| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC 1st Lowest amount |
| 2 | L2₹10.1 LRejected-AOC | ₹10.1 L | L2 | Rejected-AOC 2nt Lowest amount |
| Sl No | Description | Qty | Unit | ARUMUGAM . K L2 | P M THULASIMANI L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Provision for CC Road and Retaining wall at 0/800 from Ayeepalayam to Karattupalayam road H/o Karattupalayam | |||||
| 2.00 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 59.04 | Sqm | 23.7 ₹1,399.25 | 23.2 ₹1,369.73 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 58.67 | Cum | 2,368.8 ₹1.4 L | 2,368.2 ₹1.4 L |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 39.89 | Cum | 6,773 ₹2.7 L | 6,772.5 ₹2.7 L |
| 5.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 66.3 | Cum | 264 ₹17,503.20 | 263.5 ₹17,470.05 |
| 6.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications. | 4.97 | Cum | 5,468 ₹27,175.96 | 5,467.5 ₹27,173.48 |
| 7.00Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for column, column footing, plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc complete | |||||
| 8.00 | BGL | 79.56 | Sqm | 545 ₹43,360.20 | 547.3 ₹43,543.19 |
| 9.00 | AGL | 37.55 | Sqm | 1,096 ₹41,154.80 | 1,094.5 ₹41,098.48 |
| 10.00Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | |||||
Tender Value
₹10.3 L
EMD Value
₹20,540
Closing Date
4 Dec 2025, 3:00 pmClosed
S.Senthilkumar BDO(BP), Nambiyur
Block Development Office(B.P), Nambiyur
Provision for CC Road and Retaining wall at 0/800 from Ayeepalayam to Karattupalayam road H/o Karattupalayam - General Fund(BP) - 2025-2026
2025_RDTN_626188_1
Roc No.2070/2025/A2 Dated.24.11.2025
Open Tender
Civil Works - Others
90 days
Block Development Office, Nambiyur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,540
Yes
21 Dec 2025
25 Nov 2025
4 Dec 2025
25 Nov 2025
4 Dec 2025
25 Nov 2025
Amount
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for column, column footing, plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc complete
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
ARUMUGAM . K (BID ID -1526569)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748790.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
techbid.pdf
Tender Documents • 0.56 MB
BOQ_748790.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid