Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹31.0 CrAdmitted-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | -14.80% | ₹31.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹32.4 CrAdmitted-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | -10.77% | ₹32.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹35.5 CrAdmitted-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | -2.22% | ₹35.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹37.1 CrAdmitted-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | +2.22% | ₹37.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹39.1 CrAdmitted-Finance 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | +7.50% | ₹39.1 Cr | L5 | Admitted-Finance |
Tender Value
₹36.3 Cr
EMD Value
₹72.7 L
Closing Date
6 Aug 2026, 3:00 pmClosed
ABHISHEK SHER
Karnal PHED No. 1
Installation of tube wells and laying the pipe lines in village PR FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT
2026_HRY_536214_1
20267EE50F3A FD8E 4A8A BF4B 21F3F8E5757B571PUH
Open Tender
Civil Works
Works
730 days
SALWAN SALWAN SALWAN SALWAN
2 documents required · 2 mandatory
₹20,000
₹72.7 L
Yes
PHED No. 1, Karnal
2 Sept 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | (PART-A):- SALWAN VILLAGE DISTT. KARNAL : W/S SCHEME “Installation of Tube wells, pump chamber, boundary wall, Laying the distribution lines and FHTC. includingOperation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete in all respect. (PART–B):- SALWAN VILLAGE DISTT. KARNAL : SEWAGE SCHEME. Laying of sewerage system, construction of manholes, inspection chamber and construction of 4.00 MLD STP (SBR technology based) SCADA / PLC controlled including MPS and IPS comprising wet well sump, boundary wall, pump chamber, Rising Main, staff quarters, Pumping Machinery, DG set etc. including Operation and Maintenance cum defect liability period for 06 years after successful completion of 3 Months trial run period complete in all respect. (The amount shall be included of complete cost of HSR + N.S. Items + O&M cost) | - | Nos | 36,33,82,836 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.05 MB
BOQ_615327.xls
BOQ • 0.24 MB
OT0147129.pdf
Other Document • 8.97 MB
SalwanITBCorrigendum.pdf
PDF • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].