Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 LAccepted-AOC | 1 | Accepted-AOC OK | |
| 2 | 2₹6.7 L+₹7,212 (1.09%)Rejected-Finance | 2 | Rejected-Finance OK |
Tender Value
₹6.7 L
EMD Value
₹6,700
Closing Date
13 Jun 2023, 3:00 pmClosed
THE COMMISSIONER TIRUCHENGODE MUNICIPALITY
TIRUCHENGODE MUNICIPALITY
WATER SUPPLY FUND 2023-24 Providing HDPE and PVC Pipe TCS Nagar ponnusamy Community hall to Erode road Distribution line in Tiruchengode Municipality.
2023_MAWS_322895_8
1081/2023/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
180 days
TIRUCHENGODE MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,700
28 Aug 2023
5 Jun 2023
13 Jun 2023
5 Jun 2023
13 Jun 2023
5 Jun 2023
Amount
Earth work excavating and depositing on bank within initial lead of 10m and lift of 2m in all soils and sub-soils for foundation except hard rock as directed by the departmental officer all labour charges etc., complete as per standard specification.(For Pipe Laying Work)
Labour Charges For Cutting open BT Road/ Maccadam Road for laying water mains including all charges etc and complete as per standard specification, and as directed by departmental officers.
Supply and Delivery following GI pipes and specials with relevant IS standards and conforming AS PER IS 1239/PART I/2004/ PVC Pipes and conveyance to site, and all labour charges as directed by the departmental officers.
80 MM Dia GI Pipes B class Medium
140mm dia PVC Pipe
80mm dia 3" GI/CI End cap
80mm dia GI Bend
90mm dia 3" PVC Coupler
90mm dia 3" PVC Tee
3" HDPE Hose Clip
3" HDPE Hose Collar
3" MS Flange set
3" PVC Long Coupler
90mm dia 3" PVC FTA
2" HDPE Hose Clip
2" HDPE Hose Collar
3" PVC Bend
3" PVC Elbow
80mm dia CI D/F SLUICE VALVE WITH CAP/ WHEEL AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING
Supply and Delivery following HDPE PIPES PE 100 AS PER IS 4984/2016 /PVC Pipe and conveyance to site, and all labour charges as directed by the departmental officers.
90 MM Dia HDPE Pipes
Cutting and Threading of the following size of GI pipes of the following sizes including cost for conveyance and all labour charges etc., complete as per standard specification.
Cutting of 80 mm dia GI Pipes
Threading of 80 mm dia GI Pipes
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and as per IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supplyarrangements etc., complete as per directed by TWAD Board Officers.
90 MM Dia HDPE Pipes
Laying of GI / HDPE/PVC Pipes and Specials to proper line and level including jointing but excluding cost of Pipes and jointing materials for plumbing works for providing water supply arrangements etc.,complete.
65 mm to 150 mm dia GI Pipe
90mm to 110mm dia (OD) HDPE pipe
125-160mm dia PVC Pipe
Refilling trenches with Excavated earth including watering, ramming and consolidated as directed by the departmental officer etc., complete.Asper standard specification ( For Pipe Laying Work )
For Pipe laying
M/S JAYAM MAARUTHI ELECTRICALS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .