Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC BIRSINGHPUR PALI DIST UMARIA MP | BIRSINGHPUR PALI | UMARIA | MADHYA PRADESH | L1 | Accepted-AOC L1 Bidder |
Tender Value
₹8.7 L
EMD Value
₹11,000
Closing Date
3 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Survey Officer Johilla Area SECL
Area Survey Dept GM Office Johilla Area Nowrozabad Dist Umaria MP Pin 484555
Construction of 30 Nos. Ventilation stopping (Through construction of RCC Slab) in Seam No.IV 25LE Panel and 12LE/1DE in UG at Umaria Colliery, Umaria Sub Area of Johilla Area
2023_SECL_268139_1
SECL/GM/JOH/Survey/ eTender/22-23/34 dt-18/01/2023
Open Tender
Civil Works - Others
Item Rate
365 days
Umaria Colliery
3 documents required · 3 mandatory
₹11,000
20 Mar 2023
19 Jan 2023
6 Feb 2023
19 Jan 2023
3 Feb 2023
20 Jan 2023
19 Jan 2023 - 24 Jan 2023
Amount
Item Description/ Heading
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In Coal)
Groove cutting manually by using chised/pick-axe in solid coal/stone for foundation, manhole/duggi hole /pits and excavated material to be removed and stacked separately within 50 Mtr. distance. (In Soft Stone)
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone Chips :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Steel :
Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Bricks :
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforecement- all work upto plinth level : 1:2:4 (1 Cement : 2 Coarse sand : 4 Graded stone aggregate 20 mm nominal size)
Brick work with fly ash bricks in foundation and plinth (upto height 1.50 Mtrs from floor) in cement morter 1:6 (1:Cement, 6:Coarse Sand) complete as per instruction of E/C.
Brick work with fly ash bricks in foundation and plinth (above height 1.50 Mtrs from floor) in cement morter 1:6 (1:Cement, 6:Coarse Sand) complete as per instruction of E/C.
6 mm thick cement plaster (1:4, 1 Cement: 4 coarse sand) on RCC/PCC work up to 5 Mtr. and above in UG including curing etc. complete. (excluding cost of materials)
Material rate : For Sand
Material rate : For Stone Chips/ Metal (20mm)
Material rate : For Cement : (50 Kg./Bag)
Material rate : For Steel / Twist Bar (6mm)
Materila Rate : For Bricks (Fly ash) (190X90X90MM)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
techsummary_277421.pdf
PDF • 0.38 MB
finsummary_277421.pdf
PDF • 0.48 MB
LOANIT34.pdf
PDF • 2.17 MB
finance_277421.pdf
PDF • 0.37 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .