| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Finance 787 ISMAILABAD 136129 | KURUKSHETRA | HARYANA | 136129 | -8.40% | ₹78.0 L | L1 | Admitted-Finance |
| 2 | L2₹80.2 L+₹2.3 L (2.89%)Admitted-Finance | -5.75% | ₹80.2 L+₹2.3 L (2.89%) | L2 | Admitted-Finance |
| 3 | L3₹88.9 L+₹11.0 L (14.1%)Admitted-Finance AMRITSAR | AMRITSAR | PUNJAB | 143001 | +4.50% | ₹88.9 L+₹11.0 L (14.1%) | L3 | Admitted-Finance |
Tender Value
₹85.1 L
EMD Value
₹85,000
Closing Date
1 Jun 2026, 5:00 pmClosed
Vivek Kumar Behl
Executive Engineer, Ambala
Providing public amenities, boundary wall, total station survey and signage of Archeology department
2026_HBC_522259_1
2026CB5495CC 356C 4942 BFAC 217126FE239857HHC
Open Tender
Civil Works
Works
365 days
Pehowa
2 documents required · 2 mandatory
₹5,900
₹85,000
Yes
23 Jun 2026
20 May 2026
2 Jun 2026
20 May 2026
1 Jun 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.
Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
HSR Rate(Rs.) 66.00 Through Rate | 1 | Kg. | 66 | ₹65.93 |
| 2 | HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers
HSR Rate(Rs.) 296.00 Through Rate | - | Sqm | 296 | - |
| 3 | HSR Item 4.14.1-Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.
HSR Rate(Rs.) 83.00 Through Rate | 0.8 | cum | 83 | ₹66.32 |
| 4 | HSR Item 2.B0154- B0154. Common burnt clay F.P.S. (non modular) bricks class designation 7.5
HSR Rate(Rs.) 4108.00 Rate | 1 | 1000 Nos. | 4,108 | ₹4,103.89 |
| 5 | HSR Item 2.B0146- B0146. Brick bats
HSR Rate(Rs.) 357.00 Rate | 1 | cum | 357 | ₹356.64 |
| 6 | HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
HSR Rate(Rs.) 4374.00 Through Rate | - | cum | 4,374 | - |
| 7 | HSR Item 6.30.1-Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
HSR Rate(Rs.) 156.00 Through Rate | 0.2 | Sqm | 156 | ₹31.04 |
| 8 | HSR Item 11.6.1-15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) HSR Rate(Rs.) 138.00 Through Rate | 0.2 | Sqm | 138 | ₹27.46 |
| 9 | HSR Item 7.21.1-Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4128.00 Through Rate | 1 | cum | 4,128 | ₹4,123.87 |
| 10 | HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
HSR Rate(Rs.) 2442.00 Through Rate | 1 | cum | 2,442 | ₹2,439.56 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_601176.xls
BOQ • 0.74 MB
777951Z160123.pdf
Additional Documents • 21.62 MB
OT0160123.pdf
Other Document • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .