| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹8.0 LRejected-Finance ERODE | TAMIL NADU | 638451 | ₹8.0 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | C. PADIKKASU L2 | S.RajeshKannan L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kalaiarangam at near Kondaiyarkoil in Kaikkulanvayal Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 10.23 | cum | 265 ₹2,710.95 | 263.5 ₹2,695.61 |
| 3.00 | Filling with Other than Sand not more 40 cm thick in layers, rammed watered and compacted., complete complying to standard specification. | 14.49 | cum | 46 ₹666.54 | 45.8 ₹663.64 |
| 4.00 | Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification. | 4.15 | cum | 1,925 ₹7,988.75 | 1,924.4 ₹7,986.26 |
| 5.00 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete | 5.36 | cum | 5,650 ₹30,284 | 5,648.5 ₹30,275.96 |
| 6.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 12.49 | Cum | 9,280 ₹1.2 L | 9,279.4 ₹1.2 L |
| 7.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification. | 0.9 | MT | 92,500 ₹83,250 | 91,932 ₹82,738.80 |
| 8.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 146.1 | Sqm | 1,120 ₹1.6 L | 1,095 ₹1.6 L |
| 9.00 | Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor. | 16.61 | Cum | 6,150 ₹1.0 L | 6,130.4 ₹1.0 L |
| 10.00 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete | 2.74 | cum | 4,030 ₹11,042.20 | 4,027 ₹11,033.98 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
25 Feb 2026, 3:00 pmClosed
Bdo,Arimalam
Pt.union Office,Arimalam
Construction of Kalaiarangam at near Kondaiyarkoil in Kaikkulanvayal Panchayat.
2026_RDTN_661018_1
Arm/MLACDS/Work
Open Tender
Civil Works
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
24 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Construction of Kalaiarangam at near Kondaiyarkoil in Kaikkulanvayal Panchayat
Earth work excavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Filling with Other than Sand not more 40 cm thick in layers, rammed watered and compacted., complete complying to standard specification.
Supplying and filling in foundation and basement with FILLING SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification.
Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification.
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete
Fabrication and supply of MILD STEEL DOOR of size 1.10 m x 2.00 m with including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Fabrication and supply of MILD STEEL WINDOW of size 0.90 m x 1.20 m with including all cost and conveyance of all materials to worksite and all labour charges etc., complete
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete complying with standard specification as directed.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete
Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification.
White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete.
Distember two coats over one coat of primary coat including cleaning preparing the surface one coat of primer.
Painting two coats with Exterior emulsion over one coat of primary coat including cleaning preparing the surface
Painting TWO coats of new iron works such as steel doors, windows, ventilators approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specification.
Wiring with 2x1.5 sqm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V Grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box with with 5A. F.T. sqitch inflush with wall, covered with hylem sheet of sheet of 3mm thick with painting of suitable colour of open PVC Light POINT / FAN POINT including all charges etc., complete.(As per S.D.20)
Light point
Fan point
Supply of G.I.pipe for service wire connection for EB port to Main. SD No.68)
Supply of 3 pin plug point including all labour charges etc., complete (SD No.35)
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 25 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Arm-Doc.pdf
Tender Documents • 0.17 MB
BOQ_793275.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid