| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.5 LAccepted-AOC A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | ₹36.5 L Quoted ₹36.8 L | L1 | Accepted-AOC BEING LOWEST |
| 2 | L2₹38.4 L+₹1.7 L (4.53%)Rejected-Finance A 303 VEENA CGHS LTD PLOT NO 5D SECTOR 22 DWARKA NEW DELHI 110077 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110077 | ₹38.4 L+₹1.7 L (4.53%) | L2 | Rejected-Finance Being Not Lowest |
| 3 | L3₹43.5 L+₹6.8 L (18.4%)Rejected-Finance | ₹43.5 L+₹6.8 L (18.4%) | L3 | Rejected-Finance Being Not Lowest |
| 4 | L4₹44.9 L+₹8.1 L (22.2%)Rejected-Finance NO 9 BYRAVESHWARA INDUSTRIAL ESTATE ANDRAHALLI MAIN ROAD NEAR PEENYA 2ND STAGE BENGALURU 560 091 | BENGALURU URBAN | KARNATAKA | 560091 | ₹44.9 L+₹8.1 L (22.2%) | L4 | Rejected-Finance Being Not Lowest |
| 5 | L5₹47.5 L+₹10.7 L (29.1%)Rejected-Finance RZ 212F D BLOCK RAJ NAGAR PART II PALAM COLONY NEW DELHI 110077 | SOUTH WEST | DELHI | 110077 | ₹47.5 L+₹10.7 L (29.1%) | L5 | Rejected-Finance Being Not Lowest |
Tender Value
₹49.9 L
EMD Value
₹1 L
Closing Date
13 Jul 2020, 6:00 pmClosed
MR ARJUN PATRO
GE U ELECTRIC SUPPLY DELHI CANTT-10
Repair and maintenance to switch gear at main receiving and distribution Shankar Vihar Sub Stn and replacing 4 pole structure with RMU at Anuj Vihaar of AGE U Elect Supply No III under GE U Elect Supply Delhi Cantt 10
2020_MES_350494_1
GE ELECT/D-27/2020-2021
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE U ELECTRIC SUPPLY DELHI CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE U ELECTRIC SUPPLY
₹1 L
Yes
21 Dec 2020
22 Jun 2020
15 Jul 2020
23 Jun 2020
13 Jul 2020
7 Jul 2020
Amount
Material and labour for servicing /testing of breaker/control panel including CT, PT and relays in control panel of VCB of capacity 1250 /800/630 Amps and rating 11 KV complete as details mentioned as under:- (a) Details of servicing of breaker :- (i) Adjustment of mechanism if required. (ii) Clean the circuit breaker to remove dust and dirt. The envelope of the vacuum interrupter and insulating materials shall be wiped with a clean cloth. (iii) Apply a small amount of oil to rotary sections, sliding surfaces, pins, coupling section, etc.use grease for the operating shaft and bearings, and machine oil for other parts. (iv) Check for rust and wear. (v) Check Spring Tension and pitting of the Cluster Contacts. (vi) Visual check for rust and deformation. (vii) Check for loosened bolts and nuts, broken spring washers and snap pins etc. (viii) Check for loosened connections, rust, damaged lead wires.
(ix) Check whether the contacts are damaged by arcing. (x) Checking of control circuit & tighten the connections if any. (xi) Check close & trip coil. (xii) Checking of Jaw Contacts Conditions and repair/adjust. (xiii) Replace the jaw contacts,If required. (xiv) Improvement of resistance of epoxy insulator and epoxy body by applying post heated varnish. (xv) Replacement of Dashpot/shock absorbers . (xvi) Replacement of carbon brush of spring charging motor (b) The following test shall be carried out:- (i) Primary Injection Test of CT / PT (ii) Closing & Opening Timing Test for all three poles. (iii) IR Test with megger in open and closed condition. (iv) Contact resistance test for all three poles (v) Closing coil resistance (vi) Tripping coil resistance. (c) Testing of following relays of control panel with Secondary Injection Kit ,checking and programming of relay :- (i) Over current and earth fault relay (d) Testing of followig Aux relay (i) DC Supply supervision relay. (ii) Master trip relay
Supplying, installation, commissioning and testing of 11 KV Current Transformer (CT`s), indoor type, resin cast epoxy type, of 13.1 KA/Sec having ratio 400/200/5-5 Amps having Core1: Class 5P10, 10VA for protection , Core2: Class 0.5, 10VA for metering and associated wiring including taking down old UNSV CTs complete all as specified and directed
All as per item No 2 here-in-before but having ratio 200/100/5-5
All as per item No 2 here-in-before but having ratio 150/75/5-5
All as per item No 2 here-in-before but having ratio 100/50/5-5
All as per item No 2 here-in-before but having ratio 60/30/5-5
All as per item No 2 here-in-before but having ratio 50/25/5-5
Supplying and fixing Potential Transformers, Draw-out type in existing HV panel for easy maintenance, 11kV/rt3:110V/rt3, 50VA, Cl.0.5 with associated gun-type HRC fuses and MCBs for HT/LT isolation including taking down old UNSV PTs complete all as specified and directed
Supplying, installation, commissioning and testing of PT unit three phase, three limbs, upto 11 KV draw-out type, resin cast dry type, single ratio having primary voltage 11 KV & secondary voltage 110 volts, 50 VA class-1 including necessary bus bar connections & wiring for metering including taking down old UNSV PTs complete all as specified and directed
S&F LED indication lamp for breaker ON/OFF/TRIP/Breaker Spring Charged/R-Y-B etc for 11 KV control panel and associated wiring, if reqd, including taking down old UNSV LED indication complete all as specified and directed
Supply and installation Anti-condensation space-heater withThermostatic control in cable and circuit breaker compartments of HT switchgears including taking down old UNSV heater complete all as specified and directed
S&F of vacuum interrupter suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV vacuum interrupter complete all as specified and directed
S&F of isolating contact assembly suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV contact assembly complete all as specified and directed
S&F of fixed contact block complete suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV contact block complete all as specified and directed
S&F of moving contact block complete suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV moving contact block complete all as specified and directed
S&F of motor & gear assembly 230V AC suitable for 400/630/800 amps, 11 KV HT VCB, testing & puting on load including taking down old UNSV motoer gear assembly complete all as specified and directed
S&F of spring bearing gear suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV spring bearing gear complete all as specified and directed
S&F of closing coil assembly 24 volts DC suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV closing coil complete all as specified and directed
S&F of tripping coil assembly 24 volts DC suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV tripping coil complete all as specified and directed
Supply and fix close/trip coil 24V DC for 11 KV HT VCB of capacity 400/630/800 Amps capacity including taking down old UNSV close/trip coil complete all as specified and directed
S&F of panel door lock suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV panel ddor lock complete all as specified and directed
Supplying & Fixing auxillary switch (7 No + 7NC) suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV auxillary contact complete all as specified and directed
Supply and fix T&C Switch for Breaker ON/OFF purpose in HT 11 KV VCB panel including associated wiring, if reqd, for proper functioning of switch including taking down old UNSV T& C switch complete all as specified and directed
Supplying & Fixing support road with screws suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV support road with screw complete all as specified and directed
Supplying & Fixing support insulator suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV support insulator complete all as specified and directed
Supplying & Fixing upper connector suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV upper connector complete all as specified and directed
Supplying & Fixing lower connector suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV lower connector complete all as specified and directed
Supply & fix of set of 6 Nos fixed arcing contacts suitable for 400/630/800 amps, 11 KV HT VCB including taking down old UNSV fixed arching contact complete all as specified and directed
S&F Caution plate “CAUTION MEN AT WORK of size 40cmx15cm made out of white acrylic sheet with Red coloured glow tape including taking down old UNSV caution plate complete all as specified and directed
S&F of HRC fuse of capacity 20 Amps for VCB including taking down old UNSV PTs including taking down old UNSV HRC fuse complete all as specified and directed
S&F MCB 20 to 32 Amps DP including taking down old UNSV MCBs complete all as specified and directed
S&F of Digital Volt meter Secondary voltage 110 V for 11 KV VCB Control Panel including taking down old UNSV meter complete all as specified and directed
M&L in replacement Earthing complete with galvanized steel earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 3.5 m below normal ground level) with top edge of earth plate not less than 2.5m below normal ground level, connected to galvanized strip 32mm by means of bolts, nuts, check nuts and washers of galvanised iron or steel as shown in electrical plate No 3 of SSR Part I, connected to earth test point and the equipment on the other nuts and washers of galvanised iron side complete all as specified, including testing and commissioning complete all as directed. Note : (a) The unit rates quoted against this item shall be deemed to include the cost of excavation and earth work in soft/loose soil, common salt & charcoal dust in alternate layers, PCC 1:3:6 type C2 as in pit, precast RCC 1:2:4 type B-1 with necessary reinforcement 6mm dia both ways as in cover & frame for pit, funnel, watering pipe 20 mm bore GI pipe light grade, protection pipe 40 mm bore GI pipe medium grade etc. (b) The quoted rates shall also deemed to include the cost of earth test point and earth strip/GI lead wire and protection pipe upto 7.5 meter beyond the earth plates electrode.
M&L in replacement 32x6mm galvanised iron strip for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in pipe or any other indicated situation for loop earthing etc complete all as specified and directed.
S&F and installation battery 12 volts,100 AH, dry type in replacement of old unserviceable battery in battery charger with suitable size of new copper battery terminal and lugs and initialy charging, commissioning and testing complete including taking down old UNSV PTs complete all as specified and directed
Maintanance services to be provided for Shankar Vihar 33 KV Sub Stn consisting of (aa) 33KV HT Outdoor SF6 Braeker (ab)11KV HT VCB Panel-7 nos (ac) DC Power Packs / Battery Chargers 48V/24V-2 nos (ad) 33Kv/11 KV Power Transformers-1No's (ae) 33KV Yard with Isolators,CTs, PTs, LA (af) LT Disrubution and Feeder Panels (ag) Street Light Timer Panels (ah) 11KV Metal Clad Switches (ai) LAN Switches / SCADA Acessories
Note: (a) The installation is main receiving station and complaint centre with 01 electrician shall be provided per shift (Total Three Shifts per day) round the clock (24x7) The electrician shall have adequate knowledge of above maintioned job and GE/Engr-in-charge can reject the proposed electrician giving reasoned rejection.No claim shall be admissible on account of rejection of person. (c) The following checking,testing , supervision shall be carried out by electrician in respect of equpments mentioned at (i) Recording of all parameters of system as per indication of all equipments installed in the log sheet as directed by Engr-in-charge round the clock on daily basis. (ii) Maintainance of fault register (iii) Maintainance of shutdown register (iv) Proper operatiion of 11 KV Breaker (v) Giving of Shutdown by draw out of trolley of breaker . (vi) Proper operation of 11 KV GO DO. (vii) Fixing of burnt out fuse on GO of 11 KV 4 pole structure. (viii) Checking of LED indication for breaker on , off , trip , spring charge , trip circuit healthy on daily basis. (ix) Checking of annunciator, hooter , indicators , meters, TNC switch , emergency trip push button , MCB for AC DC isolation, heater , thermostate on daily basis.
(x) Checking of status of Main protection numerical relay Auxillary protection relays such as trip circuit supervision relay, master trip relay , PT fuse failure relay DC supervision relay and keeping all the relays in reset condition on daily basis. (xi) Checking of oil level of transformer on as directed by Engr-in Charge. (xii) Checking the batteries in serviceable and charged condition by checking battery, leads, battery lugs on daily basis. (xiii) Attending of all complaint of the sub stn . (xiv) Cleaning of dust & foreign particles on and around the panel, loose connection earthing connection in the sub station. (xv) Checking of condition of leakage of oil from transformer tank, bushing, radiators and other parts on weekly basis. (xvi) Checking condition of silica gel of ttransformers on weekly basis (xvii) Testing of earth resistance of all earthing as directed by Engr-in-charge. (xviii) Checking of DC voltage of system as directed by Engr-in charge.
Maintanance services to be provided for Shankar Vihar 11 KV Sub Stn consisting of (ba) 11KV HT VCB Panel-28 nos (bb) DC Power Packs / Battery Chargers 110V/24V (bc) 11Kv/440 Volt Distrubution Ttransformers-4No's (bd) LT Disrubution and Feeder Panels (be) Street Light Timer Panels (bf) 11KV Metal Clad Switches (bg) LAN Switches / SCADA Acessories
Note: (a) The installation is main receiving station and complaint centre with 01 electrician shall be provided per shift (Total Three Shifts per day) round the clock (24x7) The electrician shall have adequate knowledge of above maintioned job and GE/Engr-in-charge can reject the proposed electrician giving reasoned rejection.No claim shall be admissible on account of rejection of person. (c) The following checking,testing , supervision shall be carried out by electrician in respect of equpments mentioned at (i) Recording of all parameters of system as per indication of all equipments installed in the log sheet as directed by Engr-in-charge round the clock on daily basis. (ii) Maintainance of fault register (iii) Maintainance of shutdown register (iv) Proper operatiion of 11 KV Breaker (v) Giving of Shutdown by draw out of trolley of breaker . (vi) Proper operation of 11 KV GO DO. (vii) Fixing of burnt out fuse on GO of 11 KV 4 pole structure. (viii) Checking of LED indication for breaker on , off , trip , spring charge , trip circuit healthy on daily basis. (ix) Checking of annunciator, hooter , indicators , meters, TNC switch , emergency trip push button , MCB for AC DC isolation, heater , thermostate on daily basis.
(x) Checking of status of Main protection numerical relay Auxillary protection relays such as trip circuit supervision relay, master trip relay , PT fuse failure relay DC supervision relay and keeping all the relays in reset condition on daily basis. (xi) Checking of oil level of transformer on as directed by Engr-in Charge. (xii) Checking the batteries in serviceable and charged condition by checking battery, leads, battery lugs on daily basis. (xiii) Attending of all complaint of the sub stn . (xiv) Cleaning of dust & foreign particles on and around the panel, loose connection earthing connection in the sub station. (xv) Checking of condition of leakage of oil from transformer tank, bushing, radiators and other parts on weekly basis. (xvi) Checking condition of silica gel of ttransformers on weekly basis (xvii) Testing of earth resistance of all earthing as directed by Engr-in-charge. (xviii) Checking of DC voltage of system as directed by Engr-in charge.
Material & labour for complete removal of 4 pole along with Air Break on load 11 KV indoor switch gear complete with accessories & removal of HT 11 KV cables carefully for reconnection complete also Supplying , installation, testing and commissioning of 11 KV, 630 Amps having short circuit capacity 20kA/3-sec, Indoor (IP54), RMU (Ring main unit) 7-way comprising of 02 Nos motorized operated Load Break Switch and 05 Nos 630 Amp Fixed-Type motorized spring-charging VCB electrolytic grade copper busbars all inside single, gas-filled, robotically welded stainless steel 304 (Non Ferrite Non Megnetic Grade) tank with min. thickness 3+0.5 mm, IP 67 Degree of Protection , internal-arc classified 20kA/1sec, on-site-repairable with site replacable bushing/coupling/mechanism, gas refilling etc. The enclosure shall have padlockable double-door access with anti-theft higes, fully covering the front facia and cable boxes to ensure fail-safe anti-theft protection. The unit alongwith Bus-connected, fixed-type Auxiliary transformer shall include the following along with all necessary accessories and fittings as required at site.
(A) 02 Nos. Incoming Load Break Switch module each consisting of following accessories :- (i) Each switching-unit is designed as a three position switch. This three function switch combines the functions of switch-disconnector and earthing switch. (ii) 11kV, 630A Load Break Switch with interlocked line-earthing scheme both short circuit current - 20kA/3-sec, Making Capacity - 50kAp -01 No (iii) Auxiliary contacts - 1NO + 1NC-01 No (iv) Spring-assisted snap-action motorized mechanism with un-inhibited operating shaft for emergency manual operation with integrated earthing switch -01 No (v) Cable terminals (site replacable Cable bushings situated not beyond 300mm from cable-cover to allow ease of access for installation/testing/replacement purposes) with double-door arrangement for enhanced safety (IP54+IP3X) interlocked to prevent access upto 11 KV , 300 Sqmm , 3 Core , XLPE AL cable termination in live-condition. Each Set of 03 (vi) Right angle boots (push on type)-Each Set of 03 (vii) Arc proof cable covers having cable entry from bottom , front with Interlocking mechanism including earth switch -01 No (viii) Capacitive voltage indication fixed type system as per IEC61243 with LED - 01 Set (ix) Fault Passage Indicator - It is to be provided for each incomer load break unit, FPI with LED/digital display to be added for detection of cable fault-01 No (x) ON, OFF, EARTH mechanical indication on the front mimic of the panel - 01 No
(B) 05 Nos. Outgoing VCB module each consisting of following accessories :- (i) Each function-unit consists of a vacuum-circuit breaker in combination with a three position-switch.The three-position-switch fulfills the operation of the disconnector-function and earthing function. (ii) 11kV, 630A Fixed-Type VCB module with series disconnector cum earthing switch of short circuit breaking current/withstand - 20kA/3-sec, Making Capacity - 50kAp-01 No (iii) Aux. contacts - 1NO+1NC-01 No (iv) Stored-energy motorized high-endurance spring charging mechanism (M1+), with inbuilt spring-charging lever and mechanically latched ON/OFF push-buttons to allow handle-less and un-inhibited operation -01 No (v) Cable terminals (site replacable Cable bushings situated not beyond 300mm from cable-cover to allow ease of access for installation/testing/replacement purposes) with double-door arrangement for enhanced safety (IP54+IP3X) interlocked to prevent access upto 11 KV , 185 Sqmm , 3 Core, XLPE AL cable termination in live-condition. Each Set of 3 (vi) Right angle boots (push on type)-Each set of 3
(vii) 3O/C + 1E/F self powered numerical protection relay with Low and High set for Over current and Earth Fault. Relay should have facility to display the maximum loaded phase current also.Relay shall record minimum 5 fault records with time stamping. Relay shall be communicable with RS 485 Port on MODBUS Protocol-01 No (viii) Associated ring-core cast-resin insulated CTs 50/1 Amp , 2.5 VA, 10P10 for protection for three outgoing and CTs 200 /1 Amp for one outgoing- Each Set of 3 (ix) Arc proof cable covers with self Interlocking mechanism with earth switch -01 No (x) Capacitive voltage indication fixed type system as per IEC61243 with LED -01 No (xi) Push button for breaker trip (xii) Shunt trip coil 24V DC - 01 (xiii) ON, OFF, TRIP mechanical indication on the front mimic of the panel - 01. (xiv) Emergency Trip Push Button - 01.
(C) 01 No. Bus-connected, fixed-type Auxiliary transformer with floor-mounted compartment of matching height and depth, positioned along-side RMU to provide required aux. supply and metering consisting of following accessories :- (i) 1-Ph (11kV/rt3):230VAC, 500VA Auxiliary transformer-01 No (ii) 2x12 Volt DC battery-01 Set (iii) Battery charger-01 No (iv) HRC fuse-links for primary side isolation and AC/DC MCBs for secondary isolation-01 Set (v) Voltmeter & RYB LED Indications to confirm AC/DC supply availability-01 Set (vi) Anti-condensation space-heater-01 No (vii) CFL lamp for illumination and 3-pin socket with switch -01 No
(D) Additional equipment deliverd separately or mounted seperately :- (i) Operationg Handle for Manual Isolator/Disconnector/Earthing Operation-02 Nos (ii) Standard Manometer -01 No (iii) Operation and Maintenance Manual -01 No (iv) Installation & Commissioning Manual -01 No (v) Cable clamping provision (standard) -01No
Note:- (i) It is preferable to have all feeder-switches inside single stainless steel compartment with incomer feeders at the extremities to prevent chances of failure due to plug-in coupling arrangement. (ii) Necessay interclocking arrangement shall be provided for safety and operations (iii) Above switchgear shall confirm to relevant IEC (62271-200) for design, manufacturing and internal arc compliance. Any claims towards internal arc compliance, number of mechanical/electrical/short-circuit operations, gas-leakage rates etc. shall not be accepted unless proven via type-test reports of model being offered. (iv) Cost of construction of foundation including construction material, necessary earth work and excavation in soft/loose soil as per manufacturer design for RMU complete all as required at site are deemed to be included in the quoted rate.
Supply install & commissioning of Battery charger APEX SCR controlled automatic float cum boost charger and DC distribution board in a common cubicle. The charger is suitabe for 230 V +/- 10% Single phase AC input and the with two output of 24 Volt and 48 Volt, is suitable to float/Boost charge with 100 AH batteries and also supply load. The output remains constant within +/-2% for AC voltage variation 230 V and load variation 0-100% comprising of:(a) Batteries 2 Volts 100 AH - 24 Nos VRLA cells in modular form sealed maintenance free . (b) Current Rating 40 Amps. (c) Incomer MCB DP 63 A - 01 No. (d) Outgong MCB DP 20 Amps - 03 Nos.
(a) Input working voltage-180 -270 Volts (b) Nominal Input Voltage - 230 V , AC , 50 Hz,1 (c) On load input power factor - > 0.8 (d) On load unit watt efficiencies-> 80% (e) No load losses of complete charge-< 10% (f) Ripple contents on the load (RMS)= 1% to 5% (g) Over load - 110% for 30 minutes and will give visual indication for over load condition.
(h) Boost charging - 2.4 V/Cell . (j) Float charging -2.15 V/Cell (k) Float cum boost charging-Automatically changes from one state to another state as per battery condition and will give the visual indication for either float or boost based on charging mode. (l) Reverse polarity -No damage will caused . A visual indication for reverse polarity will appear with an audio alarm. (m) Short circuit-MCB protecton provided. Make of battery charger. Statcon/Sinetrac/Amar Raja Make of batteries. Exide/Amaron/Okaya
Ridhi engineers and builders
M/s Birja Nand
Vijay Electricals
MV Engineers And Contractors
Buddham Builders
M/s JAIMAA ASSOCIATES
Rajindera Enterprises
Unitech Enterprises
mayur enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .