Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC | 1 | Accepted-AOC aoc | |
| 2 | 2₹3.7 Cr+₹11.5 L (3.24%)Rejected-Finance 0 0 0 KHIRKITA DUBEY PAKARI GORAKHPUR UTTAR PRADESH 273412 | GORAKHPUR | UTTAR PRADESH | 273412 | 2 | Rejected-Finance Rejected being higher quoted rate | |
| 3 | 3₹3.8 Cr+₹26.9 L (7.60%)Rejected-Finance 123 VILL AND POST MDHAURA GONDA | GONDA | GONDA | UTTAR PRADESH | 3 | Rejected-Finance Rejected being higher quoted rate | |
| 4 | 4₹3.9 Cr+₹34.8 L (9.84%)Rejected-Finance BH N 16 KHN 609 NARAYAN NAGAR COLONY INDIRA NAGAR LUCKNOW U P | LUCKNOW | UTTAR PRADESH | 226001 | 4 | Rejected-Finance Rejected being higher quoted rate | |
| 5 | 5₹4.0 Cr+₹48.0 L (13.5%)Rejected-Finance 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | 5 | Rejected-Finance Rejected being higher quoted rate |
| Sl No | Description | Qty | Unit | M/S J AND V INFRATECH PRIVATE LIMITED L3 | M/S SRI RAM TRADERS L1 | M/s Krishna Enterprises L2 | BHARAT CONSTRUCTION L5 | M/S SUDHA SINGH L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | DIVISIONAL OFFICE
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.
From 0.00 mt to 1.50 mt | 830 | CUM | 182 ₹1,51,060 | 170 ₹1,41,100 | 165 ₹1,36,950 | 120 ₹99,600 Lowest | 174.64 ₹1,44,948.71 |
| 2.00 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.
From 1.50 mt to 3.00 mt | 210 | CUM | 270 ₹56,700 | 180 ₹37,800 Lowest | 240 ₹50,400 | 180 ₹37,800 Lowest | 259.71 ₹54,539.1 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 250 | CUM | 6,500 ₹16,25,000 | 4,000 ₹10,00,000 Lowest | 4,450 ₹11,12,500 | 4,500 ₹11,25,000 | 4,570.23 ₹11,42,556.25 |
| 4.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 60 | CUM | 1,990 ₹1,19,400 | 960 ₹57,600 Lowest | 1,350 ₹81,000 | 1,200 ₹72,000 | 1,424.84 ₹85,490.64 |
| 5.00 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 955 | SQM | 295 ₹2,81,725 | 180 ₹1,71,900 Lowest | 203 ₹1,93,865 | 300 ₹2,86,500 | 208.02 ₹1,98,657.19 |
| 6.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement contentin design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work upto Plinth Lvl.
TIE BEAM
R.C.C.work in foundation / Footing
R.C.C.work in Column upto Plinth Lvl. | 300 | CUM | 8,800 ₹26,40,000 | 6,000 ₹18,00,000 Lowest | 6,250 ₹18,75,000 | 8,300 ₹24,90,000 | 6,376.81 ₹19,13,043.6 |
| 7.00 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum
Lintel / Lintel Band
R.C.C. work in slab
SOAK PIT slab
R.C.C. work in beams
R.C.C.work in Column | 480 | CUM | 6,650 ₹31,92,000 | 5,950 ₹28,56,000 Lowest | 6,500 ₹31,20,000 | 8,500 ₹40,80,000 | 6,615.42 ₹31,75,400.64 |
| 8.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class 150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 150 | CUM | 4,950 ₹7,42,500 | 4,200 ₹6,30,000 Lowest | 4,800 ₹7,20,000 | 5,500 ₹8,25,000 | 4,945.03 ₹7,41,754.5 |
| 9.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 12 | SQM | 285 ₹3,420 | 270 ₹3,240 | 250 ₹3,000 Lowest | 300 ₹3,600 | 275.64 ₹3,307.66 |
| 10.00 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 12 | SQM | 101 ₹1,212 | 90 ₹1,080 Lowest | 90 ₹1,080 Lowest | 150 ₹1,800 | 98.05 ₹1,176.64 |
Tender Value
₹3.9 Cr
EMD Value
₹7.7 L
Closing Date
5 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE AYO-AMB CIRCLE PWD AYODHYA
Office of SE AYO-AMB CIRCLE PWD AYODHYA
Construction of New Divisional Office Building at Provincial Division PWD Barabanki
2026_CEUFZ_1202466_1
I/1542087/2026 Date 17-10-2026
Open Tender
Civil Works - Buildings
Fixed-rate
365 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7.7 L
Yes
AYODHYA
16 Nov 2026
29 Oct 2026
5 Nov 2026
29 Oct 2026
5 Nov 2026
29 Oct 2026
2 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DIVISIONAL OFFICE
Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.
From 0.00 mt to 1.50 mt | 830 | CUM | 100 | ₹83,000 |
| 2 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.
From 1.50 mt to 3.00 mt | 210 | CUM | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 250 | CUM | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 60 | CUM | - | - |
| 5 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 955 | SQM | - | - |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement contentin design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum R.C.C. work upto Plinth Lvl.
TIE BEAM
R.C.C.work in foundation / Footing
R.C.C.work in Column upto Plinth Lvl. | 300 | CUM | - | - |
| 7 | Providing and laying in position ready mixed or sitebatched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana /Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum
Lintel / Lintel Band
R.C.C. work in slab
SOAK PIT slab
R.C.C. work in beams
R.C.C.work in Column | 480 | CUM | - | - |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class 150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 150 | CUM | - | - |
| 9 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 12 | SQM | - | - |
| 10 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 12 | SQM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.52 MB
CBDBUILDING.pdf
Tender Documents • 2.35 MB
BOQ_2276035.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .