Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹94,465
EMD Value
₹1,200
Closing Date
8 Sept 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt), Valangaiman
BDO Office, Valangaiman, Tiruvaru District
Renovation of PUE School Toilet and Kitchen Shed at Paithancheri in Aravoor Pt. Retender Package No.7
2022_RDTN_249740_1
1972/2022/A2_VLG SIDS_Retender-7
Open Tender
Civil Works
Item Rate
180 days
Valangaiman block
As per Document
4 documents required · 4 mandatory
₹0
₹1,200
19 Sept 2022
3 Sept 2022
8 Sept 2022
3 Sept 2022
8 Sept 2022
3 Sept 2022
Amount
1. Renovation of PUE School Toilet Building At Paithecheri Habitation ,
Clean Removal Of Plastering surface and racking out joints including cost and conveyance of all materials to site ansd labour charges etc complete
Dismantling and clearing the existing cement concret flooring including cost and conveyance of all materials to site and labour charges etc. complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and allCement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Flooring with granolithic flooring with CM 1:2 mix using 10-12 mm ISS mettal to 25mm thick including cost and conveyance and all other laboures etc complete
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Distempering two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Specifications etc., Complete
Provision for Repairs charges for Doors and Windows
Provision for Wash basin charges
Provision for Name Board
2 Renovation of PUE School Kitchen Shed At Paithecheri Habitation
Clean Removal Of Plastering surface and racking out joints including cost and conveyance of all materials to site ansd labour charges etc complete
Earth work excavation for foundation in all soil and to full depth etc. complete as per std specification etc. complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and allCement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in Cement mortar 1:5 mix using country bricks at of size 8 3/4 x 4 1/4 x 2 1/4 Including all labour Charges. As per standard Specification
Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Flooring with granolithic flooring with CM 1:2 mix using 10-12 mm ISS mettal to 25mm thick including cost and conveyance and all other laboures etc complete
Ceiling Plastering with CM 1:3,10mm thick. complete complying with standard specifications and as directed by the departmental officers.
White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats over Old Wooden works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Specifications etc., Complete
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting two coats over Old Iron works such as Wood doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard Specifications etc., Complete
Prvision for Repairs charges for DOOr and Windows
Electrical Work
Tube Light Fitting
Exasut Fan
CFL bulb
Service wire
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.PRITHIVIRAJAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .