| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance NOWBUGH CHADOORA | JAMMU | JAMMU AND KASHMIR | 180001 | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹18.5 L (15.6%)Admitted-Finance | ₹1.4 Cr+₹18.5 L (15.6%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UMAR SOIL CONSTRUCTIONS L1 | BILAL AHMAD MIR L2 |
|---|---|---|---|---|---|
| 1.00Dismantling & Reconstruction | |||||
| 2.00 | Dismantling of Boundry walls (dry stone spalls) | 150 | Cum | 100 ₹15,000 | 50 ₹7,500 Lowest |
| 3.00 | Reconstruction of country type Boundry wallsdry stone spalls | 150 | Cum | 500 ₹75,000 | 100 ₹15,000 Lowest |
| 4.00Earthwork | |||||
| 5.00 | Excavation of road in hilly Areas in hard soil by Mechnical Means including Cutting and trimming of side slopes , preparation of sub grade and disposing of surplus excavated Earth upto required lifts and leads outside the periphery of site of work(Finished work to be measured, complete ) | 16,451 | Cum | 75 ₹12,33,825 Lowest | 101 ₹16,61,551 |
| 6.00 | Excavation in hilly Areas in ordinary rock not requring blasting by Mechnical Means including Cutting and trimming of side slopes and disposing of surplus excavated ordinary rock upto required lifts and leads outside the periphery of site of work (Finished work to be measured, complete ) | 913.9 | Cum | 150 ₹1,37,085 Lowest | 220 ₹2,01,058 |
| 7.00 | Excavation for roadway in hard rock by mechanical means, (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposing of surplus excavated rock up to required lifts and leads outside the periphery of site of work , trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5, | 913.9 | Cum | 400 ₹3,65,560 | 300 ₹2,74,170 Lowest |
| 8.00 | Construction of Embankment with approved material deposited at site from Roadway cutting and excavation from foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including , carriage of all materials with all leads, lifts, loading unloading etc.(Finished work to be measured, complete .) | 4,211.28 | Cum | 50 ₹2,10,564 Lowest | 90 ₹3,79,015.2 |
| 9.00 | Construction of unlined surface drains in hard soil/ordinary rock of required cross sectional area mechancially in soil to specified lines, grades,levels and dimentions.Excavated material to be used in embankment with required lead and lift as per technical specification clause 307(finished work to be measured complete, | 2,800 | Rm | 20 ₹56,000 Lowest | 60 ₹1,68,000 |
| 10.00Retaining/Breast Walls | |||||
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
27 Nov 2020, 4:30 pmClosed
Superintending Engineer PMGSY Circle Srinagar
Engineering Complex, Rajbagh, Srinagar
Construction of road from NHW To Khatanapati, Stage-I, Length 1.80Kms, Phase-VII, Package No. JK13-37 (Tender Call 1st)
2020_KSRRD_102091_1
JK1337
Open Tender
CIVIL
Item Rate
278 days
Ganderbal
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
Accounts Officer
₹3.4 L
Srinagar
4 Dec 2020
17 Nov 2020
28 Nov 2020
17 Nov 2020
27 Nov 2020
18 Nov 2020
19 Nov 2020
Amount
Dismantling & Reconstruction
Dismantling of Boundry walls (dry stone spalls)
Reconstruction of country type Boundry wallsdry stone spalls
Earthwork
Excavation of road in hilly Areas in hard soil by Mechnical Means including Cutting and trimming of side slopes , preparation of sub grade and disposing of surplus excavated Earth upto required lifts and leads outside the periphery of site of work(Finished work to be measured, complete )
Excavation in hilly Areas in ordinary rock not requring blasting by Mechnical Means including Cutting and trimming of side slopes and disposing of surplus excavated ordinary rock upto required lifts and leads outside the periphery of site of work (Finished work to be measured, complete )
Excavation for roadway in hard rock by mechanical means, (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposing of surplus excavated rock up to required lifts and leads outside the periphery of site of work , trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5,
Construction of Embankment with approved material deposited at site from Roadway cutting and excavation from foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including , carriage of all materials with all leads, lifts, loading unloading etc.(Finished work to be measured, complete .)
Construction of unlined surface drains in hard soil/ordinary rock of required cross sectional area mechancially in soil to specified lines, grades,levels and dimentions.Excavated material to be used in embankment with required lead and lift as per technical specification clause 307(finished work to be measured complete,
Retaining/Breast Walls
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a required lead, dressing of sides and bottom and backfilling in trenches with excavated suitable material hard soil/ ordnary rock.(Finished work to be measured, complete .)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-10 Nominal mix 1:3:6), ) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Polygonal/ Random Rubble masonry, uncoursed brought to course in cement sand mortar 1:5,in sub structure as per drawings and technical specifications Clause 702,704,1202 and 1204 including cost of Bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Polygonal/ Random Rubble masonry, uncoursed brought to course with stones obtained from excavation in hard rock in cement sand Mortor 1:5 in sub structure as per drawings andtechnical specifications Clause 702,704,1202 and 1204 including cost of Bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete .)
Polygonal/ Random Rubble masonry, uncoursed brought to course with quarry stones laid Dry in sub structure as per drawings and technical specifications Clause 702,704,1202 and 1204 including cost of Bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Polygonal/ Random Rubble masonry, uncoursed brought to course with stones got from excavation in Hard rock laid dry in sub structure as per drawings and technical specifications Clause 702,704,1202 and 1204 including cost of Bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading .(Finished work to be measured, complete .)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular Material) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (with material obtained from excavation of Hard Rock/soft rock)including all carriage within the project site) ,with all leads, lifts, loading unloading .(Finished work to be measured, complete .)
Providing P.C.C. M 20 50mm thick coping on top of return wall,retaining wall/wing walletc complete as per drawing and technichal specification clause 615,710 and 1204.3.11.)including cost of farm work and including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Crate Protection Work
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a required lead,dressing of sites and bottom and backfilling in trenches with excavated suitable material hard soil/ordinary rock .(Finished work to be measured, complete .)
Providing and laying of boulder apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 , )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(Granular Material)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
RCC 4.00M span Culverts
Earth work in excavation for structures as per drawings and technical specifications Clause 305.1 up to required depth including setting out, consatruction of shoring and bracing, removal of stumps and other deletarious material and disposal up to required lead dressing of sides and bottom and back filling in trenches with excated suitable material hard and ordinary rock.(Finished work to be measured, complete .)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202, & 1203(PCC M10 - Nominal mix 1:3:6) including cost of form work and incl cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete .)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802,803,1202,&1203 (PCC M15 - Nominal mix 1:2.5:5) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing concrete for plain/reinforced concrete in substructure complete as per drawings and technical specifications clause 2,804,805,806,807,1202,&1204 (PCC M15 - Nominal mix 1:2.5:5) including costof form wok and cost & carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing reinforced cement concrete in superstructure complete as per drawings and technical specifications clause 1205.4,&1205.5 for required height (RCC grade M20 - Nominal mix 1:2:4)including cost of farm work and including cost and carriage of all materials from approved source to site of work,but excluding cost,fitting and carriage of reinforcement with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Suppling,fitting & placing TMT bar reinforcement in superstructure as per drawings and technical specifications clause 1002,1010 and 1202)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (Granular Material) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
10 Mtr Cause Way
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 upto required depth, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto required lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material hard soil/ ordnary rock (Finished work to be measured, complete .)
Type B 1st. class bedding on well compacted sand, moorum of approved granual material as per clause 1105 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Type A(concrete cradle) bedding, laying concrete cradle bedding with M15 Grade cement concrete as per clause 1105 (i)including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Stone masonry work in cement mortor 1:4 in foundation , complete as per drawings and technical specifications Clause 702,704,1202 and 1204 including cost of Bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing reinforced cement concrete in foundation complete as per drawings and technical specifications clause 802,803,1202&1203 for required height (RCC grade M25 )including cost of form work and including cost and carriage of all materials from approved source to site of work,but excluding cost,fitting and carriage of reinforcement with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Suppling,fitting & placing TMT bar reinforcement in foundation as per drawings and technical specifications clause 1002,1010 and 1202 )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading,handling,rehandling and octori.(Finished work to be measured, complete .)
RCC 300mm/600mm/1200mm Dia Pipe Culverts And Pipe Crossing
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 upto reqired depth including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto required lead, dressing of side and bottom and backfilling in trenches with excavated suitable material.hard soil/Ordinary rock.(Finished work to be measured, complete .)
Type B (First Class) Bedding, Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii))including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Polygonal Random Rubble massonary,uncoursed brought to course in cement sand mortar 1:5 with quarry stone in sub structure as per drawing and technical specification clause 702,704,1202,1204 and 1109 incl cost of bond stones and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Type A(concrete cradle) bedding, laying concrete cradle bedding with M15 Grade cement concrete as per clause 1105 (i))including cost of form work and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8(Granular Material)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing and laying reinforced cement concrete pipes NP3 for culverts on first class bedding of granular material in single row socketed type fixed with cement mortar 1:2 but excluding excavation,protection works,backfilling, concrete and massonary works in head walls and parapets as per Clause 1106.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete .)
300 mm SS type
600 mm SS type
Providing and laying reinforced cement concrete pipes NP3 for culverts on first class bedding of granular material in double row socketed type fixed with cement mortar 1:2 but excluding excavation,protection works,backfilling, concrete and massonary works in head walls and parapets as per Clause 1106.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori. (Finished work to be measured, complete .) (1200 mm dia SS type)
Road Furniture
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing and fixing of Citizen Information Board as per drawing and detail of PMGSY (Fig 3 "A") with all leads, lifts, loading unloading handling , Re-handling and octori.(Finished work to be measured, complete .)
Providing and Fixing of PMGSY Logo Board( at 2 Kms /Logo Board ) as per drawing and details of PMGSY (Fig: 5 with all leads, lifts, loading unloading handling , Re-handling and octori.(Finished work to be measured, complete .)
Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1,with all leads, lifts, loading unloading handling , Re-handling and octori.(Finished work to be measured, complete .)
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703,
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704, )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Construction of back pillars as per Fig. 1600.1 (c ) as per drawings and technical specification Clause 1602.3including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
Providing and fixing of cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801,)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
BILAL AHMAD MIR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .