| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance | ₹5.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹42,642.80 (8.44%)Admitted-Finance | ₹5.5 L+₹42,642.80 (8.44%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical not submitted boq as per NIT |
| 4 | Rejected-Technical | - | - | Rejected-Technical not submitted boq as per NIT |
| 5 | Rejected-Technical | - | - | Rejected-Technical not having required experience as per NIT |
| Sl No | Description | Qty | Unit | Sagar Chakraborty L1 | MAHALAXMI ASSOCIATE L2 |
|---|---|---|---|---|---|
| 1.00Roof Waterproofing | |||||
| 1.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within the campus as directed by Engineer in Charge. For thickness of tiles above 25 mm and up to 40 mm | 475.19 | Sqm | 100 ₹47,519 Lowest | 100 ₹47,519 Lowest |
| 2.00Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: | |||||
| 2.01 | (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured. | 475.19 | Sqm | 630 ₹2,99,369.7 | 550 ₹2,61,354.5 Lowest |
| 3.00Grading roof for water proofing treatment with | |||||
| 3.01 | (a) Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 35.64 | Cum | 3,500 ₹1,24,740 Lowest | 6,200 ₹2,20,968 |
| 4.00Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | |||||
| 4.01 | In 75x75 mm deep chase | 36 | RM | 500 ₹18,000 | 100 ₹3,600 Lowest |
| 5.00 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 99 | Sqm | 15 ₹1,485 | 10 ₹990 Lowest |
| 6.00 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 48 | Sqm | 100 ₹4,800 | 65 ₹3,120 Lowest |
Tender Value
₹7.0 L
EMD Value
₹14,000
Closing Date
6 Aug 2025, 11:00 amClosed
HOS MAINTENANCE
IPM SECTION, IIT GUWAHATI
Waterproofing works at the roof above Canteen and mess area in Subansiri Hostel IITG
2025_IITG_870812_1
IITG/IPM/NIT/R/2025-26/25
Open Tender
Civil Works
Works
180 days
IIT GUWAHATI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
IIT GUWAHATI
₹14,000
2 Sept 2025
28 Jul 2025
7 Aug 2025
28 Jul 2025
6 Aug 2025
28 Jul 2025
Amount
Roof Waterproofing
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within the campus as directed by Engineer in Charge. For thickness of tiles above 25 mm and up to 40 mm
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured.
Grading roof for water proofing treatment with
(a) Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :
In 75x75 mm deep chase
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound content With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
Distempering with 1st quality acrylic distemper (ready mixed having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour Old work (one or more coats)
MAHALAXMI ASSOCIATE (BID ID -3261402)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .