Loading…
Loading…
Tender Value
₹49.7 L
EMD Value
₹99,340
Closing Date
14 Sept 2026, 2:00 pm
Executive Engineer FSC Narbal
Narbal
Construction of Flood Protection works on Rantsi Nallah from RD 2600m.
2026_IFC_321751_4
e-Nit No.16 of 2026-27 of FSC Narbal
Open Tender
Civil Works
Percentage
60 days
Narbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer FSC Narbal
₹99,340
21 Aug 2026
21 Aug 2026
15 Sept 2026
21 Aug 2026
14 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,629.75 | Cum | 187.3 | ₹3,05,252.18 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1,110.32 | Cum | 371.15 | ₹4,12,095.27 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 784.12 | cum | 218.4 | ₹1,71,251.81 |
| 4 | Supply of Stone boulder (Quarry) nominal size 225 mm ( Quarry stone) | 1,110.32 | Cum | 1,821.25 | ₹20,22,170.3 |
| 5 | Supply of Wooven G.I Crate mesh of 4mm wire Guage and 100mmx100mm mesh of standard Quality and Manufacture for resistance / Liability of crates which shall have to provide before start of work. The Supply including all means of carriage from supply source to actual site of work. (Complete Job). | 52,224 | Sft | 23 | ₹12,01,152 |
| 6 | Carriage of Material from available Sources to road site of work by Mechanical Transport including loading, unloading and stacking.
Quarry stone for Avg. Lead of 20 Kms from wuyan. | 1,110.32 | Cum | 482.31 | ₹5,35,518.44 |
| 7 | Carriage of Material from Road site to actual site of work by Manual Labour, including loading, unloading and stacking for an avg. Lead of 100m.
Quarry Stone. | 1,110.32 | Cum | 287.48 | ₹3,19,194.79 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_1075859.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].