Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC HANUMAN NAGER BHIYA PADA BOISAR PALGHAR 401501 | BOISAR | PALGHAR | MAHARASHTRA | 401501 | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.2 Cr+₹59,979 (0.49%)Rejected-AOC A 8 2ND FLOOR RAJ INDUSTRIAL COMPLEX MILITARY ROAD MAROL ANDHERI E MUMBAI 400 059 | MUMBAI | MUMBAI | MAHARASHTRA | 400059 | 2 | Rejected-AOC L2 | |
| 3 | 3₹1.3 Cr+₹7.0 L (5.72%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical 21 SWASTIK CHAMBERS GROUND FLOOR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | - | Rejected-Technical Technically disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically disqualified |
Tender Value
₹1.4 Cr
Closing Date
10 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Prateek Pareek
Room no 5,HLUESS ofc RLG bld BARC, Trombay, Mumbai 400085
Laying of SS pipe duct for ventilation purposes.
2021_BARC_665265_1
BARC/HUES/NG-13/32/2021-22
Open Tender
Pipe Laying Works
Item Rate
240 days
RLG complex, BARC, Trombay, Mumbai 400085
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
HLUESS ofc RLG bld BARC
25 May 2022
28 Dec 2021
11 Jan 2022
28 Dec 2021
10 Jan 2022
28 Dec 2021
28 Dec 2021 - 4 Jan 2022
5 Jan 2022
180 days
Amount
Supply, Fabrication, laying (Excluding welding & pipe fittings), testing and commissioning of DN 250 mm (10” dia), Sch40, SS 304 L WLD pipe as per clause-1 of specifications and as directed by the Engineer-in-charge.
MS structural work for clause 5.
Welding: Welding of butt joints on SS-304L pipe laid under item-item-1 & 2 as per clause-3 of Technical Specification and as directed by the Engineer-in-Charge.
FRP LINING of item 1.1 as per Clause-4 of Technical Specification and as directed by the Engineer-in-Charge.
Commissioning of end connector at both the end of RLG building & Filter House during week end shutdown period of following size pipe line duct including blankoff old duct by suitable means at each end for commissioning of new duct
M/s Associated Engineers
ENGINEERING CONSOLIDATED
stage.html
html • 0.05 MB
techsummary_700239.pdf
PDF • 0.34 MB
finance_700239.pdf
PDF • 0.34 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_700239.pdf
PDF • 0.34 MB
NG13WorkOrder.pdf
PDF • 2.85 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .