Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹97.2 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹98.7 L+₹1.5 L (1.52%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹98.7 L+₹1.5 L (1.52%)Rejected-Finance | 3 | Rejected-Finance 3 |
Tender Value
₹97.2 L
EMD Value
₹1.9 L
Closing Date
20 Jan 2023, 6:30 pmClosed
The Executive Engineer_DWSD_PHE Dte
Durgapur_12
Balance work for laying of HDPE pipe line for providing FHTC in connection with JJM at Arrah Mouza (JL-89) part-C under command area
2022_PHED_439149_7
13/2022-2023/EE/DWSD/PHE Dte
Open Tender
CIVIL WORKS
Percentage
25 days
Kanksa
Balance work for laying of HDPE pipe line for providing FHTC in connection with JJM at Arrah Mouza (JL-89) part-C under command area
2 documents required · 2 mandatory
₹1.9 L
25 Aug 2023
5 Jan 2023
24 Jan 2023
5 Jan 2023
20 Jan 2023
9 Jan 2023
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .