Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC DALURBANDH COLLI PANDESWAR PANDESWAR BARDHAMAN WEST BENGAL INDIA 713346 | PANDESWAR | BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹14.9 L+₹58,937.32 (4.12%)Rejected-Finance BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹15.0 L+₹69,819.23 (4.89%)Rejected-Finance DVC MORE PANDAVESWAR BARDHAMAN WEST BENGAL 713346 | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹14.3 L
EMD Value
₹17,900
Closing Date
26 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 1000 mm wide X 200mtr long belt conveyor from 2L and minus 4D to 8D and minus 4D in RVI seam for SHCM Pakage of CM Project at Nakrakonda kumardihi B Colliery under Bankola Area (retender).
2023_ECL_291385_1
ECL/GM/BA/E TENDER/23-24/EnM/114 Dt. 16.10.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹17,900
8 Dec 2023
16 Oct 2023
27 Oct 2023
16 Oct 2023
26 Oct 2023
16 Oct 2023
16 Oct 2023 - 20 Oct 2023
Amount
Item Description/ Heading
Transportation & installation of tail end unit -1MT +Fix unit 1MT+1000 mm wide conveyor structure with top , bottom roller & foot stool -240 mtr =16.32MT +1times tail end shifting -1MT =Toal weight =19.32MT
Fitting of tail end mid belt and discharge scraper
Belt laying including transportating of belt jointing tensioning trail run etc .
Foundation bolting for fitting of drive unit , discharge unit loop take up & tail end etc =20nos
Cleaning of coal & unused materias above before installation jobs
Making fabrication of load table
Dismantling of tail end unit -1MT + Fix unit 1MT +1000 mm wide Conveyor structure with top , bottom roller & foot stool 240 mtr =16.32MT +1times Tail end shifting 1MT =total weight =19.32MT
Taken out and coiling of belt
Cost of MS nut bolts & washer
Cost of belt fastenr / Joint E 35 comb and grip type suitable for moto make machine avilable in mines.
Total impact of GST for the purpose of CTC
BABLU SINHA
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .