| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC Work allotted after financial approval from committee | |
| 2 | L2₹9.9 L+₹1.4 L (16.8%)Rejected-AOC | L2 | Rejected-AOC Work not allotted |
| Sl No | Description | Qty | Unit | Gowri Associates L2 | HS Associates L1 |
|---|---|---|---|---|---|
| 1.00 | Part-A (Supply of Material)
F Bracket for STP with Nut & Bolt | 33 | Nos. | 495.6 ₹16,354.8 | 413 ₹13,629 Lowest |
| 2.00 | F Bracket for Insulator on PCC with Nut & Bolt | 59 | Nos. | 365.8 ₹21,582.2 | 295 ₹17,405 Lowest |
| 3.00 | Barbed Wire | 142 | Kg. | 218.3 ₹30,998.6 | 188.8 ₹26,809.6 Lowest |
| 4.00 | Stone Pad | 111 | Nos. | 177 ₹19,647 | 153.4 ₹17,027.4 Lowest |
| 5.00 | Stay Set Complete | 36 | Nos. | 2,596 ₹93,456 | 2,360 ₹84,960 Lowest |
| 6.00 | LT Shackle Insulator | 36 | Nos. | 29.5 ₹1,062 | 23.6 ₹849.6 Lowest |
| 7.00 | Part -B (Work/ Erection)
Carriage of ST Pole 11 Mtr Long. from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 33 | Nos. | 660.8 ₹21,806.4 | 590 ₹19,470 Lowest |
| 8.00 | Carriage of PCC Pole 8.5 Mtr Long. from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 76 | Nos. | 672.6 ₹51,117.6 | 590 ₹44,840 Lowest |
| 9.00 | Cartage of AB Cable 50 sqmm/LT Cable 1X400 sqmm from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 1,370 | Mtr. | 6.49 ₹8,891.3 | 5.9 ₹8,083 Lowest |
| 10.00 | Cartage of Line material viz. ACSR Weasal conductor, Cross arm, Insulators, Clamps with Nut & Bolt, MS Top/Dropper Chanel, Earthing Complete, Cross Brassing MS angle, 11 KV Fuse Set, Dist. Box with clamp, Gaurding angle with clamp, Gaurding wire, Number Plate, Alu. Lugs and other line material, if required in Estimate/Package from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) | 50 | Qtl. | 265.5 ₹13,275 | 236 ₹11,800 Lowest |
Tender Value
₹8.4 L
EMD Value
₹9,000
Closing Date
8 May 2025, 1:00 pmClosed
SE
EDC, Agra
Line Shifting Work for widening at Korai to Malikpur, Jajau, Sarsa, Masailya to Kiraoli Kagrol Road Agra Jaipur Highway in full deposit scheme on semi turnkey basis under EDD, Kiraoli, Agra
2025_DVVNL_1032433_1
61/EDCA/2024-25
Open Tender
Electrical Works
Piece-work
45 days
EDC
As per tender specification
2 documents required · 2 mandatory
₹1,180
www.dvvnl.org
₹9,000
21 Jan 2026
25 Apr 2025
8 May 2025
25 Apr 2025
8 May 2025
25 Apr 2025
Part-A (Supply of Material) F Bracket for STP with Nut & Bolt
F Bracket for Insulator on PCC with Nut & Bolt
Barbed Wire
Stone Pad
Stay Set Complete
LT Shackle Insulator
Part -B (Work/ Erection) Carriage of ST Pole 11 Mtr Long. from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Carriage of PCC Pole 8.5 Mtr Long. from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Cartage of AB Cable 50 sqmm/LT Cable 1X400 sqmm from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Cartage of Line material viz. ACSR Weasal conductor, Cross arm, Insulators, Clamps with Nut & Bolt, MS Top/Dropper Chanel, Earthing Complete, Cross Brassing MS angle, 11 KV Fuse Set, Dist. Box with clamp, Gaurding angle with clamp, Gaurding wire, Number Plate, Alu. Lugs and other line material, if required in Estimate/Package from Electricity Store Center Agra to Pit site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.)
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) ST Poles 11 Mtr. long (Single Pole) along with stone pad including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) ST Poles 11 Mtr. long (Four Pole) along with stone pad including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) PCC Poles 8.5 Mtr. long (Single Pole) along with stone pad including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) PCC Poles 8.5 Mtr. long (Double Pole) along with stone pad including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
Laying, sagging, stringing, winding and jumphring (Overhead) of AB Cable 50 sqmm at 11 KV/LT Line as per Respo norms and direction by Supervising Engineer.
Laying, sagging, stringing, winding and jumphring of LT Cable 1X400 sqmm at distribution T/F as per Respo norms and direction by Supervising Engineer.
Laying, sagging, stringing, winding and jumphring of ACSR Weasel Conductor at 11 KV/LT Line as per RESPO norms. It includes the cost of Labour, T&P carrier etc. required for propper completion of work
Fixing of distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Installation of D.O. Fuse set as per RESPO norms and direction by supervising Engineer.
Erection and grouting of stays as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Earthing Complete with earth rod and earthing wire etc. as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Fixing of Danger Boards With clamps on Poles (shock Proof, Rust Proofs) as per RESPO norms and direction by supervising Engineer.
Fixing of Number Plate as required on Poles as per RESPO norms and direction by supervising Engineer.
Fixing of barbed Wire as required on Poles as per RESPO norms and direction by supervising Engineer.
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel Gaurding wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
Construction of plinth for 250 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out as per direction of supervising engineer.
Fencing of 250 KVA T/Fs as per following specification -Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2"x1.5", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system & Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
Chemical Earthing of 250 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
Cost of Disemntaling 115 Poles Existing Line ie. Material (ACSR Weasel Old & Iron Scrap) and received back to Store center, Agra. (Apprx 00-50 KM)
Gowri Associates (BID ID -5176686)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .