Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹2.9 Cr+₹4.9 L (1.73%)Rejected-Finance | ₹2.9 Cr+₹4.9 L (1.73%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹3.0 Cr+₹18.5 L (6.53%)Rejected-Finance | ₹3.0 Cr+₹18.5 L (6.53%) | L3 | Rejected-Finance Due to L3 |
| 4 | L4₹3.0 Cr+₹20.7 L (7.33%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹3.0 Cr+₹20.7 L (7.33%) | L4 | Rejected-Finance Due to L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | R.B.S. CONSTRUCTION L3 | M/S BADRI SINGH L4 | M/S LALMANI MAURYA L1 | SRI NATH INFRA CONSTRUCTIONS LLP L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation of foundation for launching apron and slope cutting for boulder stepping etc in all type of soil including all lead, lift & labour charges etc. for proper completion of work. | 7,384 | Cum. | 50 ₹3,69,200 Lowest | 75 ₹5,53,800 | 76 ₹5,61,184 | 77.43 ₹5,71,743.12 |
| 2.00 | Supplying and Laying E.C. bag filled with Earth/R.B.M. for making platform behind the crated boulder stepping work on slope including cost of all material, labour T&P etc. for proper completion of work. | 16,500 | No. | 10 ₹1,65,000 Lowest | 28 ₹4,62,000 | 33 ₹5,44,500 | 33.62 ₹5,54,730 |
| 3.10 | Supplying & Laying Machine Made Hexagone shape 10 SWG A Class Zinc Coated G.I. wire crate of size 2.50 m x1.50 m x1.00 m. made with mesh size 100mm. x120 mm. for crated boulder stepping over slope including all cost of material, labour and T&P etc. for proper completion of work. | 2,023 | No. | 2,400 ₹48,55,200 Lowest | 2,665 ₹53,91,295 | 2,500 ₹50,57,500 | 2,526.5 ₹51,11,109.5 |
| 3.20 | Supplying & Laying Machine Made Hexagon shape 10 SWG A Class Zinc coated G.I. wire crate of size 2.00 m x1.50 m x0.50 m. made with mesh size 100mm. x120 mm. for crated boulder Launching appron including all cost of material, labour and T&P etc. for proper completion of work. | 2,560 | No. | 1,800 ₹46,08,000 | 1,430 ₹36,60,800 Lowest | 1,520 ₹38,91,200 | 1,548.5 ₹39,64,160 |
| 4.00 | Supplying and placing stone boulder (25 to 60) Kg. in G.I. wire crate of size 2.50 m x1.50 m x1.00 m. pitching in stepping and Launching appron including all cost of material, labour and T&P etc but excluding cost of G.I. wire crate. | 11,426 | Cum. | 1,700 ₹1,94,24,200 | 1,720 ₹1,96,52,720 | 1,530 ₹1,74,81,780 Lowest | 1,559.99 ₹1,78,24,445.74 |
| 5.00 | Supplying and laying Geo textile sheet below pitching made 240 GSM woven multifilament polypropylene yarn including all cost of material, labour and T&P etc. | 7,371 | Sqm | 100 ₹7,37,100 | 90 ₹6,63,390 Lowest | 105 ₹7,73,955 | 105.14 ₹7,74,986.94 |
Tender Value
Refer Docs
EMD Value
₹7.1 L
Closing Date
23 Mar 2026, 2:00 pmClosed
SE IWC MIRZAPUR
SE IWC Irrigation Colony Fatha MIRZAPUR
ANTI EROSION WORK FOR THE PROTECTION OF VILLAGE- BHATAULI ON RIGHT BANK OF RIVER GANGA IN DISTT.- MIRZAPUR
2026_UPIDC_1122256_7
10/SE/2025-26
Open Tender
Civil Works
Item Wise
90 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.1 L
21 May 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Excavation of foundation for launching apron and slope cutting for boulder stepping etc in all type of soil including all lead, lift & labour charges etc. for proper completion of work.
Supplying and Laying E.C. bag filled with Earth/R.B.M. for making platform behind the crated boulder stepping work on slope including cost of all material, labour T&P etc. for proper completion of work.
Supplying & Laying Machine Made Hexagone shape 10 SWG A Class Zinc Coated G.I. wire crate of size 2.50 m x1.50 m x1.00 m. made with mesh size 100mm. x120 mm. for crated boulder stepping over slope including all cost of material, labour and T&P etc. for proper completion of work.
Supplying & Laying Machine Made Hexagon shape 10 SWG A Class Zinc coated G.I. wire crate of size 2.00 m x1.50 m x0.50 m. made with mesh size 100mm. x120 mm. for crated boulder Launching appron including all cost of material, labour and T&P etc. for proper completion of work.
Supplying and placing stone boulder (25 to 60) Kg. in G.I. wire crate of size 2.50 m x1.50 m x1.00 m. pitching in stepping and Launching appron including all cost of material, labour and T&P etc but excluding cost of G.I. wire crate.
Supplying and laying Geo textile sheet below pitching made 240 GSM woven multifilament polypropylene yarn including all cost of material, labour and T&P etc.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
tdLlot02retender.pdf
Tender Documents • 1.86 MB
BOQ_2099696.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .