Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 1 129 KOOLANAICKENPATTI GOMANGALAM POLLACHI TAMILNADU 642107 | COIMBATORE | TAMIL NADU | 642107 | ₹1.1 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.1 Cr+₹1.7 L (1.57%)Rejected-Finance 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | ₹1.1 Cr+₹1.7 L (1.57%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | V KALIESWARAN L1 | SRI MURUGAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.001.Strengthening of the road from Munikiladi to Mandaioruttikadu road (R128) | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete | 3,296.52 | Sqm | 1 ₹3,296.52 Lowest | 5 ₹16,482.6 |
| 3.00 | Picking the existing mettaled surface and sectioning including all labour charges etc, complete. | 3,433.87 | Sqm | 21.84 ₹74,995.72 Lowest | 25 ₹85,846.75 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 988.96 | Cum | 1.31 ₹1,295.54 Lowest | 6 ₹5,933.76 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,284.38 | Cum | 2,287.65 ₹29,38,211.91 Lowest | 2,294 ₹29,46,367.72 |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 10,327.87 | Sqm | 82.88 ₹8,55,973.87 Lowest | 86 ₹8,88,196.82 |
| 7.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 10,338.75 | Sqm | 19.55 ₹2,02,122.56 Lowest | 25 ₹2,58,468.75 |
| 8.00 | Providing and laying Bituminious concrete 40MM which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 258.47 | Cum | 12,655 ₹32,70,937.85 Lowest | 12,685 ₹32,78,691.95 |
| 9.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 803.53 | Cum | 1.35 ₹1,084.77 Lowest | 5 ₹4,017.65 |
| 10.00 | Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete | 2 | Nos | 2,730 ₹5,460 Lowest | 2,750 ₹5,500 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Additional Collector (Dev), Coimbatore
DRDA, Coimbatore
Strengthening of the road from Munikiladi to Mandaioruttikadu road (R128) in Anaimalai Block - Package No TN 02-42 in Anaimalai Block of Coimbatore District Under NABARD RIDF 2024-25
2025_RDTN_570105_1
DIPR/2266/Tender/2025 dated 06.06.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.2 L
20 Aug 2025
17 Jun 2025
25 Jun 2025
17 Jun 2025
25 Jun 2025
17 Jun 2025
Amount
1.Strengthening of the road from Munikiladi to Mandaioruttikadu road (R128)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying Bituminious concrete 40MM which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Supplying and fixing of Kilo Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing of Name board cum Citizen board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification a
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification a
Providing and fixing reflective road studs of category A raised pavement markers made out of poly carbonate/methyl methercrylate/ABS moulded body confirming to ASTM D788
Rumble Strips=3*3.75*0.25=2.81sqm
RCC Culvert
Earth work excavating and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS20B) etc., complete in all respects as directed by the departmental officers.
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications
Supplying and erecting centering for sides for all reinforced cement concrete works like Drain sides, revetment sides etc., using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm including removing the same after specified period without damaging RCC works etc., complete as directed by the departmental officers complying with relevant standard specifications
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill)
Providing and fixing Tar Paper including labour etc complete.
Providing and fixing weepholes of 100 mm dia. PVC pipes of required lengths including cost and conveyance of all materials to work site, cost and labour etc complete
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI MURUGAN CONSTRUCTIONS (BID ID -1377857)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .