Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance FOUND OK |
| 2 | L2₹1.1 Cr+₹9.0 L (8.59%)Accepted-Finance | ₹1.1 Cr+₹9.0 L (8.59%) | L2 | Accepted-Finance FOUND OK |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT OK |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
27 Sept 2023, 12:00 pmClosed
SE EDC MAINPURI
POWER HOUSE CAMPUS MAINPURI
Electricity System Strengthening work Line Construction Capacity Increase of Transformer Jarjar Line Replacement and other Electricity work on Semi Turnkey Basis in Additional Business Plan Head under Electricity Distribution Division II Mainpuri
2023_DVVNL_839917_1
EDC(M)-26/2023-23
Open Tender
Electrical Works
Lump-sum
180 days
DISTRICT MAINPURI
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹5,900
DVVNL
₹1.2 L
Yes
19 Oct 2023
18 Sept 2023
27 Sept 2023
18 Sept 2023
27 Sept 2023
18 Sept 2023
Amount
Carriage of following material from Centre Stores, Power House Colony Mainpuri to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends in the area of EDD-II, Mainpuri, including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)
LT AB Cable (3x95+1x70+1x16) Sq.mm.
LT AB Cable (3x120+1x95) Sq.mm.
11 KV DO Fuse Set
PCC Pole 8.5 Mtr. Long
11 KV TPMO with Polymer Insulator Set
11 KV Disc Insulator with Disc Fitting
11 KV Pin Insulator
11 KV CTR 600-300/5A
11 KV CTR 400-200/5A
Different type Vaccume Interrupter
Supply of the Following Material with Freight etc. charges.
24 Volt Battery
24 Volt Battery Charger
Top Channel (100x50x2240)mm.
T.Channel As per Norms
MS Base Angle 75x75x6x2028 mm
Clamp with nut & bolt
Dropper Channel As per Norms.
Suspension Clamp with Nut and Bolts
Dead End Clamp with Nut and Bolts
EYE Bolts with Nut and Bolts
Pearcing Connector
MS Earthing Rod
Stay Set Complete
LT Protection System
G.I. Barbed wire 10 SWG
Installation of the 100 KVA new transformers at various 11/0.4 KV substation, under the jurisdiction of Electricity Distribution Division-II Mainpuri, in proper alignment and direction and making proper HT/LT connection as per instruction of Supervising Engineer after carriage the same from Centre Stores, Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, T&P, carrier etc required for proper completion of work.
Installation of the 25 KVA new transformers at various 11/0.4 KV substation, under the jurisdiction of Electricity Distribution Division-II Mainpuri, in proper alignment and direction and making proper HT/LT connection as per instruction of Supervising Engineer after carriage the same from Centre Stores, Mainpuri including the work of safe loading and unloading at the respective ends and also including the cost of arrangement of laborer, T&P, carrier etc required for proper completion of work.
Increasing Capacity of Distribution Transformers at various 11/0.4 KV Substation Under Electricity Distribution Division - II Mainpuri
Safe Carriage and Installation of Distribution Transfomer 63 KVA from ESC Mainpuri to pit Site.
Safe Carriage and Installation of Distribution Transfomer 100 KVA from ESC Mainpuri to pit Site.
After Increasing of Distribution Transfomer Safe carriage of Existing transformer in vehicle at different places after opening of HT/LT connection and its safe carriage upto workshop Mainpuri and safe unloading at workshop Mainpuri.
To attend the underground 33 and 11 KV XLPE cable faults. The works are appended below A- To locate the fault with the help of departmental fault locator machine. B- To dig the pit atleast 6x2 sqft. (or as much required) to expose the damage cable for repair. C- Cut the cable from damage position. D- Fixing of suitable size jointing kit to join the ends (cable Straight Through will be provided by department) E- Re-filling of pit.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x120 sqmm.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x185 sqmm.
S/T SUITABLE FOR 11 KV XLPE cable of size 3x300 sqmm.
S/T SUITABLE FOR 33 KV XLPE cable of size 3x300 sqmm.
To attend breakdown in 33/11 KV XLPE cable termination ends. The works are appended below. A- To cut the minimum length of damage cable ends. B- Fixing of proper size cable termination kit (Cable termination kit will be provided by department.)
I/D & O/D SUITABLE FOR 11 KV XLPE cable of size 3x120 sqmm.
I/D & O/D SUITABLE FOR 11 KV XLPE cable of size 3x185 sqmm.
I/D & O/D SUITABLE FOR 11 KV XLPE cable of size 3x300 sqmm.
I/D & O/D SUITABLE FOR 33 KV XLPE cable of size 3x300 sqmm.
Erection of 8.5 meter PCC Double Pole Structure including duly grouted in cement, sand and brick ballast in ratio 1:2:4, including work of fitting of all accessories, stone pad and clamps suitable for Transfomer. Work will be carried out as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
BOAR Type Earthing upto water Level of Distribution T/F and power Transformer by GI stipp patti as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Installation of 24 volt Battery and Charger with Proper Connection As required.
Installation of Different type Vaccume Interrupter as per Norms
Laying of LT AB Cable (3x95+1x70+1x16) Sq.mm. at various place under EDD-II, Mainpuri with all accessories as per Norms.
Laying of LT AB Cable (3x120+1x95) Sq.mm. at various place under EDD-II, Mainpuri with all accessories as per Norms.
Fixing of 11 KV DO Fuse Set at various place under EDD-II, Mainpuri with all accessories as per Norms.
Installation of LT Protection System at various place under EDD-II, Mainpuri with all accessories as per Norms.
Installation of 11 KV CTR 600-300/5A
Installation of 11 KV CTR 400-200/5A
Installation of 11 KV PT
Reparing of 11 KV VCB at various place under EDD-II, Mainpuri with all accessories as per Norms.
Supply and Installation of 11 KV Relay As per Requirement.
Plinth of Transformer as per RESPO Norms
Fencing of Distribution Transformer as per Norms.
Installation of new 10 MVA power transformer installed at Various 33/11 KV Substation under EDD-II Mainpuri with proper alignment and direction, and making all HT/LT connections properly, as per direction of supervising engineer as per respo norms.
shiva engineering AND suppliers
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .