Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹26.8 L
Closing Date
1 Dec 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer R.C.D. Road Division Ranchi
Executive Engineer, R.C.D. Road Division-Ranchi, Morhabadi, Ranchi 834008
Widening / Strengthening and Reconstruction work of Road from Dhurwa Golchakkar (Ch. 2.730 KM) to Police Headquarter (Ch. 5.427KM) of Birsa Chowk-Dhurwa Golchakkar-Project Building-Chandni Chowk Road (Total Length -2.697 KM) for the year 2026-27.
2026_CECOM_120961_1
RCD/RANCHI-33/2026-27
Open Tender
Civil Works - Roads
Item Rate
390 days
Dhurwa Golchakkar (Ch. 2.730 KM) to Police Headqua
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹26.8 L
Chief Engineer Comm., RCD, Jharkhand Ranchi
10 Nov 2026
10 Nov 2026
2 Dec 2026
10 Nov 2026
1 Dec 2026
10 Nov 2026
17 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By manual means in area of light jungle | 3.51 | Hect | - | - |
| 2 | Cutting of Trees, excluding removal of stumps and roots of trees(Cutting of trees stacking of serviceable material with all lifts and up to a lead of 1000 mtrs.)
Girth from 600 mm to 900 mm | 63 | Each | - | - |
| 3 | Removal of stumps and roots including backfilling with suitable material to required compaction (Removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 600 mm to 900 mm | 63 | Each | - | - |
| 4 | Cutting of Trees, excluding removal of stumps and roots of trees(Cutting of trees stacking of serviceable material with all lifts and up to a lead of 1000 mtrs.)
Girth from 900 mm to 1800 mm | 74 | Each | - | - |
| 5 | Removal of stumps and roots including backfilling with suitable material to required compaction (Removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 900 mm to 1800 mm | 74 | Each | - | - |
| 6 | Cutting of Trees, excluding removal of stumps and roots of trees(Cutting of trees stacking of serviceable material with all lifts and up to a lead of 1000 mtrs.)
Girth above 1800 mm | 10 | Each | - | - |
| 7 | Removal of stumps and roots including backfilling with suitable material to required compaction (Removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth above 1800 mm | 10 | Each | - | - |
| 8 | Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately) | 244 | Each | - | - |
| 9 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Dismantling Stone Masonry
By Manual means
Rubble stone masonry in cement mortar | 56 | M3 | - | - |
| 10 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)
Lime /Cement Concrete
By Manual means
Cement Concrete Grade M-15 & M-20 | 68 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBD.pdf
Tender Documents • 12.91 MB
BOQ_163654.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .