Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹8.7 L+₹1,350 (0.16%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹9.2 L+₹54,000 (6.21%)Accepted-Finance | L3 | Accepted-Finance L3 |
Tender Value
₹10.2 L
EMD Value
₹20,496
Closing Date
18 Jan 2021, 4:00 pmClosed
DFO Bhadarwah
DFO Office Bhadarwah
BOQ
2021_FD_113554_1
38 of 2020-21 dated 12-01-2021 (Re-tender)
Open Tender
Agricultural or Forestry
Item Wise
30 days
Kanthi Co. 106/Bh
SBD
2 documents required · 2 mandatory
₹500
DFO Bhadarwah
₹20,496
22 Jan 2021
12 Jan 2021
19 Jan 2021
12 Jan 2021
18 Jan 2021
12 Jan 2021
Amount
Fencing using Wooden fence posts at spacing of 8' & 4 strands of black annealed Barbed wire The Fencing work includes cost of material, Carriage of fencing material both mechanical and head load , loading & unloading, clearance of site, digging of pits of size 1'x1'x1'6",, fixing of poles in dugout pits as per specification, stretching of B.A Barbed wire in four strands, Painting of fence posts with enamel paint as per approved design and its numbering, fixing of gate and sign board including painting and writing as per specification and design approved by the Divisional Forest Officer,Bhadarwah, etc . Note: The Department through Bhadarwah Forest Division shall provide the Wooden Fence Posts of required sizes at site of establishment of closure. The Black Annealed Barbed wire with standard specification conforming to product code BA-BW, allied materials like “U” nails etc. and its mechanical carriage including loading, unloading and stacking charges will be managed/procured himself by the contractor. A proper testing certificate with regard to the material i.e Barbed Wire etc. has to be produced by the contractor before the execution of work. The extraction and carriage charges of Wooden Fence Posts shall be deducted by the department from the bill of the contractor at the time of payment after satisfactory execution of work. A proper Measurement Book has to be prepared of the work against which work done payment is to be made to the contractor.
Akhter Hussain Mir
Mohd Yaseen Malik
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .