| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC MANGLI BAZAR PARASIA PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Bidder is L1 and has quoted lowest item rates overall | |
| 2 | L2₹50.0 L+₹4.9 L (10.9%)Rejected-Finance | L2 | Rejected-Finance Bidder is Quoted Higher Rate | |
| 3 | L3₹54.9 L+₹9.7 L (21.6%)Rejected-Finance | L3 | Rejected-Finance Bidder is Quoted Higher Rate |
Tender Value
₹55.0 L
EMD Value
₹68,800
Closing Date
30 Mar 2024, 5:30 pmClosed
Staff Officer (Civil), Pench Area
Staff Officer (Civil), AGM Office, Pench Area, P.O. Parasia, Dist. Chhindwara (M.P.) 480441
Surveying, Planning, Designing / Drawing, Construction, Testing and commissioning of 1 No. 2,00,000 litre Capacity R.C.C. ESR / overhead tank, 20.00 metre staging height at Jhurrey Colony (PV Colony) under Nehariya Sub Area of Pench Area on TURN-KEY
2024_WCL_305235_1
pe3350-civ-s-e056-2023-24
Turnkey
Civil Works - Others
Item Rate
270 days
NEHARIYA SUB AREA
As Per NIT
6 documents required · 6 mandatory
₹68,800
AGM Office, Pench Area, Parasia
16 Oct 2024
15 Mar 2024
1 Apr 2024
15 Mar 2024
30 Mar 2024
15 Mar 2024
15 Mar 2024 - 22 Mar 2024
19 Mar 2024
Amount
(Bidders are requested to read Item Description from formula bar as excel might not display whole specifications) Designing (aesthetically), and constructing RCC elevated service reservoirs of 2.0L Liter capacity with RCC 20.0M staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for ESR having Capacity upto 500 Cum. and not more than 6 m c/c for ESRs having capacity above 500 cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of the container including refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design, providing and fixing accessories such as M.S. ladder out side, stainless steel Ladder in container, C. I. manhole frame and covers water level indicatiors, lightening conductor, G. I. pipe railing around walk way and top slab, providing spiral staire case from ground level to roof level,M.S.grill gate of 2 mtr.height with locking arrangement of approved design. B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of Acrylie emulsion with silicon additives paint to the structure including roof slab epoxy painting to internal surface & anti termite treatment for underground parts of the structure. and giving satisfactory water tightness test as per I.S. code, The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge. ON TURN KEY BASIS. 1.The design of the structure be in accordance with relevent (I.S.3370 - 2009 or revised) 2 The design shall satisfy the stipulation as per IS 1893-1984 and I.S. 13920/1993 for seismic focrce and I.S.- 11682/1985 for R.C.C. staging of overhead tanks. 3 For design having more than 6 columns, Providing of internal bracing is obligatory,. External bracking is also obligatory. 4 The entire structure shall be in M-30 mix only. 5 Plain round mild steel bars grade - I confirming to I.S:432 Part-I or high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6 Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the gound level. 7 These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs liters capacity and providing RCC sprial staircase for E.S.R. above 2 lakhs liters capacity. 8 Staging shall have to be designed with stresses of M-25 for ESR. However RCC construction shall be done in M-30. 9 These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is struck at shallow depth extra provision of dewatering shall be made as per site condition. 10 All condition given in the Member Secretary"s Circular No.MJP/TS I/350/1668 dt. 2.8.97 and MJP/S I/350/2127 dt. 13.7.99 shall be strictly followed and additional cost, if any due to these conditions is included in the rates mentioned below. 11 75% part rate shall be payable for reinforced cocnrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given ; and till that work shall be treated as incomplete. 12 The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet washout overflow and by-pass arrangement. The scope of work, however inclueds cost of erecting, laying and jointing of pipes and valvews including cost of jointing materials upto 5M beyond outer face of outermost column. 13 For ESR upto 500cum capacity D.I. double flanged pipes upto 300mm dia shall be provided and C.I.Specials shall be used.For ESR above 500 cum capacity D.I./M.S. pipes assembly with minimum 8mm thick ness up to 500mm dia. And minimum 10mm thickness above 500mm dia can be used with proper anti?corrosive epoxy teratment from inside and outside. 14 Below mentioned rates are for foundation, with individuals footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% wheresafebearing capacity ( SBC) is 5 M.T. per Sq.m and by 5% where SBC is more than 5 MT/Sqm. and upto 10MT/Sq.m. This percentage of 5% or 7,5% is applicable for estimation of amount of L.S. items ESR for Extra item due to change from individual footing foundation to raft actual increase in concrete and steel quantities be paid as per relevent DSR Item. 15 The rates shall be increase by 30% for brearing piles upto depth of 10m and for further increased in depth by 5M each it shall be increased by another 10% These rates are applicable where raft is not reasible for pile foundation sulfate resistant cement shall only be used. Single pile for the column is not permitted Group of piles shall be designed with pile cap for each column of ESR. 16 These rates are applicable for staging height of 12 M These rates shall be increased or decreased for per metre variation in the staging height as belo The rates are applicable for staging height of 12 m. These rates shall be increased or decreased for per metre variation in this staging height as below. 12 to 16 m staging - 2% per metre. 16 to 20 m staging - 3% per metre 20 m and above - 4% per metre i.e. for 17 m staging height Percentage calculation will be like below. 12 to 16 m = 4 x 2 = 8% 16 & 17 --- 1x 3% = 3% Total = 11% For 21 M Staging height , percentage calculation will be like below Total = 15% For 21 m staging hegiht Percentage calculation will be like below. 12 to 16 m = 4 x 2 = 8% 16 to 20 m = 4 x 3 = 12% 20 to 21 m = 1 x 4 = 4% Total = 24% Following rates are for seismic zone-III for Zone-IV these rates shall be increased by 5% and for Zone-II, these rates shall be decreased by 5% concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones( Seismic maps attached in this C.S.R.)
Providing and supplying ISI standard CI double flanged pipes excluding GST levied by GOI & GOM in all respect including railway freight, insurance, unloading from railway wagon, loading into truck transport to stores, unloading etc. complete as directed by Engineer-in-charge. 150mm
Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. 150mm
Providing and supplying ISI standard CI flanged / S& S specials including railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc but excluding GST levied by GOI & GOM in all respect, etc complete. D/F Specials 80 to 300 mm dia.
Providing and making flanged joints to flanged C.I./M.S. pipes of all classes/specials etc. including cost of all jointing materials (rubber packing, nut bolts, etc.), labour, hydraulic testing etc. complete. 150mm
Total impact of GST for the purpose of CTC
M/s Kalbande Constructions
SURYA BOREWELL
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .