Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance Won the lottery |
| 2 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Did not win the lottery |
| 3 | L1₹8.5 LRejected-Finance INCHUDI BALASORE | BALASORE | BALASORE | ODISHA | ₹8.5 L | L1 | Rejected-Finance Did not win the lottery |
| 4 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Did not win the lottery |
| 5 | L1₹8.5 LRejected-Finance | ₹8.5 L | L1 | Rejected-Finance Did not win the lottery |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
5 Jun 2026, 1:00 pmClosed
Superintending Engineer
O/o the SE, Kendrapara Irr. Division, Kendrapara
Canal improvement
2026_KIRRD_129770_13
e-Procurement Notice No.KID-02 of 2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
Kendrapara
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹8,500
Yes
24 Aug 2026
26 May 2026
6 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
26 May 2026 - 1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement etc.complete asper direction of Engineer in Charge. | 33,675 | One Sqm | 0.3 | ₹10,102.5 |
| 2 | Earth work excavation in all kinds of soil including rough dressing and levelling the canal bed & depositing the excavated materials away from the work site with all leads,lifts & delifts etc. complete as per direction of the Engineer-in-charge. | 1,438.58 | One Cum. | 175.4 | ₹2,52,326.93 |
| 3 | Earth work in slushy soil in water up to 0.60M (requiring the aids of pans and vessels) with all leads, lifts and delifts etc. complete as per direction of the Engineer-in-Charge. | 1,377 | One Cum. | 241.2 | ₹3,32,132.4 |
| 4 | Puddle filling good clay including digging stiff clay weathering pulverizing trodding & laying in proper position with initial lead of 50m & initial lift of 1.5m with all cost of labour charges etc. complete asper direction of Engineer in Charge. | 494.58 | One Cum. | 509.8 | ₹2,52,136.88 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
TechBidKID_66.pdf
Tender Documents • 1.11 MB
BOQ_592558.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .