SE EUDC MEERUT
SE EUDC MEERUT
For Installation of 01 No. 250 KVA Transformer at Khatik Mohalla, P.L. Sharma Road and for Increasing Capacity of Transformer from 250 KVA to 400 KVA, Under Electricity Urban Distribution Division-II, Meerut.
2021_PVVNL_619005_1
E-Tender No.-58/EUDC/MEERUT/2021-2022
Open Tender
Electrical Works
Lump-sum
SE EUDC MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EUDC MEERUT
₹2,000
30 Sept 2021
11 Sept 2021
23 Sept 2021
11 Sept 2021
23 Sept 2021
11 Sept 2021
Amount
Installation of 01 no. 250 KVA transformer at khatik mohalla, P.L. sharma road for removing low voltage problem of 400 KVA transformer at 33/11 KV sub-station, begumpul in the area of Electricity Urban Distribution Sub-Division-III, under Electricity Urban Distribution Division-II, Meerut.
Cartage of ST pole 11 Mtr. long/from central store victoria park to JE store, 33/11 KV, begumpul sub-station/dump site including loading and unloading at both ends.
Cartage of line material from central store to JE store, 33/11 KV, begumpul sub-station/dump site and then site of work including loading and unloading at both ends.
Cartage of ST pole 11 Mtr. long from JE store, 33/11 KV, begumpul sub-station/dump site to work site including loading and unloading at both ends.
Erection of single support of ST pole 11 Mtr. long for LT line.
Laying of LT ABC of size 3x120+1x95+1x16 Sq.mm for LT line, complete in all respect.
Erection of double pole structure on ST pole after digging required size pit and refilling the same after completion of work.
Cartage of 250 KVA transformer from central store to JE store at 33/11 KV, begumpul sub-station including loading and unloading at both ends.
Providing and fixing aluminiug lugs with LT XLPE cable.
Installation of 250 KVA transformer on newly constructed double pole.
Making grouting poles, complete in all respect.
Erection of stay complete.
Making earthing of pole by earth rod.
Concreting of pole, complete in all respect.
Laying of 1x240 Sq.mm 11 KV XLPE cable (double circuit) for over-head line.
Laying of ACSR weasel conductor for support of line.
Fabrication and fixing of M.S. angle 75x75 mm.
Water level earthing of neutral and body of 250 KVA transformer installed at P.L. sharma road, near voda phone store shall be done by B-class G.I. pipe 1¼" dia by boaring the earth upto water level, 25 Mtr. deep and connecting M.S. flat of size 35x5 mm with the transformer. The transformer will be earthed at different points including welding properly after cutting and welding the strips in proper shape size. The contractor shall provide the socket and cap at upper edge of the pipe for pouring water during summer season and 01 No. cone at the bottom of the pipe for making suitable contact with the water, complete in all respect.
Erection of 11 KV fuse set.
Fabrication and fixing of M.S. channal of size 125x50x6 mm for transformer base.
Fixing of tail less unit on 250 KVA transformer, complete in all respect.
Erection of 11 KV TPMO, complete in all respect.
Increasing capacity of transformer from 250 KVA to 400 KVA for removing low voltage problem at shiv mandir, mayur vihar, phase-2, shastri nagar in the area of Electricity Urban Distribution Sub-Division-IX, under Electricity Urban Distribution Division-II, Meerut.
Cartage of PCC pole 8.5 Mtr. long from central store, victoria park to JE store, 33/11 KV, jagriti vihar sub-station/dump site including loading and unloading at both ends.
Cartage of line material from central store to JE store, 33/11 KV, jagriti vihar sub-station/dump site and then site of work including loading and unloading at both ends.
Cartage of PCC pole 8.5 Mtr. long from JE store, 33/11 KV, jagriti vihar sub-station/dump site to work site including loading and unloading at both ends.
Erection of single support of PCC pole 18.5 Mtr. long for LT line.
Cartage of 400 KVA transformer from central store, victoria park to JE store 33/11 KV, jagriti vihar sub-station/dump site including loading and unloading at both ends.
Removing 250 KVA transformer from plinth after opening of all accessories and service connection of consumers connected with transformer, complete in all respect.
Cartage of 250 KVA transformer from site to JE store at 33/11 KV, jagriti vihar sub-station including loading and unloading at both ends.
Laying of ABC of size 3x95+1x70+1x16 Sq.mm for LT line, complete in all respect.
Installation of 400 KVA transformer on existing plinth and reconnection the service connections of consumers, complete in all respect.
Making concreting of pole, complete in all respect.
Erection of stay complete.
Making earthing of pole by earth rod.
Concreting of pole, complete in all respect.
M/S DHARAM DASS & BUDH PRAKASH & CO.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .