Loading…
Loading…
Tender Value
₹15.3 L
EMD Value
₹15,277
Closing Date
15 Jun 2026, 5:00 pm
Block Development Officer, Gunupur
Block Development Officer, Gunupur
CONSTRUCTION OF ADDITIONAL CLASS ROOM BUILDING AT ELMANGUDA GUPS (ELEMENTARY) GUNUPUR
2026_PZPGN_129956_2
BDO,Gunupur-Online-01/2026-27
Open Tender
Civil Works - Buildings
90 days
ELMANGUDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹15,277
Yes
29 May 2026
29 May 2026
16 Jun 2026
29 May 2026
15 Jun 2026
29 May 2026
29 May 2026 - 10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kinds of soil with 50 mtrs initial lead and 1.5 mtrs initial lift including levelling and dressing the bed etc | 1 | Each cum | 274 | ₹273.73 |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour et complete as per the direction of EIC | - | Each cum | 666.28 | - |
| 3 | P.C.C. (1:3:6) to using 40 mm size hard granite metal incluidng cost, conveyance of all material and labour etc complete as per the direction of EIC | - | Each cum | 5,948.45 | - |
| 4 | P.C.C. (1:3:6) to using 40 mm size hard granite metal incluidng cost, conveyance of all material and labour etc complete as per the direction of EIC | - | Each cum | 5,948.45 | - |
| 5 | R.C.C. M20 for column base & plinth bean using 12 mm size BHG chips including cetnering, shuttering etc, cost, conveyance of all material and labour etc complete as the direction of EIC | - | Each cum | 5,921.92 | - |
| 6 | R.C.C. M20 for Lintel Band & Door window sill band using 12mm size BHG chips including centering, shuttering etc, cost, conveyance of all material and labour etc complete as per direction of EIC | 1 | Each cum | 5,921.92 | ₹5,916 |
| 7 | Rigid smooth centering for RCC works including flase work and dismanterling them after casting including cost of materials compete in ground floor RCC foundation, plinth band and footing base of column | 71.19 | Each sqm | 84.24 | ₹5,997.05 |
| 8 | RCC column from PL to RL | 44.7 | Each sqm | 1,208.74 | ₹54,030.68 |
| 9 | Lintel Beam | 14.33 | Each Sqm | 566.1 | ₹8,112.21 |
| 10 | Roof Beam | 32.84 | Each Sqm | 1,208.74 | ₹39,695.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
Elmanguda.pdf
Tender Documents • 3.40 MB
BOQ_592969.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid