| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAccepted-AOC NOT AVAILABLE | ₹9.4 Cr | L1 | Accepted-AOC Ok for AOC |
| 2 | L2₹9.6 Cr+₹18.4 L (1.95%)Rejected-Finance | ₹9.6 Cr+₹18.4 L (1.95%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹10.2 Cr+₹79.1 L (8.39%)Rejected-Finance PODDAR COLONY SAGAR M P | ₹10.2 Cr+₹79.1 L (8.39%) | L3 | Rejected-Finance Disqualified |
| 4 | L4₹10.5 Cr+₹1.0 Cr (11.0%)Rejected-Finance | ₹10.5 Cr+₹1.0 Cr (11.0%) | L4 | Rejected-Finance Disqualified |
| 5 | Rejected-Technical SADAR BAZAR DISTT SAGAR | - | - | Rejected-Technical Disqualified |
Tender Value
₹10.3 Cr
EMD Value
₹5.2 L
Closing Date
29 Oct 2025, 5:00 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
CCHTRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
ROAD WIDENING FROM NANAKHEDA SQUARE TO SHANTI PALACE SQUARE MR 2 ROAD
2025_UAD_430826_2
13/Simhasth Cell/2025
Open Tender
Civil Works - Roads
Percentage
365 days
NANAKHEDA SQUARE TO SHANTI PALACE SQUARE MR 2 ROAD
YES PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹30,000
₹5.2 L
SUPRIDENTENT ENGINEER OFFICE UJJAIN NAGAR NIGAM
15 May 2026
15 Oct 2025
31 Oct 2025
15 Oct 2025
29 Oct 2025
15 Oct 2025
17 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavement i/c breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead upto 1000 meter, stacking serviceable and unserviceable materials separately and as per relevant clauses of section-200. | - | CuM | - | - |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 meter, stacking serviceable and unserviceable materials separately
and as per relevant clauses of section-200.
(b) Granular courses | 0.6 | cum | - | - |
| 3 | Carriage of material
Loading and unloading of Excavated Earth (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) | - | CuM | - | - |
| 4 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. | - | CuM | - | - |
| 5 | Transplantation of trees including trimming the branches of full grown trees as per the requirement, giving the wax treatment of the trimmed area of branches, uprooting the tree and transporting the uprooted tree to the specified site of the transplantation as directed by the engineer-in-charge upto 12 km lead including all lifts, transplanting
the uprooted tree by digging a required size of pit, filling it with fresh garden soil and manure as per the requirement and maintaing it for a period of 4 months by watering, weeding, manuring etc complete. | - | Each | - | - |
| 6 | Carriage of material
Loading and unloading of Excavated Earth (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) | - | CuM | - | - |
| 7 | Construction of Embankment/Sub grade/ earth shoulders, as per clause 305 & its sub-clauses, Where required but with approved materials/soil like morrum CBR value not less then 7% i/c all lead & lifts i/c excavation, cost of watering, compaction and maintenance of surface during construction to ensure shedding & preventing ponding of water (clause 305.3.6) shaping & dressing (clause 305.3.7), finishing etc. complete but excluding scarifying existing granular/bituminous road surface vide clause 305.6. | - | CuM | - | - |
| 8 | Construction of granular sub-base by providing Coarse graded material (CBR>30), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller of 80-100 KN Static weight to achieve the desired density, complete in all respect as per relevant clauses of section-400. | - | CuM | - | - |
| 9 | Construction of Dry lean cement concrete Sub-base over a prepared subgrade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per MORTH Specifications Table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with paver with electronic sensor/mechanical paver, compacting with 8-10 tonnes vibratory roller, finishing and curing and as per relevant clauses of section- 601. | - | cum | - | - |
| 10 | Construction of dowel jointed, plain cement concrete pavement in M-40 grade concrete over a prepared sub base with 43 or higher grade cement, coarse and fine aggregate conforming to IS:383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver with spreading the concrete by shovels, rakes compacted using needle, screed and plate vibrator and finished in a continuous operation including provision of contraction, expansion, and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, placing of dowel bar,tie rod admixtures as approved, curing compound, finishing to lines and grades as per approved drawings as per IRC-15 2011 and as per relevant clauses of section-602 of specifications complete excluding cost of steel in dowel ber & tie rod etc. | - | CuM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
tenderdocument.pdf
Tender Documents • 1.73 MB
corrigendum.pdf
Other Document • 0.53 MB
NIT.pdf
Other Document • 0.26 MB
BOQ_538146.xls
BOQ • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .