Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
31 May 2021, 3:00 pmClosed
Xen Drainage Division Patiala
Xen Drainage Division Patiala
Repairing of Mehdudan Bundh in between RD 550 to 810 by providing Bstone crated Apron and Pitching of Pachisdhara Nallah and Providing revetment Pitching on L S Tangri Nadi from RD 68505 to 68655 near vill Mohalgarh before the flood season of 2021 to
2021_WR_65921_8
08/spl
Open Tender
Civil Works - Others
Item Rate
90 days
Xen Drainage Division Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹82,000
Yes
7 Jul 2021
25 May 2021
31 May 2021
25 May 2021
31 May 2021
25 May 2021
Amount
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads2.27km(first 0.18 km katcha, 0.60 Km pucca &last 1.49 km katcha
Filling stones or spalls into crates and hand packing Including supply of Boulder stone and carriage from approved quary , loading & unloading complete in all respect
Filling stone or spall hand packing Including supply of Boulder stone and carriage from approved quary , loading & unloading complete in all respect. On side slopes behind pitching
Stone or Kankar block pitchingon slopes of guide bandh and protection works Including supply of Boulder stone and carriage from approved quary , loading & unloading complete in all respect
Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh including supply of MSA wire 4mm as per Pwd Specifications
Stacking within 15 metres of the unloading points into stacks of specified sizes
Rehandling of boulder from stackyard to site with an av. Lead of 1 km and extra loading/unloading manully
Rehandling of boulder from stackyard to site with an av. lead 1.49km and extra loading & unloading manually.
ONKAR SHARMA CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .