| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.0 Laccepted-aoc | ₹6.0 L | accepted-aoc |
Tender Value
₹7.2 L
EMD Value
₹18,000
Closing Date
11 Mar 2026, 4:00 pmClosed
Executive Officer
SASD Kondagattu
Balance work of Shed at Vehicle Parking of Kondagattu up hills
684087
C/29/2026
OPEN
Civil Works
JAGITIAL
6 documents required · 6 mandatory
₹254
₹18,000
26 Mar 2026
4 Mar 2026
4 Mar 2026
Supply and filling of sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost of sand, all operational, incidental, labour charges, complete for finished item of work, including cost and conveyance of all materials and labour charges, and contractors profit & over heads, but excluding seigniorage charges & taxes like GST etc. , complete. (APSS NO. 309 & 310)
Plain Cement concrete (M 20) Nominal Mix using 20mm graded metal using concrete mixer - using 20mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., including all operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & taxes like GST etc. (APSS 402)
Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms as per Table - I of IS:1077-1992 Non-Modular or traditional size 23x11x7cm, having compressive strength not less than 35kg/cm2, including cost & conveyance of all materials and labour charges, centering & scafolding charges, constructing masnory, lift charges, curing, overhead charges & Contractors profit etc., complete. But excluding seignorage chages and taxes like GST. (APSS No.501 & 504) for Super structure.
Plastering to brick masonry wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) for uneven surface / outer Walls.
Plastering to brick masonry wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) (CSSR) for Even Surface/ Internal Walls.
Painting to new walls with 2 coats of plastic emulsion/ Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 (making three coats) on New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., but excluding taxes like GST etc, complete for finished item of work as per SS 911 for internal walls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Balance work to Shed BID.doc
TENDER_DOCUMENT • 0.58 MB
Balance work to Shed boq.xls
TENDER_DOCUMENT • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .