| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC R O VILLAGE KADWA TEHSIL BASANTGARH | ₹30.2 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹31.5 LRejected-Finance R O VILLAGE DHALPAR TEHSIL DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹31.5 L | L2 | Rejected-Finance L3 BIDDER |
| 3 | L3₹35.3 LRejected-Finance THALL LOHAI TESHIL MALHAR | ₹35.3 L | L3 | Rejected-Finance L2 BIDDER |
Updated dates
Tender Value
₹33.6 L
EMD Value
₹67,200
Closing Date
16 May 2026, 2:00 pmClosed
Executive Engineer PMGSY Division Ramnagar
Executive Engineer PMGSY Division Ramnagar
Permanent Restoration of road from L024-Punnara to Lodhara JK14435 Under SASCI Block Dudu
2026_JKRRD_147532_15
PMGSY/Div/Rgr/53 of 2026-27 Dated 08-05-2026
Open Tender
Civil Works - Roads
60 days
Sub Division Dudu
Please see tender document
3 documents required · 3 mandatory
₹1,100
₹67,200
8 Jun 2026
9 May 2026
18 May 2026
9 May 2026
16 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth with all lead and lift, as directed by Engineer-in-Charge. All kinds of soil = 80% , Ordinary Rock= 20% | 501.16 | Cum | 228.4 | ₹1,14,464.94 | item 03 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 23.52 | Cum | 5,673.4 | ₹1,33,438.37 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 90.37 | Cum | 6,591.25 | ₹5,95,651.26 | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.97 | Cum | 9,821.25 | ₹1,17,560.36 | - |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 132.69 | Cum | 5,402.9 | ₹7,16,910.8 | - |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 100.29 | Cum | 3,262.1 | ₹3,27,156.01 | - |
| 7 | Dumping of stones including cost of stones in horizontal or level | 91.02 | Cum | 937.9 | ₹85,367.66 | - |
| 8 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 283.5 | Cum | 3,093.3 | ₹8,76,950.55 | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1.32 | MT | 1,23,200 | ₹1,62,624 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 233.04 | Sqm | 286.35 | ₹66,731 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_230263.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid