| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹9.6 L Quoted ₹9.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.9 L+₹9,775.15 (1.00%)Rejected-Finance LOWER DEVNAGAR VIKASNAGAR SHIMLA 09 | ₹9.9 L+₹9,775.15 (1.00%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.1 L+₹32,787.05 (3.35%)Rejected-Finance | ₹10.1 L+₹32,787.05 (3.35%) | L3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Bhaw Singh Chauhan L2 | Kapil Chand L1 | BALDEV SINGH THAKUR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 34.38 | P.Cum | 385 ₹13,236.3 | 380 ₹13,064.4 Lowest | 390 ₹13,408.2 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 36.41 | P.cum | 5,100 ₹1,85,691 | 5,000 ₹1,82,050 Lowest | 5,100 ₹1,85,691 |
| 3.00 | Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 garded stone aggreate 20 mm nominal size) upto plinth level with : Cement Motor 1:6 ( 1 cement : 6 coarse sand) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 5.4 | P.cum | 5,100 ₹27,540 | 5,000 ₹27,000 Lowest | 5,100 ₹27,540 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 40 | P.sqm | 500 ₹20,000 Lowest | 500 ₹20,000 Lowest | 550 ₹22,000 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 18 | P.Cum | 6,750 ₹1,21,500 | 6,700 ₹1,20,600 Lowest | 6,750 ₹1,21,500 |
| 6.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,328 | P.Kg | 120 ₹1,59,360 Lowest | 120 ₹1,59,360 Lowest | 125 ₹1,66,000 |
| 7.00 | P/F M.S. Pipe 40mm nominal bore for railing & fixed in M.S. Angle/Channels etc. including primer coat carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 80 | P.Rmt | 450 ₹36,000 Lowest | 480 ₹38,400 | 500 ₹40,000 |
| 8.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 24.45 | P.Sqm | 115 ₹2,811.75 | 110 ₹2,689.5 Lowest | 115 ₹2,811.75 |
| 9.00 | P/L Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Medium shade pigment using 50% Grey & 50% red including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 280 | P.sqm | 1,420 ₹3,97,600 | 1,400 ₹3,92,000 Lowest | 1,450 ₹4,06,000 |
| 10.00 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : in cement mortar 1:4 including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 60 | P.Sqm | 420 ₹25,200 | 400 ₹24,000 Lowest | 450 ₹27,000 |
Tender Value
₹9.0 L
EMD Value
₹18,100
Closing Date
10 Jul 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Special repair maintenance of existing path Govt Sr Sec School Dhalli in ward No 21 Mashobra SH PL chequred tiles and CC steps and MS pipe railing etc
2026_MC_137895_5
2286dated240626
Open Tender
Civil Works
Item Rate
60 days
SHIMLA
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer RB MC Shimla
₹18,100
8 Sept 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 34.38 | P.Cum | 100 | ₹3,438 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 36.41 | P.cum | 101 | ₹3,677.41 |
| 3 | Random rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 garded stone aggreate 20 mm nominal size) upto plinth level with : Cement Motor 1:6 ( 1 cement : 6 coarse sand) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 5.4 | P.cum | 102 | ₹550.8 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 40 | P.sqm | 103 | ₹4,120 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 18 | P.Cum | 104 | ₹1,872 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,328 | P.Kg | 105 | ₹1,39,440 |
| 7 | P/F M.S. Pipe 40mm nominal bore for railing & fixed in M.S. Angle/Channels etc. including primer coat carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 80 | P.Rmt | 106 | ₹8,480 |
| 8 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 24.45 | P.Sqm | 107 | ₹2,616.15 |
| 9 | P/L Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Medium shade pigment using 50% Grey & 50% red including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 280 | P.sqm | 108 | ₹30,240 |
| 10 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : in cement mortar 1:4 including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 60 | P.Sqm | 109 | ₹6,540 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
Tendernotice_2.pdf
PDF • 0.28 MB
Tendernotice_3.pdf
PDF • 0.70 MB
Tendernotice_4.pdf
PDF • 0.35 MB
BOQ_204170.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .