Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹35.9 L
EMD Value
₹71,800
Closing Date
27 Oct 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Providing 2nos of Capacitor Banks at 33/11KV Sub-station Nandagaon in O&M Division, HESCOM, Athani on Total Turn Key basis
HESCOM/2026-27/EL/WORK_INDENT1231
HESCOM/2026-27/EL/WORK_INDENT1231
Open
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
20 documents required · 20 mandatory
The Bidder should have achieved in at least Two financial year an average annual financial turnover of not less than the amount put to tender in the last five financial years (i.e., 2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection. Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
Liquid assets (Cash at Bank PLUS Term deposit in any Nationalized/Scheduled Commercial Bank) on or after the date of notification of tender PLUS Availability of credit facility in any Nationalized/Scheduled Commercial Bank shall not be less than 30% of the amount put to tender which shall be supported by certificate issued by any Nationalized /Scheduled Commercial Bank. If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Original scanned Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office, HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid ANNEXURE V.The conditional credit certificates are liable for rejection
The bidder should have Satisfactorily completed, as prime a contractor, at least one contract involving 33KV and above class, new/augmentation of substations/new lines/Reconductoring of lines /other substation related works of value not less than 50% of the amount put to Tender in any State/Central Govt./ Distribution Companies /PSUs in the last Five Financial Years. (i.e., 2020-21,2021-22,2022-23 2023-24 and 2024-25) on Labour /Self-Execution/Partial turnkey /Total Turnkey basis.As a proof of documentary evidence work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV. Please note that, Award cost and Executed cost must be mentioned in the work completion/Performance certificates.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.
Substation Site Inspection Certificate: The bidder at his own responsibility must visit the respective 33KV substation at their own expense to assess the space and technical requirements for installing the capacitor banks and obtain all information that may be necessary for participating in the tender. The Substation site inspection certificate issued by the concerned Executive Engineer-Ele. 33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹900
₹71,800
12 Oct 2026
12 Oct 2026
28 Oct 2026
16 Oct 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2026-27/EL/WORK_INDENT1231 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms UG cable in R.Kms Others Cost of the work/project Executed cost Rs.in Lakhs
Note:Works completed during the period from (i.e., 2020-21,2021-22,2022-23 2023-24 and 2024-25) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Providing 2nos of Capacitor Banks at 33/11KV Sub-station Nandagaon in O&M Division, HESCOM, Athani on Total Turn Key basis
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 2688535.80 2688535.80
2 Labour charges 136820.55 136820.55
3 Civil Engineering Charges (Exclusive of GST) 164006.00 164006.00 2.806226956
5 Area Specific Loading @ 5% on labour charges 0 0 0.00 0.00
7 Contractors Profit @ 10% on Sl No. Sl No. 4 & 5 268853.58 13682.05 16400.60 298936.23
9 % age of tender compenents included
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Providing 2nos of Capacitor Banks at 33/11KV Sub-station Nandagaon in O&M Division, HESCOM, Athani on Total Turn Key basis
Part : A Electrical S/S Portion
Sl. No. Particulars Unit Qty Unit Cost Total Material Cost Rs. Ps. Unit Labour Cost including testing and commissioning Rs. Ps. Total Labour Cost including testing and commissioning Rs. Ps.
A.1 11 KV Isolators 400A with manually operated isolators with Pad connectors suitable for Lynx ACSR Conductor, as per technical specification with cylindrical post insulators
a) b) 11KV 400A, Double Break (As per HESCOM CSR 2025-26, CDS 15, Page No.33, Sl No.9) set 2 20500.00 41000.00 984.00 1968.00 984
c) H frame for mounting Structure icluding wiring. Complete set (As per HESCOM CSR 2025-26, CDS 15, Page No.33, Sl No.9) Nos 2 3487.00 6974.00 288.00 576.00
b) Earth bonds (Copper) to GOS handles 300mm long(As per KPTCL SR 2023-24,Page No.43,Sl.No.19,Item No.19.5) Nos 2 391.00 782.00 0.00 0.00 326
A.2 Conductors 0.00 0.00 391
a) "Coyote" ACSR Conductor (KPTCL/ESCOM SR 25-26, Page No.: 136, SL No.: 10, = 135537 & Labour charges Rs. 12000/-) km 0 135537.00 0.00 12000.00 0.00
b) Lynx ACSR Conductor (As per KPTCL SR 2023-24,Page No.44, Sl No.20,Item No.20.5). Meter 150 192.00 28800.00 8.00 1200.00
A.3 Insulators and Hardware 0.00 0.00
a) 33kV 70 KN Polymer Insulator (Ball & socket type) {As per ESCOM CSR 2025-26, Page No.214, Sl No.25,item No.6.03) Nos. 48 390.00 18720.00 0.00 0.00 24
b) Strain Clamp, 3 Bolt type for 70/90 kN Disc Insulator {As per ESCOM CSR 2025-26, Page No.137, Sl No.46, item No.5.16) Nos. 24 588.00 14112.00 0.00 0.00
e) T-Clamps for Lynx ACSR (As per KPTCL SR 2023-24,Page No.69, Sl No.47.7.8). Nos 12 447 5360.00 0.00 0.00 372
h) Pad Clamps suitable for Lynx ACSR (As per KPTCL SR 2023-24,Page No.67, Sl No.46.11). Nos 24 673 16160.00 0.00 0.00 561
i) Eye Hook (Flat Type) for fixing Clamp (As per ESCOM CSR 2025-26, Page No.164,Sl.No.410,Item No.43.40) No 24 103.00 2472.00 0.00 0.00
a) RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 for ODS.(As per ESCOM CSR 2025-26, 11 KV Material system, Page No.135, Sl. No.1, Item No.:1.01),Labour Charges Rs.561+991=Rs.1552{As per ESCOM CSR 2025-26, Page No.189 & 190, Sl.No1 and 30,Item No.1.1.1 and 2.02) Nos 4 6276.00 25104.00 1552.00 6208.00
c) Beams out of channels 100x50mm with arrangements for stringing power conductor alongwith cleats, Bolts& Nuts, painted with two coats of metal primer and aluminium paint, etc, complete. 0.00 0.00
Supplying and fixing C channel angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint for 11 KV ODS mounting structure using 100 x 50 x 6.4 mm C channel MS, each 4.0 mtr long , As per KPWD SR Vol-2 Page No:A-40 Sl.No-940. 1 Mtr=7.9Kg, Per Kg-68.00 16NosX4Mtr=64*7.9=505.6Kg= 505.6*68=34380.8Rs Mtr and 30% labor= 68*0.3=20.4, 505.6*20.4=10314.24 KG 505.6 68.00 34380.80 20.40 10314.24 10314.24 81482.496
d) Angles 65x65x6mm with clamps, Bolts, painted with two coats of metal primer and aluminium paint, etc, complete. 0.00 0.00
a) 2.50 mtrs long for fixing 11KV GOS handle support Nos 2 858.00 1716.00 17.57 35.14
A.5 a) Control Cable with Accessories: (With glands/lugs/ferruels) 0.00 0.00
19 Core 2.5 Sq.mm, KPTCL CEE T&P Bengaluru Circular Ltr No-CEE/T&P/SEE-1/EET2/AEE-P4/2025-26/9702 DATE-09-02-2026 , (As per KPTCL 4th Quarter of FY -2025-26 Page No:10,Sl No:181, item No:13.16), Rs-7,09000/-). & Labour Charges (As per KPTCL SR 2023-24,Page No.120,Sl.No.22, Item No.b) Meter 150 591 88625.00 13.00 1950.00 0.15 492 11
4 Core 6 Sq.mm, KPTCL CEE T&P Bengaluru Circular Ltr No-CEE/T&P/SEE-1/EET2/AEE-P4/2025-26/9702 DATE-09-02-2026 , (As per KPTCL 4th Quarter of FY -2025-26 Page No:10,Sl No:174, item No:14.2), Rs-990000/-). & Labour Charges (As per KPTCL SR 2023-24,Page No.120,Sl.No.22, Item No.b) Meter 100 87 8666.67 13.00 1300.00 0.1 72 11
2 core 2.5 Sq.mm KPTCL CEE T&P Bengaluru Circular Ltr No-CEE/T&P/SEE-1/EET2/AEE-P4/2025-26/9702 DATE-09-02-2026 , (As per KPTCL 4th Quarter of FY -2025-26 Page No:10,Sl No:175, item No:13.1), Rs-1,11000/-) & Labour Charges (As per KPTCL SR 2023-24,Page No.120,Sl.No.22, Item No.b) Meter 200 93 18500.00 13.00 2600.00 0.2 77 11
b) Providing, laying and jointing PVC pipes conforming to IS 4085-1960 and approved makes with necessary specials such as collars, bends, elbows, Tee, Nipples, plugs etc., complete, whereever necessary as per the directions of the Field Engineer. 0.00 0.00
PVC pipes 63mm dia., 6 kg/sqcm & class 3 Mtrs 30 161.00 4830.00 0.00 0.00 30
PVC pipes 75mm dia., 6 kg/sqcm & class 3 Mtrs 30 220.00 6600.00 0.00 0.00 30
A.6 Capacitor Bank: 0.00 0.00
Design Engineering, Supplying and Erection (including civil work) testing, commissioning of Capacitor Banks with Internal Fuses, Terminal Connectors suitable capacity neutral CT's and 0.2% series reactance on neutral side with elevating/ mounting structures and with 10% spare capacitors complete of 12.1 KV, 2.9 MVAR class capacitor bank. (SR 2023-24 Page No:39) Set 2 448708 897416.67 18523.33 37046.67 373924 15436.11111
A.7 a) Supply of 11KV PCVCB outdoor type 350MVA 800Amps for capacitor bank with HV and UV Relay's As per KPTCL order No KPTCL/B25/CEE(T&P)/SEE(T&P)/EE(P)/AEEP-2/19-20,Bangalore Dated:27.06.2019 (SR 2023-24 Page No:28) Set 2 597942 1195883.33 18330.00 36660.00 498285 15275 717530
b) Supply of Annunciator panel for 2Capacitor bank Panel (As per KPTCL SR 2023-24,Page No.30, Sl No.4.11). Unit 1 91758 91758.33 1,734 1734.17 76465 1445.138889
A.8 Ground Mat & Earthing : 0 0.00 0.00 0.00 0 0
a) Supplying and laying of MS Flats of various sizes, welding and applying ACB paint to welded portion and covering with sodium bentonite clay as per the drawing/standard specification and consolidation (MS Flat of size 50x6), (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:f Material Rs-404.00) Rmt 100 337 33666.67 0.00 0.00 281 0
c) Grounding of equipment by providing Cast iron pipe of 100 mm ID 13 mm thickness, 2.75 metre long with 2 part clamp out of G.I. Flat 50 X 6 mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor) (As per KPTCL SR-2023-24, Page No:115, Sl.No-6 Item No:c Material Rs-12792+3491 Labour Set 10 10660 106600.00 2909.17 29091.67 8883 2424.305556
d) Supplying & providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc.,.(As per KPTCL SR-2023-24, Page No:124, Sl.No-26 Item No:i Material Rs-1499.00 each 10 1249 12491.67 0.00 0.00 1041 0
e) Grounding of equipment with 50X6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of Earthing with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor (As per KPTCL SR-2023-24, Page No:123, Sl.No-26 Item No:i Material Rs-335.00 Rmt 100 279 27916.67 0.00 0.00 233 0
A.9 Busbar Formation Main bus/cross bus (all the three phases in a segment) of using Coyote-single/double conductors with fixing of insulator spacers, levelling of string conductors to the required height above the equipment, including providing jumps to interconnect different segments of the main bus. 0.00 0.00 0.00 0
a) Main Bus/Cross Bus as above using Single Lynx Conductor Nos 1 0.00 6136.67 6136.67 5113.888889
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
PART- ¨B-(CIVIL WORKS)
Providing 2nos of Capacitor Banks at 33/11KV Sub-station Nandagaon in O&M Division, HESCOM, Athani on Total Turn Key basis
Sl No. Item Description Unit Quantity Unit Price (Rs) Total Price (Rs)
B SCHEDULE OF ITEMS FOR ASSOCIATED CIVIL WORKS AND STRUCTURES:
B1 Cable Trenches including road crossing :
a Providing and Laying RCC Hume pipe sub ducts using NP 2 class 300mm dia Hume pipe including cost of Excavation, laying charges and back filling wherever required as per technical specification and enclosed drawings including cost of all materials, labour, etc., complete. Rmtr 50 853.00 42650.00
B2 Foundations: Engineering, supply of all labour, material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grounting underpining etc., for the followinf works. 0.00
b 11KV, 350MVA, 800A Out door type 2No's Kiosks VCB foundation as per approved design and drawing including supply of material and labour. Nos. 2 48500.00 97000.00
B3 Supplying & Spreading Jelly 20/25mm size CMT 10 1038.00 10380.00
Total Cost of Civil Engineering Works 164006.00
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 110 KV 'D' type tower with 6Mtrs extension at both side of railway crossing between points 60 &61 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Weight of Towers
Sl. No. Type of Towers No. of Towers Unit weight in MT Total weight in MT
Tower including Stubs Bolt & Nuts Tower including Stubs Bolt & Nuts
1 D Type Tower with Stubs
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S & L sub -division HESCOM, Belgaum. 33KV Line maintnance Division HESCOM, Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 110 KV 'D' type tower with 6Mtrs extension at both side of railway crossing between points 60 &61 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Earth Work Excavation
Normal Soil / BC Soil :
Basic Rate of Hard Soil as per KPWD SR 12-13 Pg No 5 Item No 2-2.4 186.00
Add 50% Extra as per CSR12-13, pg No 5of20 93.00
Wet Black Cotton Soil
Basic Rate of Hard Soil as per KPWD SR 12-13 as PER Pg No 5 Item No 2-2.4 186.00
Add 50% Extra as per CSR12-13, pg No 5of20 93.00
Dry Fissured Rock / Latterite Soil :
Basic Rate of Ordinary Rock without blasting as per KPWD SR 12-13 as per Pg No 5 Item No 2-2.8 830.00
Add 50% Extra as per CSR12-13, pg No 5of20 415.00
Concreating Works:-
Concreate 1:3:6
Basic Rate as per KPWD SR 12-13 as per pg no Pg No 12-4-4.7 4077.00
Add 25% extra as per CSR12-13, pg No 6of20 1019.25
Concreate 1:2:4
Basic Rate as per KPWD SR 12-13 as per pg no as per Pg No 12 Item No 4-4.12 4140.00
Add 25% extra as per CSR12-13, pg No 6of20 1035.00
Rate as per KPWD SR 12-13 as per Pg No 19 Item No 4-4.46 69940.00
Filling with Excavated earth
Basic Rate as per KPWD SR SR 12-13 as per Pg No 6 Sl No -2.2.10 84.00
Add 10% extra as per CSR12-13, pg No 5of20 8.40
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 110 KV 'D' type tower with 6Mtrs extension at both side of railway crossing between points 60 &61 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Tower Foundations
Sl. No. Type of Towers Type of Foundation No. of Towers Unit Quantity Total Quantity
Excavation (CMT) 1:2:4 Concreting (CMT) 1:3:6 Concreting (CMT) Reinfor-cement (MT) Excavation (CMT) 1:2:4 Concreting (CMT) 1:3:6 Concreting (CMT) Reinfor-cement (MT)
5 H - Frame DFR
BF = Excavation - Concreting 520.560
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 33 KV 'B' type D/C tower with 3Mtrs extension at both side of Tar road from S.H. Gokak to Belgaum between points 21 & 22 also 71, 108 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Weight of Towers
Sl. No. Type of Towers No. of Towers Unit weight in MT Total weight in MT
Tower including Stubs Bolt & Nuts Tower including Stubs Bolt & Nuts
1 D Type Tower with Stubs
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 33 KV 'B' type D/C tower with 3Mtrs extension at both side of Tar road from S.H. Gokak to Belgaum between points 21 & 22 also 71, 108 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Earth Work Excavation
Normal Soil / BC Soil :
Basic Rate of Hard Soil as per KPWD SR 12-13 Pg No 5 Item No 2-2.4 186.00
Add 50% Extra as per CSR12-13, pg No 5of20 93.00
Wet Black Cotton Soil
Basic Rate of Hard Soil as per KPWD SR 12-13 as PER Pg No 5 Item No 2-2.4 186.00
Add 50% Extra as per CSR12-13, pg No 5of20 93.00
Dry Fissured Rock / Latterite Soil :
Basic Rate of Ordinary Rock without blasting as per KPWD SR 12-13 as per Pg No 5 Item No 2-2.8 830.00
Add 50% Extra as per CSR12-13, pg No 5of20 415.00
Concreating Works:-
Concreate 1:3:6
Basic Rate as per KPWD SR 12-13 as per pg no Pg No 12-4-4.7 4077.00
Add 25% extra as per CSR12-13, pg No 6of20 1019.25
Concreate 1:2:4
Basic Rate as per KPWD SR 12-13 as per pg no as per Pg No 12 Item No 4-4.12 4140.00
Add 25% extra as per CSR12-13, pg No 6of20 1035.00
Rate as per KPWD SR 12-13 as per Pg No 19 Item No 4-4.46 69940.00
Filling with Excavated earth
Basic Rate as per KPWD SR SR 12-13 as per Pg No 6 Sl No -2.2.10 84.00
Add 10% extra as per CSR12-13, pg No 5of20 8.40
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for Constrcution of 33 KV 'B' type D/C tower with 3Mtrs extension at both side of Tar road from S.H. Gokak to Belgaum between points 21 & 22 also 71, 108 of the proposed 33 KV Line in favor of GE AFS Sambra Military Engineer services under DCW scheme.
Tower Foundations
Sl. No. Type of Towers Type of Foundation No. of Towers Unit Quantity Total Quantity
Excavation (CMT) 1:2:4 Concreting (CMT) 1:3:6 Concreting (CMT) Reinfor-cement (MT) Excavation (CMT) 1:2:4 Concreting (CMT) 1:3:6 Concreting (CMT) Reinfor-cement (MT)
5 H - Frame DFR
BF = Excavation - Concreting 780.840
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for conducting detailed survey of Proposed 33KV S/C Line from existing 110/33/11KV Sub-Station at Kanbargi to Proposed 2X2MVA, 33/11KV Sub-Station at Mutaga in Belgaum Taluk in favour of Garission Engineers (MES) Air Force Sub-Station Sambra-24, Under DCW scheme.
Sl.No. Particulars Unit Qty Rate Amount
1 Reconnaissance survey-cum-walk over survey along with Departmental Staff to determine the feasible route of the line on topo sheet. An alternate route if available should be indicated. The route of the line is to be indicated and got approved by the competent authority (Rates include the cost of Toposheet and Transportation) CSR-12-13 Pg.No.1 of 20, 1.-i)
a) Hilly terrain KMs 0 636.00 0.00
b) Plain terrain KMs 6.4 618.00 3955.20
2 Detailed survey, fixing anchor points and taking levels at 20 Mtrs intervals drawing route profile on Graph paper indicating geographical features like Nalas, Rivers, Garderns, P&T lines, Railway crossings etc., and enroute villages. CSR 12-13 Pg.No. 1 of 20,1-ii)
I) Hilly terrain KMs 0 3147.00 0.00
b) Plain terrain KMs 6.4 2101.00 13446.40
3 Fixing marking stones with approved marks including painting above the ground level and yellow lettering and marking the direction of incoming line and outgoing lines are to be clearly marked on the top with red colour, If the distance between two anchor points is more 1 km, one more directional stone is to be fixed. So also for the road crossing,railway crossing,river crossing,HT crossig and nala crossing for all on both the sides. CSR 12-13 Pg.No. 1 of 20, 5 iii) per stone 48 313.00 15024.00 Tower
4 Burgie details for indentification for all anchour towers with existing permanent marks like poles telephone lines, buildings etc. CSR 12-13 Pg.No.1 of 20 ,6 vi) Per Anchor Tower 11 283.00 3113.00
5 Conducting soil resistivity tests CSR 12-13, Pg. No. 1 of 20, 7 v) Per Test 7 542.00 3794.00
6 Clearing of bushes, tree branches of trees, crops and shrubs wherever encountered for detailed survey to enroute the corridor width of 3 mtrs (including viewing for fixing anchor towers etc.,) CSR 12-13, Pg. No. 1 of 20, 9 b)
a) Hilly terrain Kms 0 939.00 0.00
b) Plain terrian Kms 6.4 627.00 4012.80
7 a) Submission of reports in the form of good binding including the preparation of sketches for burgie details for each anchour points, scheduling of line details, S.R. values, soil clasiffication reports, tower schedule, abstract of towers etc, complete. CSR 12-13, Pg.No. 2 of 20,10 vii) Per set 6 191.00 1146.00
b) Drawing the route profile on graph sheet including geographic features like nalas, rivers, gardens,P&T lines, railway crossing etc, inclusive of all stationaries. (Normal requirment is 5 sets) Per set 6 191.00 1146.00
8 Preparing the schedules : a) PTCC proposal : Contaning PTCC questionaire, topo sheet extract with marking of the proposed line, SR reports, towers sketch, station single line diagram etc, (30 copies / sets) CSR 12-13, Pg. No. 2 of 20,12 viii) a) per set 1 757.00 757.00
b) Railway crossing proposal with drawing are inclusive of graph sheetes & other stationary materials, labour etc, (10 Sets) per crossing 1 757.00 757.00
c) Tree schedule contaning the details like name of tree, girth size of tree, distance from central line of the alignment, approximate height of the tree etc, complete. Per Hec. 15.2198 542.00 8249.13
d) Forest Proposal : Inclusive of all work like fixing of stones at every 20 Mtrs in the centre line and both end of the corridor, painting of each tree after chipping, writing the numbers on the tree, taking girth size of all the trees coming in the corridor at 1 mtr height from GL, approximate height of the tree and forest clearance proposals etc, complete (10 sets) Per Hec. 0 3529.00 0.00
9 Excavation for soil classification.
Excavation of soil 1.2Mtrsx1.2Mtrs upto depth of 2.5Mtrs or upto hard rock is reached which ever is less(Applicable to 110KV & 66KV lines) MWSR-13-14 P.NO.46,PT-2(1-A)
a) Normal soil / BC Soil CMT 0 0.00 0.00
b) DFR CMT 0 0.00 0.00
10 Misc and round off L/S 100.00
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S & L sub -division HESCOM, Belgaum. 33KV Line maintnance Division HESCOM, Belgaum.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Estimate for conducting detailed survey of Proposed 33KV S/C Line from existing 110/33/11KV Sub-Station at Kanbargi to Proposed 2X2MVA, 33/11KV Sub-Station at Mutaga in Belgaum Taluk in favour of Garission Engineers (MES) Air Force Sub-Station Sambra-24, Under DCW scheme.
A B S T R A C T
Sl. No. Particulars Total
1 Material charges. 0.00
2 Labour charges. 55500.53
3 Locality allowance at 20% on labour charges. 11100.11
4 Service tax @ 12.36% on total labour charges. 8231.84
5 a) Contribution towards Employee Provident Fund Charges. 9064.35
@ 13.61% on total labour charges.
b) ESI @ 4.75% on total labour charges 3163.53
6 Transportation cost from stores to site
( wherever applicable at 2% on material cost) 0.00
7 Contingencies @ 2% on total material and labour cost. 1332.01
8 Employees cost @ 20% on total labour charges ( 1+2 +3). 13320.13
9 Statutory charges as per actuals. 0.00
( inspectorate charges, civic body charges etc.,)
10 Government electrical inspecotrate charges as per actuals. 0.00
11 Compensation cost for tree cutting etc., as per approved norms. 0.00
12 Total cost of estimate in Rs. 101712.49
REPORT: This estimate amounting to Rs 101712-00 has been prepared for conducting a detailed surey for proposed 33KV S/C Line from existing 110/33/11KV Sub-Station at Kanbargi to proposed 2X2MVA, 33/11KV Sub-Station at Mutaga in Belgaum Taluk in favour of Garission Engineers (MES) Air Force Sub-Station Sambra-24, Under DCW Scheme. Earlier at the time of initial proposal, it was proposed to construct 33 KV S/C Line along the SH road of Belgaum-Bagalkot from tapping to the existing 33 KV line eminating from 110/33/11 KV station Nehru nagar. But now there are high density of residential layouts developed and due to which there is no convinient corridor to run 33 KV line safely.Hence it is proposed to construct new 33 KV S/C Line from the 110/33/11 KV station Knabargi for for proposed 2x2 MVA 33/11 KV MUSS at Mutaga, in favour of Garisson Engineers(AF), Military Engineer Services Air Force Station, Sambra-24, under the DCW scheme.Therefore, this estimate is prepared and kindly requested to sanction early.
CERTIFICATE: Certified that I have personally inspected the spot and prepared the estimate using current HESCOM Common S.R 2012-13 for safe and econamical way of execution of work.
Assistant Executive Engineer (Ele) Junior Engineer (Ele)
33KV S & L sub -division HESCOM, Belgaum. 33KV Line maint. HESCOM, Belgaum Division
Executive Engineer (Ele)
33K V S &L Division, HESCOM, Belgaum
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '3 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "3 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*2.5-B
Where 'N'= 01=04 months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "3 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "03 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 1=03 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
9-format-i- work done.xls
Others - 9-format-i- work done • 0.04 MB
5 section iv ECC INDENT 1231.doc
Others - 5 section iv ECC INDENT 1231 • 0.09 MB
4 section iii GCC INDENT 1231.doc
Others - 4 section iii GCC INDENT 1231 • 0.13 MB
1 NIT INDENT 1231.doc
Others - 1 NIT INDENT 1231 • 0.14 MB
14 KPTCL Cicrcular insurance surety bond.pdf
Others - 14 KPTCL Cicrcular insurance surety bond • 1.59 MB
10 CB Nandagoan Estimate.xlsx
Others - 10 CB Nandagoan Estimate • 1.10 MB
6 section v SCC INDENT 1231.doc
Others - 6 section v SCC INDENT 1231 • 0.12 MB
11 Advisory NOte.pdf
Others - 11 Advisory NOte • 0.67 MB
3 section ii ITB INDENT1231.doc
Others - 3 section ii ITB INDENT1231 • 0.11 MB
7 Annexures.doc
Others - 7 Annexures • 0.16 MB
8 tender capacity 1231.xlsx
Others - 8 tender capacity 1231 • 0.02 MB
2 section i IFB INDENT 1231.doc
Others - 2 section i IFB INDENT 1231 • 1.40 MB
13 Stamp Duty Circular.pdf
Others - 13 Stamp Duty Circular • 0.09 MB
12 FD417EXP.pdf
Others - 12 FD417EXP • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .