| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L1₹39.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 3 | L2₹41.7 L+₹2.2 L (5.56%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 4 | L2₹41.7 L+₹2.2 L (5.56%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 5 | L3₹41.7 L+₹2.2 L (5.56%)Accepted-AOC | L3 | Accepted-AOC L3 |
Tender Value
₹43.9 L
EMD Value
₹87,763
Closing Date
4 Jan 2025, 3:00 pmClosed
EXECUTIVE ENGINEER SIBSAGAR AND DEMOW RD. DIVN
O/T EXECUTIVE ENGINEER SIBSAGAR AND DEMOW RD. DIVN
Construction of road Gayanor Chuk Path AND 10 OTHERS under SOPD-G for the year 2024-25 under Sibsagar and Demow Territorial Road Division PACKAGE 4
2024_PWD_41671_1
2024_PWD_41372_1
Open Tender
Civil Works – Roads
Works
90 days
Gayanor Chuk Path AND 10 OTHERS
AS PER DNIT
4 documents required · 4 mandatory
₹878
₹87,763
Yes
29 Jan 2025
25 Dec 2024
6 Jan 2025
25 Dec 2024
4 Jan 2025
25 Dec 2024
25 Dec 2024 - 4 Jan 2025
Amount
Gayanor Chuk Path (L= 400.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Dunia Mukh Bornamghar Path (L= 220.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Majorbari Path (L = 200.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Sitaldubi Path (L= 500.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Approach road Bukabil Health Center (L= 50.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Tonkeswar Hazarika Path (L= 150.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
2 No Boliaghat Baruahchuk Path (L= 300.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Neogor Chuk Path (L= 600.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Khatual Bornamghar Path (L= 250.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Golap Ali Path (L= 150.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Noor Ali Path (L= 150.00m)
Heavy dressing of the existing road including dressing high spots, filling low spots and making up loss of material/irregularities,removing of all vegetation, cambering,watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. Works to be carried out in accordance with Technical Specification and as directed by the Engineer
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
SAHJAHAN ALI (BID ID -254126)
SRI JINTU SAIKIA (BID ID -253418)
KG ASSOCIATES (BID ID -254155)
SRI MANOJ BORAH (BID ID -253970)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .