Loading…
Loading…
Tender ID
Tender Value
₹86.5 L
EMD Value
₹1.7 L
Closing Date
25 Mar 2026, 6:00 pmClosed
EE RMC
RMC
Construction of Vending zone near Booty More under Ward No 05 of RMC
2026_UDD_111866_1
247/Eng 2026
Open Tender
Civil Works
Works
180 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.7 L
20 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification & direction of E/I.(vide classification of soil item-B) | - | m3 | - | - |
| 2Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered ,rammed,fully compacted and fine dressed with earth obtained after cutting with lead a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I ( Mode of measurement compacted volume ) | |||||
| 3Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | |||||
| 4Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification & direction of E/I. | |||||
| 5Providing designation 75B one brick flat soling –do-- --do-- | |||||
| 6Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level | |||||
| 7Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | |||||
| 8Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering shuttering, finishing and renforcement-all work up to plinth levelRCC 1:1.5:3 | |||||
| 9Reinforced cement concrete work in wall , inluding attached pilaster, buttresses, plinth and string coarse, fillets,columns,pillars-----do-----do-------E/I RCC 1:1.5:3 | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_151041.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .