 250mm dia RCC pipeline for connection of surface drain to Master Drain (Asset ID 12), Gurugram
2026_HRY_502660_1
202606CA3C94 F315 412C 97CB 2974CDD024B8720001
Open Tender
Civil Works
Works
120 days
Gurugram
Providing and laying 250mm dia RCC pipeline for connection of surface drain to Master Drain (Asset ID 12), Gurugram
2 documents required · 2 mandatory
₹1,180
₹66,900
Yes
20 Mar 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
27 Feb 2026
14 Feb 2026
[11.1.1]6 mm cement plaster of mix : 1. 1:3 (1 cement : 3 fine sand) [Through Rate]
[2.B1209] B1209. R.C.C. pipes NP2 class 250 mm dia [Rate]
[21.44.5]Lowering plain and reinforced concrete pipes and specials into trenches for all depths and laying out the same to correct alignment gradients levels etc., including all dressing and trimming and cutting of concrete beds and joint holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benching haunches and envelope are completed. The pipes shall rest on the beds at all points throughout their lengths and to ensure this they shall be grouted in where necessary as described in item no.21.38 including carriage from the stores of the Engineer-in-charge and safe delivery thereof at site of works. This includes, loading, unloading, stacking at convenient points adjacent to the works ready for lowering as may be found most convenient in the interest of work. (For NPI or NP2 and NP3 or NP4 pipes) 5. 250 mm internal diametre of sewer (Class NP1 to NP2) [Through Rate]
[21.93.3]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 3. Type:- Extra Heavy Duty Set (EHD-10) 560MM Clear Opening [Through Rate]
[3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate]
[4.19.1.2]Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth up to 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m : 1.2. Ordinary rock : Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia [Through Rate]
[5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.5]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.35.1]Steel reinforcement for R.C.C. work ready to use `cut and bend` rebars of approved make from factory/workshop to construction site including placing in position and binding all complete up to plinth level. 1. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_581336.xls
BOQ • 0.32 MB
AD0151504.pdf
Additional Documents • 0.62 MB
162CorrigendumSPRID12.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .