| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹14.0 L+₹56,016 (4.18%)Rejected-Finance SECTOR 10 PANCHKULA | PANCHKULA | PANCHKULA | HARYANA | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹14.1 L+₹68,796 (5.13%)Rejected-Finance 17 KARAMCHARY COLONY UIT ROAD SRI GANGANAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹15.9 L+₹2.5 L (18.3%)Rejected-Finance | L4 | Rejected-Finance Being L4 |
| Sl No | Description | Qty | Unit | M/s Friends Engineering Works L2 | SANJEEV ENTERPRISES L1 | Bharat Enterprises L4 | JK ENGINEERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft / loose soil n.exc 1.5 mtr wide n.exc 1.5 mtr deep getting out soil complete all as specified and directed. | 143 | Cum | 130 ₹18,590 | 240 ₹34,320 | 110 ₹15,730 Lowest | 150 ₹21,450 |
| 2.00 | Returning filling in including spreading levelling well ramming in layers n.exc 25 cm thick in a layers complete all as specified and directed. | 125 | Cum | 30 ₹3,750 | 25 ₹3,125 | 20 ₹2,500 Lowest | 150 ₹18,750 |
| 3.00 | Removing excavated material (soil) n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified and directed. | 18 | Cum | 30 ₹540 | 25 ₹450 | 20 ₹360 Lowest | 150 ₹2,700 |
| 4.00 | Horizontal boring under the road below 2 mtr from the road surface and dia of hole not exc 200mm, with out damaging the existing road, getting out and disposal of soil to a distance not exceeding 50m from the site of work complete all as specified and directed. | 5 | RM | 650 ₹3,250 | 550 ₹2,750 | 500 ₹2,500 Lowest | 500 ₹2,500 Lowest |
| 5.00 | Material and labour for road cutting laying of pipe not exceeding 90 cm below ground level not exceeding 1 meter complete all as specified and directed. | 9 | RM | 700 ₹6,300 | 450 ₹4,050 | 400 ₹3,600 Lowest | 2,000 ₹18,000 |
| 6.00 | Material and labour for cement concrete type C2 1:3:6 (40 mm graded aggregate) for making good to disturbed surface of road etc. complete all as specified and directed. | 1 | Cum | 3,500 ₹3,500 | 2,200 ₹2,200 Lowest | 4,000 ₹4,000 | 4,000 ₹4,000 |
| 7.00 | Cutting and taking up or down GI/Steel tubing and connections, including cleaning for refixing or removal to store of following size bore of pipe 25 mm complete all as specified and directed. | 80 | RM | 30 ₹2,400 | 35 ₹2,800 | 25 ₹2,000 Lowest | 50 ₹4,000 |
| 8.00 | All as per sserial item No. 7 here in before but bore of pipe 50 mm. | 110 | RM | 30 ₹3,300 Lowest | 50 ₹5,500 | 40 ₹4,400 | 75 ₹8,250 |
| 9.00 | All as per serial item No. 7 here in before but bore of pipe 80 mm. | 80 | RM | 30 ₹2,400 Lowest | 80 ₹6,400 | 50 ₹4,000 | 80 ₹6,400 |
| 10.00 | All as per serial item No. 7 here in before but bore of pipe 100 mm. | 100 | RM | 50 ₹5,000 Lowest | 100 ₹10,000 | 70 ₹7,000 | 80 ₹8,000 |
Tender Value
₹14.6 L
EMD Value
₹29,280
Closing Date
20 May 2026, 6:00 pmClosed
GE I R AND D Chandigarh
Garrison Engineer I R and D, DIHAR Base Lab, Ground Floor, Near 3 (BRD) AF Stn, Industrial Area, Ph-II, Ramdarbar, Chandigarh
SUPPLEMENTARY REPAIR, MAINT AND REPLACEMENT OF OLD UNSER PIPE LINES, PUMPS AND OTHER CONNECTED ITEMS AT TBRL RANGE RAMGARH
2026_MES_762491_1
GE I R AND D/CHD-130/2025-26
Open Tender
Civil Works
Item Rate
180 days
Ramgarh
As per tender document
8 documents required · 8 mandatory
₹500
GE I R AND D Chandigarh
₹29,280
Yes
6 Jul 2026
28 Apr 2026
22 May 2026
28 Apr 2026
20 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in soft / loose soil n.exc 1.5 mtr wide n.exc 1.5 mtr deep getting out soil complete all as specified and directed. | 143 | Cum | - | - |
| 2 | Returning filling in including spreading levelling well ramming in layers n.exc 25 cm thick in a layers complete all as specified and directed. | 125 | Cum | - | - |
| 3 | Removing excavated material (soil) n.exc 50 mtr and depositing where directed at a level n.exc 1.5 mtr above the starting point complete all as specified and directed. | 18 | Cum | - | - |
| 4 | Horizontal boring under the road below 2 mtr from the road surface and dia of hole not exc 200mm, with out damaging the existing road, getting out and disposal of soil to a distance not exceeding 50m from the site of work complete all as specified and directed. | 5 | RM | - | - |
| 5 | Material and labour for road cutting laying of pipe not exceeding 90 cm below ground level not exceeding 1 meter complete all as specified and directed. | 9 | RM | - | - |
| 6 | Material and labour for cement concrete type C2 1:3:6 (40 mm graded aggregate) for making good to disturbed surface of road etc. complete all as specified and directed. | 1 | Cum | - | - |
| 7 | Cutting and taking up or down GI/Steel tubing and connections, including cleaning for refixing or removal to store of following size bore of pipe 25 mm complete all as specified and directed. | 80 | RM | - | - |
| 8 | All as per sserial item No. 7 here in before but bore of pipe 50 mm. | 110 | RM | - | - |
| 9 | All as per serial item No. 7 here in before but bore of pipe 80 mm. | 80 | RM | - | - |
| 10 | All as per serial item No. 7 here in before but bore of pipe 100 mm. | 100 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments130.pdf
Tender Documents • 0.85 MB
BOQ_854102.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .