| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.5 Craccepted-aoc | ₹2.5 Cr | accepted-aoc |
Tender Value
₹2.4 Cr
EMD Value
₹3.6 L
Closing Date
18 Apr 2026, 9:30 pmClosed
Public Works Department
Jayanna .R
One time improvement of road connecting NH373 to mosalehosahalli govt engineering college and Improvement of Roads in Bettadasathenahalli village limits along CNK Road in Holenarasipura Taluk and Improvements of Road in Chakenahalli Village limits along Huliyar Keralapura Road to Chakenahalli Cross.
PWD/2026-27/RD/WORK_INDENT35464
PWD/2026-27/RD/WORK_INDENT35464
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Hassan
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
List of Financial Resources with Certificates
ITT Clause 3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period i.e., 2021-22, 2022-23, 2023-24, 2024-25, 2025-26 (b) Mandating Satisfactorily completion as prime contractor, for atleast one similar work to an extent of 50 percent of the cost of the work for all the works value not less than Rs. 119.90 Lakhs (Updated to 2025-26 Price Level)
ITT Clause 3.2 (c) Executed in any one year i.e., 2021-22 , 2022-23, 2023-24, 2024-25, 2025-26 the following Minimum quantities of work 1. Earth work/Subgrade/Embankment-18383.00 Cum, 2. GSB-652.00 Cum, 3.WMM-489.00 Cum, 5. Cement Concrete Work-1532.00 Cum, 5. Steel-21.60 Tonne (usually 80 percent of peak annual rate of construction)
ITT Clause 3.6 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under : Assessed available tender capacity:(AxNx1.5 -B ) should be greater than or equal to Rs.239.80 lakhs where A-Maximum value of works executed in any one year during the last five years taking into account the completed as well as works in progress. (updated to 2026-27 price level) N-Number of years prescribed for completion of the works for which tenders are invited-6 Months. B-Value, at 2026-27 price level, of existing commitments and on-going works to be completed during the next 6 Months. (Period of completion of the works for which tenders are invited)
ITT Clause 3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period i.e., 2021-22, 2022-23, 2023-24, 2024-25, 2025-26 (a) Achieved in atleast two financial years a minimum financial turnover of Rs. 479.50 Lakhs (in all classes of civil engineering construction works only) (Updated to 2025-26 Price Level) (Usually not less than two times the estimated annual payments under this contract)
ITT Clause 3.3 Each Tenderer should further demonstrate (b) Liquid assets and /or availability of credit facilities of not less than Rs. 119.90 Lakhs (credit lines / letter of credit/ certificates from Nationalized banks) for meeting the fund requirement etc (usually the equivalent of the estimated cash flow for three months in the peak construction period) (The fomat should be as per KW-4 Bid document Section-3 Para 1.10)
Contractors has to upload the EPF Registration
KPWD Class-II and above Registration Certificate
₹5,000
₹3.6 L
10 Apr 2026
10 Apr 2026
21 Apr 2026
17 Apr 2026
15 Apr 2026
PART-A One time improvement of road connecting NH373 to mosalehosahalli govt engineering college.
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2504 ---- With all lead and lift including c...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
PART-B Improvement of Roads in Bettadasathenahalli village limits along CNK Road in Holenarasipura Taluk.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3 ---- With all lead and lift including cost and conveyanc...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
PART-C Improvements of Road in Chakenahalli Village limits along Huliyar Keralapura Road to Chakenahalli Cross.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3 ---- With all lead and lift including cost and conveyanc...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TN-02.pdf
Others - Notification Copy • 1.30 MB
KW 4-35464.docx
Tender Document • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .