| 1 | L1₹2.9 CrAccepted-AOC | ₹2.9 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹3.0 Cr+₹1.8 L (0.60%)Rejected-Finance | ₹3.0 Cr+₹1.8 L (0.60%) | L2 | Rejected-Finance L2 Tenderer |
| Sl No | Description | Qty | Unit | A.AKBAR L2 | SIVAGNANAM L1 |
|---|---|---|---|---|---|
| 1.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 2.00 | ch 0/0-2/300 | 2,760 | Sqm | 7 ₹19,320 | 6 ₹16,560 Lowest |
| 3.00Existing BT Pickinng scarifing inculding cost and conveyance etc | |||||
| 4.00 | ch 0/0-2/300 | 2,118.33 | Sqm | 25 ₹52,958.25 | 23 ₹48,721.59 Lowest |
| 5.00Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | |||||
| 6.00 | ch 0/0-2/300 | 1,317.6 | M3 | 2,743 ₹36,14,176.8 Lowest | 2,743 ₹36,14,176.8 Lowest |
| 7.00Providing and laying Prime coat over WMM surface using 7.0 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification | |||||
| 8.00 | ch 0/0-2/300 | 7,619 | M2 | 88 ₹6,70,472 | 84 ₹6,39,996 Lowest |
| 9.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
| 10.00 | ch 0/0-2/300 | 25,386 | M2 | 22 ₹5,58,492 | 19 ₹4,82,334 Lowest |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
6 Jan 2026, 3:00 pmClosed
The Project Director, DRDA, Chengalpattu
The Project Director, DRDA, Chengalpattu
Strengthening of Ponmar Polachery DABC Main Road Km 0 0 to 2 300 in Ponmar Panchayat in Thiruporur Block of Chengalpattu District under MGSMT Savings Fund Having PKG No.07
2025_RDTN_635520_1
Rc.No.3435/2025/A14 dt. 20.12.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruporur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.0 L
O/o The Project Director, DRDA, Chengalpattu
4 Feb 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
6 Jan 2026
23 Dec 2025
30 Dec 2025
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Existing BT Pickinng scarifing inculding cost and conveyance etc
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying Prime coat over WMM surface using 7.0 kgs. of emusion for 10 sqm.area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer etc., complete as per clause 503 of MOST specification
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam to 50mm thick (Grade - I) Using VG30 & Plastic Waste Providing and laying Bituminous Macadam to 50mm thick using 0.20 cum of 26.5-13.20mm,0.43 cum of 13.20-2.36mm and 0.26cum of 2.96 & below IRC HBG metal with 58.66 kgs of VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of US gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of
Road Marker/ Road stud with lens Reflector
Proviosion for 60cm Equilateral Triangele ( Cautionary ) Sign board
Proviosion for KM stone
Provision for HM stone
Provision for Speed break
Applying TACKCOAT over WMM surface at 3.00Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc.
Speed breakers-4 Nos
Providing and laying of Bituminous Concrete 30 mm compacted thickness using 60/70 grade bitumen which shall consist of construction of a single course binder/ wearing course on a previously prepared bituminous base to the requirements of the specifica
Speed breakers-4 Nos
Providing and laying of Hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms, per sq.m. area thickness of 2.50mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level, uniform
Speed breakers-4 Nos
Providing and fixing of retro reflectorised Cautionary Mandatory and Informatory sign as per IRC :67-2010) made of high intensity grade sheeting vide clause 801.3 fixed over aluminum sheeting 1.5mm thick fixed on back supporting frame and supported on a m
Speed breakers-4 Nos
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Technid07.pdf
Tender Documents • 0.50 MB
Price07.pdf
Additional Documents • 0.41 MB
BOQ_760576.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .