Replacement and Laying of Sewer Pipe and Construction/ Raising of Sewer man Hole for Ward No. 7,8,12,13,14,15 and 16. File No. 66/26X9/1
2026_UAD_512890_1
MPGMC/66/26X9/1/PHE/2026-27
Open Tender
Miscellaneous Works
180 days
PHE Department
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹47,886
4 Jun 2026
4 Jun 2026
8 Jul 2026
5 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | PHE USOR 2023 Item No. 29.28.2 Page no. 378
Lifting & placing of manholes cover & frame including dismantling of existing C.C. coping during Raising of manholes (civil work to be paid separately)
(i) SFRC 560 MM DIA | 500 | Each | 107 | ₹53,500 | BI01010001010000000000000515BI0100001114 |
| 2 | PHE USOR 2023 Item No. 29.28.4 Page no. 378 (ii) SFRC 450x900 mm dia | 400 | Each | 148 | ₹59,200 | BI01010001010000000000000515BI0100001115 |
| 3 | PHE USOR 2023 Item No. 29.5.2 to 29.5.5 Page no. 372
Dismantling of old S.W. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable materials in to municipal dumps :
150 mm dia | 250 | Per Mtr. | 39 | ₹9,750 | BI01010001010000000000000515BI0100001116 |
| 4 | 200 mm dia | 200 | Per Mtr. | 42 | ₹8,400 | BI01010001010000000000000515BI0100001116 |
| 5 | 250 mm dia | 50 | Per Mtr. | 44 | ₹2,200 | BI01010001010000000000000515BI0100001116 |
| 6 | 300 mm dia | 50 | Per Mtr. | 47 | ₹2,350 | BI01010001010000000000000515BI0100001116 |
| 7 | PHE USOR 2023 Item No. 15.51.1 Page No. 263
Providing & fixing form work i/c centering and shuttering including strutting, propping etc. and removal of form work for:
Foundation, footing, bases of columns ,etc for mass concrete. | 80 | Sqm | 203 | ₹16,240 | BI01010001010000000000000515BI0100001116 |
| 8 | PHE USOR 2023 Item No. 29.25.5 and 29.25.10 Page no. 376-377
Providing & fixing of ISI marked pre cast reinforced cement concrete manhole cover including frame and transporting at site, cost of all material etc.
560 mm dia heavy duty Total manhole in Group - B 3576 Nos. ka 10% | 500 | Each | 2,903 | ₹14,51,500 | BI01010001010000000000000515BI0100001116 |
| 9 | 450x900 heavy duty in Group-B total manhole 2347 Nos. ka 12% | 400 | Each | 3,948 | ₹15,79,200 | BI01010001010000000000000515BI0100001116 |
| 10 | PHE USOR 2023 Item No. 15.6.1 Page No. 257
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth
Depth 0 to 1.5 M
Sewer
150 mm - (300x0.65x1.5) = 292.50
200 mm - (200x0.85x1.5) = 255
250mm - (100x0.85x1.5 = 127.50
300 mm - (50x0.85x1.5 = 63.75
Total 738.75 | 738.75 | Cum | 209 | ₹1,54,398.75 | BI01010001010000000000000515BI0100001116 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TenderDocument.pdf
Tender Documents • 5.90 MB
Conditions.pdf
Other Document • 6.39 MB
BOQ_617744.xls
BOQ • 0.27 MB
Estimate.pdf
Additional Documents • 6.01 MB
Download all tender documents and submit your bid