Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹48.7 CrAdmitted-Finance | ₹48.7 Cr | H1 | Admitted-Finance |
| 2 | H2₹45.3 Cr−₹3.4 Cr (7.00%)Admitted-Finance | ₹45.3 Cr−₹3.4 Cr (7.00%) | H2 | Admitted-Finance |
| 3 | H3₹42.7 Cr−₹6.0 Cr (12.3%)Admitted-Finance | ₹42.7 Cr−₹6.0 Cr (12.3%) | H3 | Admitted-Finance |
| 4 | H4₹40.9 Cr−₹7.8 Cr (15.9%)Admitted-Finance | ₹40.9 Cr−₹7.8 Cr (15.9%) | H4 | Admitted-Finance |
| 5 | H5₹39.8 Cr−₹8.9 Cr (18.2%)Admitted-Finance | ₹39.8 Cr−₹8.9 Cr (18.2%) | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jal Instruments H4 | NR EPC PROJECT PRIVATE LIMITED H1 | M/s Bhagwati Enterprises H6 | Radikale Engineering Pvt Ltd H5 | GORAKSHANATH TRADERS AND CONSTRUCTION H3 | BHASKAR BHATTAR H2 | AE Infraprojects Pvt ltd H8 | KRISHNA CONSTRUCTION (Gujarat) LLP H7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | 1. Designing, Providing and Construction, Hydraulic Testing, Commissioning of 3 nos of STP of Capacity 4.1,4.4 & 2 MLD.
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, construction of 2.0 No. s of Interception and Diversion structure.
3. Strengthening of 1 No Rcc Drain length 1000 m.
4. Construction of 2 Nos Pumping Station Capacity-4.4 &4.1 MLD
5. Provision of pumping Main Pipe DI- K9 Pipes of Dia-250&300 MM, Length-2000&2200 M for pumping Station to STP
6. Provision of Gravity Main Pipe RCC NP3 Pipes of Dia-500 MM, Length-30 M for I&D Structure to Pumping station.
7. Provision of 3 Nos. Electric Substation & Laying 3.0 KM HT Feeder Connection up to Sewerage Treatment Plant & Pumping Station
8. Construction Of 3.0 Nos RCC Sump Well Capacity 50 Kl, 2 No Pump & HDPE PN-6 Pipe Dia -90 MM Length 1500 M For Reused arrangement. | 1 | nos | 26,04,89,969 ₹26,04,89,969 | 32,54,34,000 ₹32,54,34,000 | 25,27,42,000 ₹25,27,42,000 | 25,61,87,500 ₹25,61,87,500 | 25,64,66,768 ₹25,64,66,768 | 26,05,35,737 ₹26,05,35,737 | 24,74,86,000 ₹24,74,86,000 Lowest | 26,02,70,135 ₹26,02,70,135 |
| 1.02Operation and Maintenance Cost next 10 Years | |||||||||||
| 1.03 | 1st Year | 1 | nos | 32,29,200 ₹32,29,200 | 30,00,000 ₹30,00,000 | 28,75,000 ₹28,75,000 Lowest | 30,00,000 ₹30,00,000 | 35,80,000 ₹35,80,000 | 49,50,179 ₹49,50,179 | 55,00,000 ₹55,00,000 | 30,49,800 ₹30,49,800 |
| 1.04 | 2nd Year | 1 | nos | 34,22,952 ₹34,22,952 | 33,00,000 ₹33,00,000 | 30,18,750 ₹30,18,750 Lowest | 32,10,000 ₹32,10,000 | 37,94,800 ₹37,94,800 | 52,47,189.74 ₹52,47,189.74 | 58,30,000 ₹58,30,000 | 32,32,788 ₹32,32,788 |
| 1.05 | 3rd Year | 1 | nos | 36,28,329.12 ₹36,28,329.12 | 35,00,000 ₹35,00,000 | 31,69,688 ₹31,69,688 Lowest | 34,34,700 ₹34,34,700 | 40,22,488 ₹40,22,488 | 55,62,021.13 ₹55,62,021.13 | 61,79,800 ₹61,79,800 | 34,26,755 ₹34,26,755 |
| 1.06 | 4th Year | 1 | nos | 38,46,028.87 ₹38,46,028.87 | 37,00,000 ₹37,00,000 | 33,28,172 ₹33,28,172 Lowest | 36,75,129 ₹36,75,129 | 42,63,837 ₹42,63,837 | 58,95,742.4 ₹58,95,742.4 | 65,50,588 ₹65,50,588 | 36,32,360 ₹36,32,360 |
| 1.07 | 5th Year | 1 | nos | 40,76,790.6 ₹40,76,790.6 | 39,00,000 ₹39,00,000 | 34,94,580 ₹34,94,580 Lowest | 39,32,388.03 ₹39,32,388.03 | 45,19,668 ₹45,19,668 | 62,49,486.94 ₹62,49,486.94 | 69,43,623.28 ₹69,43,623.28 | 38,50,301 ₹38,50,301 |
| 1.08 | 6th Year | 1 | nos | 43,21,398.04 ₹43,21,398.04 | 42,00,000 ₹42,00,000 | 36,69,309 ₹36,69,309 Lowest | 42,07,655.19 ₹42,07,655.19 | 47,90,848 ₹47,90,848 | 66,24,456.16 ₹66,24,456.16 | 73,60,240.68 ₹73,60,240.68 | 40,81,320 ₹40,81,320 |
| 1.09 | 7th Year | 1 | nos | 45,80,681.92 ₹45,80,681.92 | 44,00,000 ₹44,00,000 | 38,52,775 ₹38,52,775 Lowest | 45,02,191.06 ₹45,02,191.06 | 50,78,298 ₹50,78,298 | 70,21,923.52 ₹70,21,923.52 | 78,01,855.12 ₹78,01,855.12 | 43,26,199 ₹43,26,199 |
| 1.10 | 8th Year | 1 | nos | 48,55,522.83 ₹48,55,522.83 | 48,00,000 ₹48,00,000 | 40,45,414 ₹40,45,414 Lowest | 48,17,344.43 ₹48,17,344.43 | 53,82,996 ₹53,82,996 | 74,43,238.94 ₹74,43,238.94 | 82,69,966.42 ₹82,69,966.42 | 45,85,771 ₹45,85,771 |
Tender Value
₹29.6 Cr
EMD Value
₹14.8 L
Closing Date
24 Jul 2026, 5:30 pmClosed
CMO Nagar Palika Parishad Tikamgarh
Nagar Palika Parishad Tikamgarh
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR TIKAMGARH TOWN UNDER SWACHH BHARAT MISSION UNDERA 2.0
2026_UAD_515255_1
3322/e-Tender/Tikamgarh/2026
Open Tender
Civil Works - Others
Lump-sum
365 days
Nagar Palika Parishad Tikamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹14.8 L
NAGAR PALIKA PARISHAD TIKAMGARH
17 Sept 2026
12 Jun 2026
27 Jul 2026
12 Jun 2026
24 Jul 2026
30 Jun 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Designing, Providing and Construction, Hydraulic Testing, Commissioning of 3 nos of STP of Capacity 4.1,4.4 & 2 MLD.
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer including survey, design, construction of 2.0 No. s of Interception and Diversion structure.
3. Strengthening of 1 No Rcc Drain length 1000 m.
4. Construction of 2 Nos Pumping Station Capacity-4.4 &4.1 MLD
5. Provision of pumping Main Pipe DI- K9 Pipes of Dia-250&300 MM, Length-2000&2200 M for pumping Station to STP
6. Provision of Gravity Main Pipe RCC NP3 Pipes of Dia-500 MM, Length-30 M for I&D Structure to Pumping station.
7. Provision of 3 Nos. Electric Substation & Laying 3.0 KM HT Feeder Connection up to Sewerage Treatment Plant & Pumping Station
8. Construction Of 3.0 Nos RCC Sump Well Capacity 50 Kl, 2 No Pump & HDPE PN-6 Pipe Dia -90 MM Length 1500 M For Reused arrangement. | 1 | nos | 29,64,69,000 | ₹29,64,69,000 |
| 1.02 | Operation and Maintenance Cost next 10 Years | - | - | - | - |
| 1.03 | 1st Year | 1 | nos | 35,88,000 | ₹35,88,000 |
| 1.04 | 2nd Year | 1 | nos | 38,03,280 | ₹38,03,280 |
| 1.05 | 3rd Year | 1 | nos | 40,31,477 | ₹40,31,477 |
| 1.06 | 4th Year | 1 | nos | 42,73,365 | ₹42,73,365 |
| 1.07 | 5th Year | 1 | nos | 45,29,767 | ₹45,29,767 |
| 1.08 | 6th Year | 1 | nos | 48,01,553 | ₹48,01,553 |
| 1.09 | 7th Year | 1 | nos | 50,89,647 | ₹50,89,647 |
| 1.1 | 8th Year | 1 | nos | 53,95,025 | ₹53,95,025 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tenderdocument1.pdf
Tender Documents • 2.02 MB
BOQ_620633.xls
BOQ • 0.34 MB
Annexure-E.pdf
Additional Documents • 2.63 MB
Corrizendum515255.pdf
PDF • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .