Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H6₹42.2 L−₹8.2 L (16.3%)Accepted-Finance 1103 ARUNAACHAL BUILDING 19 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | DELHI | 110001 | H6 | Accepted-Finance QUOTED LOWEST RATE | |
| 2 | H1₹50.5 LRejected-Finance | H1 | Rejected-Finance H1 | |
| 3 | H2₹49.2 L−₹1.3 L (2.54%)Rejected-Finance JAIPUR | JAIPUR | RAJASTHAN | 302001 | H2 | Rejected-Finance H2 | |
| 4 | H3₹48.6 L−₹1.9 L (3.69%)Rejected-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | H3 | Rejected-Finance H3 | |
| 5 | H4₹46.6 L−₹3.9 L (7.70%)Rejected-Finance | H4 | Rejected-Finance H4 |
| Sl No | Description | Qty | Unit | sanjeev prashar H4 | sovereign enterprise | sovereign enterprise H6 | P A SALES CORPORATION H3 | Super Enterprises H5 | UNIQUE PRECISION CONSTRUCTION H1 | PRAVEEN AND COMPANY H2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ITEMS TO BE EXECUTED | ||||||||||
| 1.01 | U/s Lime | 353.66 | QTL | 1,200 ₹4,24,392 | 800 ₹2,82,928 Lowest | 800 ₹2,82,928 Lowest | 850 ₹3,00,611 | 910.6 ₹3,22,042.8 | 1,050 ₹3,71,343 | 1,050 ₹3,71,343 |
| 1.02 | Surkhi | 55.78 | CUM | 1,500 ₹83,670 Lowest | 3,500 ₹1,95,230 | 3,500 ₹1,95,230 | 2,990 ₹1,66,782.2 | 3,100 ₹1,72,918 | 3,800 ₹2,11,964 | 3,800 ₹2,11,964 |
| 1.03 | Coarse Sand | 55.78 | CUM | 1,500 ₹83,670 Lowest | 3,550 ₹1,98,019 | 3,550 ₹1,98,019 | 2,980 ₹1,66,224.4 | 3,050 ₹1,70,129 | 3,150 ₹1,75,707 | 3,150 ₹1,75,707 |
| 1.04 | Brick Aggregate 20 mm-25 mm | 22.86 | CUM | 1,450 ₹33,147 Lowest | 1,890 ₹43,205.4 | 1,890 ₹43,205.4 | 2,500 ₹57,150 | 2,750 ₹62,865 | 2,800 ₹64,008 | 2,800 ₹64,008 |
| 1.05 | Belgiri | 234.99 | KG | 110 ₹25,848.9 | 90 ₹21,149.1 | 90 ₹21,149.1 | 100 ₹23,499 | 75 ₹17,624.25 Lowest | 150 ₹35,248.5 | 150 ₹35,248.5 |
| 1.06 | Gum | 176.23 | KG | 130 ₹22,909.9 | 125 ₹22,028.75 | 125 ₹22,028.75 | 200 ₹35,246 | 70 ₹12,336.1 Lowest | 150 ₹26,434.5 | 150 ₹26,434.5 |
| 1.07 | Gur | 176.23 | KG | 80 ₹14,098.4 | 55 ₹9,692.65 | 55 ₹9,692.65 | 80 ₹14,098.4 | 50 ₹8,811.5 Lowest | 150 ₹26,434.5 | 150 ₹26,434.5 |
| 1.08 | Mud | 18 | CUM | 850 ₹15,300 | 800 ₹14,400 | 800 ₹14,400 | 165 ₹2,970 | 100 ₹1,800 Lowest | 200 ₹3,600 | 200 ₹3,600 |
| 1.09 | Modern Bricks 2nd Class | 22,177 | NOS | 6.5 ₹1,44,150.5 | 6 ₹1,33,062 Lowest | 6 ₹1,33,062 Lowest | 10 ₹2,21,770 | 7.5 ₹1,66,327.5 | 8 ₹1,77,416 | 8 ₹1,77,416 |
Tender Value
₹46.3 L
EMD Value
₹1.4 L
Closing Date
21 Oct 2025, 11:00 amClosed
SA ASI Meerut Circle
Office of the SA ASI Meerut Circle Shastri Nagar Meerut
SUPPLY OF MATERIAL AND COMPLETE ITEMS OF WORKS FOR UNDER THE WORK OF SR TO CONSERVATION AND RESTORATION OF COLLAPSED BOUNDARY WALLS OF TOMB OF DIWAN SAIYED MOHAMMAD KHAN MAJHERA MUZAFFARNAGAR
2025_ASI_879859_1
Nort/Meer/Saha/Tomb/23077228 (Materials and Job work)
Open Tender
Civil Works
Works
120 days
tomb of diwan saiyed mohammad khan muzaffarnagar
Please refer tender document
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
3 Nov 2025
1 Oct 2025
22 Oct 2025
1 Oct 2025
21 Oct 2025
1 Oct 2025
ITEMS TO BE EXECUTED
U/s Lime
Surkhi
Coarse Sand
Brick Aggregate 20 mm-25 mm
Belgiri
Modern Bricks 2nd Class
Kail wood Sleeper (3.05X 2.05X0.10 m)
R.R. Stone
C.R. Stone
Careful Dismantling of Roof in Random Rubble Masonry over Bhurji in Lime Concrete, executed manually to preserve adjacent architectural features and reusable stone material. The work shall be carried out under direction of Engineer in- charge, ensuring minimal vibration and no damage to adjoining historic fabric.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed,
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m
Provision for removal of Malba for cleaning the sites including collecting, staking and disposal of the rubbish /malba upto 100 meter lead including all the labour and transportation etc complete. out of the monuments premises and further
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift
PRAVEEN AND COMPANY (BID ID -3301977)
P A SALES CORPORATION (BID ID -3300931)
sanjeev prashar (BID ID -3296407)
Super Enterprises (BID ID -3301804)
sovereign enterprise (BID ID -3299935)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
tend.pdf
Tender Documents • 22.76 MB
BOQ_924830.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .