Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Fee/PreQual/Technical/Finance GPO IKANDAR DUMKA DIST DUMKA | DUMKA | DUMKA | JHARKHAND | -42.51% | ₹14.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹15.9 L+₹1.6 L (11.1%)Admitted-Fee/PreQual/Technical/Finance | -36.11% | ₹15.9 L+₹1.6 L (11.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹16.6 L+₹2.3 L (16.0%)Admitted-Fee/PreQual/Technical/Finance DUGARIYA DUMKA | -33.33% | ₹16.6 L+₹2.3 L (16.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹17.7 L+₹3.4 L (23.5%)Admitted-Fee/PreQual/Technical/Finance SHEKHAR KUMAR MANDAL | -28.99% | ₹17.7 L+₹3.4 L (23.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹18.5 L+₹4.2 L (29.6%)Admitted-Fee/PreQual/Technical/Finance H NO 71 WARD NO 14 WILLIAMS TOWN KRISHNAPURI DEOGHAR JHARKHAND | -25.52% | ₹18.5 L+₹4.2 L (29.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
12 Aug 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION DUMKA
RENOVATION OF NATURAL HOT WATER SPRING AT VILLAGE TANTLOI, P.S NO-01, BLOCK- RANESWAR IN DUMKA DISTRICT.
2026_RDSPL_116752_1
RDSD/DMK/UNTIED/28/26-27_Gr06
Open Tender
Civil Works
Percentage
120 days
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹50,000
14 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | - | cu.m | 151.82 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 20 mm nominal size) | - | cu.m | 4,125.41 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1 | cu.m | 5,218 | ₹5,212.78 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sq.m | 194.5 | ₹194.31 |
| 5 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 8mm (TMT coil Fe 500) | - | MT | 83,314.02 | - |
| 6 | (a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)}75% of Total | - | MT | 82,096.54 | - |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soil (UP TO 3 M DEPTH ) | 0.2 | cu.m | 138.3 | ₹27.52 |
| 8 | Sand Filling in foundation trenches as per drawing & technical specification | - | cu.m | 567.8 | - |
| 9 | Plain/Reinforced Cement concrete in open Foundation complete as per Drawing and Technical specifications. A PCC Grade M15 | 1 | cu.m | 3,971 | ₹3,967.03 |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed) | - | cu.m | 3,458.6 | - |
stage.html
html • 0.02 MB
finance_157860.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
six.pdf
Tender Documents • 0.68 MB
BOQ_157860.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .