| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | L1 | Accepted-Finance Financially accepted | |
| 2 | L2₹7.7 L+₹83,191.18 (12.2%)Accepted-Finance | L2 | Accepted-Finance Financially Rejected |
| Sl No | Description | Qty | Unit | ALTIUS PROJECTS L1 | SAMPATH L2 |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding using 48.30 mm diameter heavy duty M.S. Pipe over all height 3.00 m the distance between two legs being 1.25 m and the spacing of the post being 2.00 m in each rows and providing platform with country wood plants using 40 mm thick silver oak and 1.00 m wide in complete from with horizontal bracing @ 1.50 m c/c vertical direction and with cross bracing using same 48.30 mm diameter including cutting, threading assembly with one coat red oxide primer. Labour charges, cost of special such on large plate, shoe, catcher, coupling, bolt and nut, transport charges and handling charges. The bottom of vertical post shall rest on 300 x 300 x 70mm, 1:2:4 concrete base as per the standard specification. The cross bracing to be assembled as per sketch enclosed. | 540 | M2 | 275 ₹1,75,230 Lowest | 520 ₹3,31,344 |
| 2.00 | Removing the damaged G.I.Roof sheet of size 0.90mx3.00m \in the existing godown roof top portion with nessary renewal of new G.I.Roof sheet, supporting with the existing M.S.frame, self drilling screws, apply of sealant and arresting the roof leakage, in the new roof sheet and existing roof sheet , alternation place roof with original condition using self drilling machine with necessary self screws with washers and applying with water proof sealent in the damaged holes portion of roof sheet top portion with necessary welding with purline portion and also checked with leakage and sheet slop portion etc., complete. The rate is including of cost of sheet, scaffolding charges , labour charges and transporting charges completed as directed by the departmental officer. | 50 | M2 | 2,540 ₹1,49,860 | 1,000 ₹59,000 Lowest |
| 3.00 | Labour charges for removing the existing roof sheet/ Gutter sheet and roof purlin, Vertical frame and refix the same same shed frame with different area with necesssary alternation and refix the same preprinted hot dipped sheet in the alternation place roof with original condition using self drilling machine with necessary self screws with washers and applying with water proof sealent in the damaged holes portion of roof sheet top portion with necessary welding with purline portion and also checked with leakage and sheet slop portion etc., complete. The rate is excluding cost of sheet, includomg , labour charges and transporting charges completed as directed by the departmental officer. | 231 | M2 | 470 ₹1,28,112.6 | 360 ₹98,128.8 Lowest |
| 4.00 | Dismantling the damaged Pressed Tiles & Weathering Course and clearing away with carefully stacking the material useful for reuse for any thickness etc., complete complying with standard specification and as directed by the Departmental officers. | 49 | M2 | 46 ₹2,659.72 Lowest | 105 ₹6,071.1 |
| 5.00 | Clean the expansion joints surface thoroughly with water and remove any loose plaster, flacks fungus growth etc, by suitable mechanical means like scrapping or wire brushing and wash with adequate water to get an absolutely cleaned surface to take on further treatment. Gal – Tech multi proof acrylic polymer with cement and fine sand mix ratio 1:2:4 to full the grooves and surface crakes. Fill thermocole up to 1 inch depth over that fill up with Polyurethane. Sealant 900% elongation, made in Australia. This product can be used to all the joints up to 25mm width and depth. | 49 | M2 | 1,790 ₹1,03,497.8 | 1,200 ₹69,384 Lowest |
| 6.00 | Providing Granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two M-sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever specification and as directed by the deparmental officers. | 6 | M3 | 5,940 ₹42,055.2 Lowest | 19,500 ₹1,38,060 |
| 7.00 | Collecting the scattered debris from the campus and conveying away the same to outside by lorry to a lead of 3KM including loading and unloading charges and dumping in low places and leveling etc., complete. | 10 | M3 | 100 ₹1,180 Lowest | 1,030 ₹12,154 |
| 8.00 | Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification and as directed by the departmental officers. | 89 | RM | 770 ₹80,865.4 | 500 ₹52,510 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
20 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager (Services)
417, Pantheon Road, Egmore, Chennai - 600 008
Special Repairs for Rectification of Roof Leakage in GI Sheet Roofing, Rainwater Gutter Leakage and Leakage at RCC Expansion Joints in Depots 1,2,3 of TASMAC Warehouse, Thirumazhisai, Chennai.
2026_TNMSC_725498_1
003/TASMAC/ENGG/CIVIL/2026-THZ
Open Tender
Civil Works
Lump-sum
Thirumazhisai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,000
24 Nov 2026
12 Nov 2026
20 Nov 2026
12 Nov 2026
20 Nov 2026
12 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing two legged scaffolding using 48.30 mm diameter heavy duty M.S. Pipe over all height 3.00 m the distance between two legs being 1.25 m and the spacing of the post being 2.00 m in each rows and providing platform with country wood plants using 40 mm thick silver oak and 1.00 m wide in complete from with horizontal bracing @ 1.50 m c/c vertical direction and with cross bracing using same 48.30 mm diameter including cutting, threading assembly with one coat red oxide primer. Labour charges, cost of special such on large plate, shoe, catcher, coupling, bolt and nut, transport charges and handling charges. The bottom of vertical post shall rest on 300 x 300 x 70mm, 1:2:4 concrete base as per the standard specification. The cross bracing to be assembled as per sketch enclosed. | 540 | M2 | - | - |
| 2 | Removing the damaged G.I.Roof sheet of size 0.90mx3.00m \in the existing godown roof top portion with nessary renewal of new G.I.Roof sheet, supporting with the existing M.S.frame, self drilling screws, apply of sealant and arresting the roof leakage, in the new roof sheet and existing roof sheet , alternation place roof with original condition using self drilling machine with necessary self screws with washers and applying with water proof sealent in the damaged holes portion of roof sheet top portion with necessary welding with purline portion and also checked with leakage and sheet slop portion etc., complete. The rate is including of cost of sheet, scaffolding charges , labour charges and transporting charges completed as directed by the departmental officer. | 50 | M2 | - | - |
| 3 | Labour charges for removing the existing roof sheet/ Gutter sheet and roof purlin, Vertical frame and refix the same same shed frame with different area with necesssary alternation and refix the same preprinted hot dipped sheet in the alternation place roof with original condition using self drilling machine with necessary self screws with washers and applying with water proof sealent in the damaged holes portion of roof sheet top portion with necessary welding with purline portion and also checked with leakage and sheet slop portion etc., complete. The rate is excluding cost of sheet, includomg , labour charges and transporting charges completed as directed by the departmental officer. | 231 | M2 | - | - |
| 4 | Dismantling the damaged Pressed Tiles & Weathering Course and clearing away with carefully stacking the material useful for reuse for any thickness etc., complete complying with standard specification and as directed by the Departmental officers. | 49 | M2 | - | - |
| 5 | Clean the expansion joints surface thoroughly with water and remove any loose plaster, flacks fungus growth etc, by suitable mechanical means like scrapping or wire brushing and wash with adequate water to get an absolutely cleaned surface to take on further treatment. Gal – Tech multi proof acrylic polymer with cement and fine sand mix ratio 1:2:4 to full the grooves and surface crakes. Fill thermocole up to 1 inch depth over that fill up with Polyurethane. Sealant 900% elongation, made in Australia. This product can be used to all the joints up to 25mm width and depth. | 49 | M2 | - | - |
| 6 | Providing Granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two M-sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever specification and as directed by the deparmental officers. | 6 | M3 | - | - |
| 7 | Collecting the scattered debris from the campus and conveying away the same to outside by lorry to a lead of 3KM including loading and unloading charges and dumping in low places and leveling etc., complete. | 10 | M3 | 30 | ₹300 |
| 8 | Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification and as directed by the departmental officers. | 89 | RM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Tasmacdocumentchennai3.pdf
Tender Documents • 0.40 MB
BOQ_870910.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .