| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAdmitted-Finance | ₹29.8 L | L1 | Admitted-Finance |
| 2 | L2₹32.9 LAdmitted-Finance | ₹32.9 L | L2 | Admitted-Finance |
| 3 | L3₹35.7 LAdmitted-Finance | ₹35.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KAKWANI BUILDERS L2 | Tractors Machinary Components L1 | G.K. TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete and paving not exc 15 cm thick (below or above ground level) complete all as specified and as directed. | 12.84 | Cum | 50 ₹642 | 1,300 ₹16,692 | 55 ₹706.20 |
| 2.00 | Demolition of brick work /stone masonry masonry built in cement mortar of any description all as specified and directed. | 8 | Cum | 50 ₹400 | 1,550 ₹12,400 | 55 ₹440 |
| 3.00 | Taking down chowkats or frames with shutters (without taking off shutter from frames) not exc. 1.5 sqm each etc complete all as specified and as directed | 20 | Each | 50 ₹1,000 | 250 ₹5,000 | 55 ₹1,100 |
| 4.00 | Taking down chowkats or frames with shutters (without taking off shutter from frames) exc. 1.5 Sqm but n exc 4.0 Sqm each etc complete all as specified and as directed | 20 | Each | 60 ₹1,200 | 320 ₹6,400 | 59 ₹1,180 |
| 5.00 | Taking down shutter of any description area exc 1.00 Sqm but not exc 2.00 sqm each etc complete all as specified and as directed | 10 | Per Leaf | 40 ₹400 | 80 ₹800 | 49 ₹490 |
| 6.00 | Taking down cement plaster of any description hacking for key or raking out joint on old brick work/ stone /concrete surface etc complete all as specified and as directed | 240 | Sqm | 10 ₹2,400 | 85 ₹20,400 | 18 ₹4,320 |
| 7.00 | Demoition of Stone slabs and tiles of any description or thickness in floors, aprons , laid bedded and pointed in any mortar etc complete all as specified and as directed | 0.8 | X Sqm | 50 ₹40 | 570 ₹456 | 65 ₹52 |
| 8.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premise etc complete all as specified and as directed | 649.2 | Sqm | 10 ₹6,492 | 80 ₹51,936 | 20 ₹12,984 |
| 9.00 | Taking up or down 15mm steel tubing and connections incl cleaning for refixing and removal to store etc complete all as specified and as directed. | 20 | RM | 10 ₹200 | 30 ₹600 | 18 ₹360 |
| 10.00 | Taking up or down 20 mm steel tubing and connections incl cleaning for refixing and removal to store etc complete all as specified and as directed. | 25 | RM | 10 ₹250 | 35 ₹875 | 18 ₹450 |
Updated dates
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
25 May 2026, 6:00 pmClosed
GE Narangi
GE Narangi c/o 99 APO
CERTAIN MISC REPAIR TO NEAR PANJABARI GATE AND 21 BIHAR IN AOR BR II UNDER GE NARANGI
2026_MES_762316_1
8211/B/E8
Open Tender
Civil Works
180 days
Guwahati
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Narangi
₹70,000
Yes
1 Jun 2026
27 Apr 2026
27 May 2026
27 Apr 2026
25 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete and paving not exc 15 cm thick (below or above ground level) complete all as specified and as directed. | 12.84 | Cum | - | - |
| 2 | Demolition of brick work /stone masonry masonry built in cement mortar of any description all as specified and directed. | 8 | Cum | - | - |
| 3 | Taking down chowkats or frames with shutters (without taking off shutter from frames) not exc. 1.5 sqm each etc complete all as specified and as directed | 20 | Each | - | - |
| 4 | Taking down chowkats or frames with shutters (without taking off shutter from frames) exc. 1.5 Sqm but n exc 4.0 Sqm each etc complete all as specified and as directed | 20 | Each | - | - |
| 5 | Taking down shutter of any description area exc 1.00 Sqm but not exc 2.00 sqm each etc complete all as specified and as directed | 10 | Per Leaf | - | - |
| 6 | Taking down cement plaster of any description hacking for key or raking out joint on old brick work/ stone /concrete surface etc complete all as specified and as directed | 240 | Sqm | - | - |
| 7 | Demoition of Stone slabs and tiles of any description or thickness in floors, aprons , laid bedded and pointed in any mortar etc complete all as specified and as directed | 0.8 | X Sqm | - | - |
| 8 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premise etc complete all as specified and as directed | 649.2 | Sqm | - | - |
| 9 | Taking up or down 15mm steel tubing and connections incl cleaning for refixing and removal to store etc complete all as specified and as directed. | 20 | RM | - | - |
| 10 | Taking up or down 20 mm steel tubing and connections incl cleaning for refixing and removal to store etc complete all as specified and as directed. | 25 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
8211Tender.pdf
Tender Documents • 0.62 MB
BOQ_853891.xls
BOQ • 8.53 MB
Download all tender documents and submit your bid