Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-contractor not interested withdrawal submitted |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-contractor not interested withdrawal submitted |
Tender Value
₹41.5 L
EMD Value
₹4.2 L
Closing Date
20 Apr 2026, 12:00 pmClosed
Executive Officer
NP ANTU
Ward dasrath nagar saraiya in kaushiya sadan to babuganj chauraha tak
2026_DOLBU_1131640_2
cmnsy 2026 Anupurak
Open Tender
Civil Works
Percentage
NP Antu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Officer
₹4.2 L
19 May 2026
31 Mar 2026
20 Apr 2026
31 Mar 2026
20 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation for structure as per drawing and technical specification clause.305.1 including setting out construction of shoring and bracing, removal of stumps and others deleterios materials and disposal upto aleads of 50m. Dressing for sides and bottom and backfilling in trenches with excavated suitable material Sl.NO 251 | - | m3 | - | - |
| 1.02 | Concrete with 4cm gauge brick ballast fine local sand of 1.25 f.M and cement in proportion of 1:6:12 in foundation and under floors including supply of material,labour,tools& plants etc.required for proper completion of the work. Sl.NO 273 | - | m3 | - | - |
| 1.03 | First class -150 brick work in 1:4 cement and fine sand of 1.25 F.M modulous morter in foundation and plinth incliding supply of all materials, labour & tools & Plants etc. requied for proper completion of the work Sl.NO 305 | 1 | m3 | - | - |
| 1.04 | Earthwork in cutting in embankment in ordinary soil,excavation to be in the form of regular pits not exceeding 1/2meter in depth and earth work in embankment to be in 20cm. Layers including ramming and slopes and also including 1.5 metre lift and 30m.lead the earth from cutting to be disposited as spoil banks with in 30m.distance as directed by the engineer in charge. with lifts & leads transporting to site upto 5 km.Sl NO 305. | - | m3 | - | - |
| 1.05 | Construction of granular sub base by providing coorse aggrigate material,spreading in unform layers with mortar grader on prepared surface, mixing by mix in place mathod . | - | m3 | - | - |
| 1.06 | Zig-Zag interlocking providing and laying of rubber moulded reflective zig zag 80mm thick tiles of percoat compressed strenth ISI marked concrete thickness 80mm as per technical specification clause. | - | m2 | - | - |
| 1.07 | P.C.C in (1:2:4) cement c. sand & 20mm stone grite i/c all comp. Sl no 279(A) | - | m3 | - | - |
| 1.08 | Pro & laying two coat cement paint | - | no | - | - |
| 1.1 | Pro. & laying G.S.B | - | no | - | - |
| 1.11 | Pro & laying80 m.m thick interlocking tiles | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice.pdf
Tender Documents • 1.24 MB
BOQ_2111978.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .