Tender Value
₹17.1 L
EMD Value
₹34,120
Closing Date
26 Oct 2026, 2:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Construction Leh
Executive Engineer Construction Leh
Development of Urban Road in Leh under traffic Transportation and road network and footpath in various wards of MC Leh and Kargil (main road to Ice Hockey Rink Leh).
2026_PWD_19749_1
CDL 83 of Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
20 days
Leh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Executive Engineer Construction Leh
₹34,120
20 Oct 2026
20 Oct 2026
27 Oct 2026
20 Oct 2026
26 Oct 2026
20 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means(hydraulic excavator) over areas (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m , as directed by Engineer-in- charge. :All kinds of soil | 172.05 | Cum | 208.45 | ₹35,863.82 |
| 2 | Providing and laying of dry stone soling (any thickness) on horizontal level including cost of stone. | 57.35 | Cum | 537.71 | ₹30,837.67 |
| 3 | Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 57.35 | Cum | 5,725.33 | ₹3,28,347.68 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | 34.09 | Cum | 6,417.77 | ₹2,18,781.78 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 107 | Sqm | 306.15 | ₹32,758.05 |
| 6 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : New work (two or more coats)over and including water thinnable priming coat with cement primer | 135.75 | Sqm | 157.36 | ₹21,361.62 |
| 7 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 17.89 | Cum | 8,504.17 | ₹1,52,139.6 |
| 8 | Providing and laying 40mm thick factory made cement in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid joints with line sand etc. all complete as per the direction of Engineer-in-charge. | 494 | Sqm | 1,130.69 | ₹5,58,560.86 |
| 9 | Carriage of material by MT a) Cement / steel ---------avg lead 2 km | 17.25 | Cum | 135.27 | ₹2,333.41 |
| 10 | Sand/ stone Agg. 15 KM Avg. lead 15 KM | 118.87 | Cum | 328.13 | ₹39,004.81 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_46635.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .