| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAccepted-AOC 13 29 3RD FLOOR EAST PATEL NAGAR NEW DELHI 110 008 | WEST | DELHI | 110008 | ₹10.8 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹10.8 CrRejected-Finance FARIDABAD | FARIDABAD | HARYANA | 121001 | ₹10.8 Cr | L2 | Rejected-Finance Not being lowest |
| 3 | L3₹11.4 CrRejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹11.4 Cr | L3 | Rejected-Finance Not being lowest |
| 4 | L4₹11.7 CrRejected-Finance | ₹11.7 Cr | L4 | Rejected-Finance Not being lowest |
| 5 | L5₹13.1 CrRejected-Finance | ₹13.1 Cr | L5 | Rejected-Finance Not being lowest |
Tender Value
₹11.9 Cr
EMD Value
₹9.2 L
Closing Date
20 Jul 2022, 6:00 pmClosed
Chief Engr Delhi Zone
HQ CE Delhi Zone Delhi Cantt-10
REPLACEMENT OF EXISTING METERS WITH PRE-PAID METERS IN MD ACCN AT DELHI CANTT-10
2022_MES_522229_1
CEDZ/TOKEN-17 OF 2022
Open Tender
Civil Works
270 days
Delhi Cantt
As per NIT documents
9 documents required · 9 mandatory
₹3,000
GE Central
₹9.2 L
Yes
12 Sept 2022
10 May 2022
22 Jul 2022
10 May 2022
20 Jul 2022
4 Jul 2022
Amount
Design, Supply, Install, Commission, Integrate and Maintain the Advanced Metering Infrastructure (AMI) in Delhi Cantt capable of handling atleast 20000 meters with provision of scalability of 100% expansion comprising of following:- (a) Supply, Installation, Comissioning & Maintenace of Smart Meters (IS-16444) with pre paid features with RF Mesh compatible NIC (Network Interface Card) /GPRS enabled etc. (b) Integration with Communication Network & Infrastructure as per CEA guidelines for AMI, Network Management System (NMS), Head End System (HES), MDM with Data Analytics during the contract period. (c) Cyber Security Management during the contract period. Cyber Security Audit for carrying out by an Indian Computer Emergency Responce Team (CERT-In) empaneled security auditor. (d) Mobile Application & Web Portal for Energy Consumption monitoring, Complaints, Bill view and Payment, Meter status, Alerts & Notifications etc. (e) Web based MIS Portal & Dashboard for utility for information. (f) Integration of different devices / equipment / softwares covered in scope of this project with each other as per functional requirements. (g) Trainings of MES staff. Note : Smart Meter, Server and UPS will be paid separately under respective items.
Smart Meter based on Cellular Communication Technology Supply, Installation, Testing and Commisioning of Smart Meter (IS 16444), AC whole current, single phase, 2 wires Smart Energy Meter of rating 10-60A complete as specified in CEA notification. The meter shall communicate with Head End System (HES) on any of the communication technologies mentioned in IS 16444 Part 1 in a secure manner. The smart shall be based on cellular communication technology.
Suppy of suitable Server (Main/Back up) suitable for upto 40000 smart meters for storing all parameters @ interval of 30 minute for minimum 5 years.. Note:- (a) Broadband or lease line internet connection for the server would be provided by the department. (b) Department would provide dedicated dust free and air conditioned room for the server.
Supply, Installation and Testing of online UPS (5KVA) with isolation transformer suitable for single phase AC input & single phase AC out put with 30 min backup.
Description of Work / Item(s)
Amount
Comprehensive Maintenance during 1st year of Defects Liability Period Comprehensive maintenance of entire system provided under Sch 'A' Part-I in order to ensure proper data exchange among Smart meter, MDMS, HES and other operational / requisite software as part of fully functional Advacne Metering Infrastructure (AMI) system shall be carried be with help of OEM and its authorized service provider including operating costs during 1st year of defect liability period. Comprehensive maintenance shall include following items :- (a) Monthly SIM charges for the Communication System such as cellular communication based meters / gateways. The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the SIM or SIM provider as required. In case of network issues, the contractor would liaison with the telecom service provider for necessary resolution. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (c) Software AMC. This include necessary upgradation in the software such as support to the chrome browser changes, android version changes, iOS version changes. These changes happen on frequent basis and the software would support all the changes.
(d) Replacement of defective meter installed in this contract within 72 Hrs without any extra cost to the department. (e) Software upgrade due to changes in the government tariff structure or free electricity entitlement. (f) Remote server admin support – Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (g) Report Development – The additional report as needed for the success of the project would be developed. (h) The communication network monitoring and support. (j) Configuration of the repaired / replaced hardware in the system. (k) Monthly bill generation and soft / hard copy submitted to office. (l) Provide meter recharge Nil status after occupation / vacation in 30 days. Note :- Cost is inclusive of all the itmes mentioned above. The accounting unit is however based on the number of meters for comprehesnive maintenance.
Comprehensive Maintenance during 2nd year of Defects Liability Period All as per item No 1 above but during 2nd year of Defects Liability Period.
Comprehensive Maintenance during 3rd year after completion of work i.e. 1st year after Defects Liability Period All as per item No 1 above but during 3rd year after completion of work i.e. 1st year after Defects Liability Period.
Comprehensive Maintenance during 4th year after completion of work i.e. 2nd year after Defects Liability Period All as per item No 1 above but during 4th year after completion of work i.e. 2nd year after Defects Liability Period.
Comprehensive Maintenance during 5th year after completion of work i.e. 3rd year after Defects Liability Period All as per item No 1 above but during fth year after completion of work i.e. 3rd year after Defects Liability Period.
Leo Air and Power Solution pvt Ltd.
ASSOCIATED CONSTRUCTION CO.
N K BUILDERS
Global Enterprises
FRIZO INDIA PVT LTD
B D Raizada Projects Pvt Ltd
C S CONSTRUCTION COMPANY PVT. LTD.
Leo Air and Power Solution pvt Ltd.
ASSOCIATED CONSTRUCTION CO.
Global Enterprises
GEPS PROJECTS
C S CONSTRUCTION COMPANY PVT. LTD.
B D Raizada Projects Pvt Ltd
FRIZO INDIA PVT LTD
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid