| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹2.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.8 Cr+₹15.8 L (6.02%)Rejected-Finance | ₹2.8 Cr+₹15.8 L (6.02%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 Cr+₹28.0 L (10.7%)Rejected-Finance | ₹2.9 Cr+₹28.0 L (10.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.1 Cr+₹50.3 L (19.2%)Rejected-Finance | ₹3.1 Cr+₹50.3 L (19.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.4 Cr+₹79.6 L (30.4%)Rejected-Finance 9 206 UDAY SINGH JAIN ROAD ALIGARH 202001 | ALIGARH | UTTAR PRADESH | 202001 | ₹3.4 Cr+₹79.6 L (30.4%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | DINESH CIVIL CONSTRUCTION CO. L2 | Technical Construction Co L5 | M/s Ajay Kumar Contractor L1 | Mahesh Chandra Sharma L4 | rupendra kumar bhardwaj L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge. | 3,100 | CUM | 100 ₹3,10,000 | 100 ₹3,10,000 | 54 ₹1,67,400 | 50 ₹1,55,000 Lowest | 100 ₹3,10,000 |
| 2.00 | Laying LDPE film including cost of all materials, labour charges, T&P etc. | 23,480 | SQM | 50 ₹11,74,000 | 62 ₹14,55,760 | 40 ₹9,39,200 | 50 ₹11,74,000 | 30 ₹7,04,400 Lowest |
| 3.00 | Laying 50 mm thick Cement Concrete work below brick lining and toe wall in 1:3:6 mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | 980 | CUM | 5,000 ₹49,00,000 | 6,500 ₹63,70,000 | 3,400 ₹33,32,000 Lowest | 5,500 ₹53,90,000 | 5,000 ₹49,00,000 |
| 4.00 | Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | 2,800 | CUM | 6,912 ₹1,93,53,600 | 7,484.56 ₹2,09,56,768 | 7,200 ₹2,01,60,000 | 7,500 ₹2,10,00,000 | 6,700 ₹1,87,60,000 Lowest |
| 5.00 | Centring & shuttering for C.C.Work including all cost of labour T&P etc Complete. | 7,730 | SQM | 200 ₹15,46,000 Lowest | 575 ₹44,44,750 | 200 ₹15,46,000 Lowest | 400 ₹30,92,000 | 500 ₹38,65,000 |
| 6.00 | Videography/Photography of canal before work, during the work and after compeletion of the work by DRONE i/c providing pen drive and vehicles for reaching to canal with direction of Engineer-in-charge. | 3 | KM. | 2,000 ₹6,000 | 1,650 ₹4,950 | 900 ₹2,700 Lowest | 1,200 ₹3,600 | 10,000 ₹30,000 |
| 7.00 | Supplying of iron sign board size 1.20 x0.90 mt. with 16 gauge iron sheet 50x50x5 mmsize MS angle upto 3.00 mt. height i/c cost of materials & also including Erection and writing work . | 3 | NO. | 3,500 ₹10,500 | 7,407.33 ₹22,222 | 900 ₹2,700 Lowest | 4,000 ₹12,000 | 10,000 ₹30,000 |
| 8.00 | Earth work in filling for restroresion of both banks of canal at down stream of head and x- Regulator i/c all cost of labour, T&P etc and also i/c lead up to 1.00 km, ramming dressing manual compction etc complete. | 3,835 | CUM | 120 ₹4,60,200 | 150 ₹5,75,250 | 9 ₹34,515 Lowest | 100 ₹3,83,500 | 100 ₹3,83,500 |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
5 Aug 2026, 5:00 pmClosed
Suprintending Engineer
Office of the SE MGCCC Moradabad
Construction of CC lining on the Head Regulator and filling reach of Rahmapur Rajwaha in District Aligarh.
2026_UPIDC_1166878_5
05/SE/2026-27
Open Tender
Civil Works
Item Wise
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.6 L
Moradabad
18 Sept 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
5 Aug 2026
17 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth or as directed by Engineer in charge. | - | CUM | 67 | - |
| 2 | Laying LDPE film including cost of all materials, labour charges, T&P etc. | - | SQM | 62 | - |
| 3 | Laying 50 mm thick Cement Concrete work below brick lining and toe wall in 1:3:6 mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | - | CUM | 6,971.9 | - |
| 4 | Laying 75 mm thick C.C. lining of M20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc. | - | CUM | 8,626.2 | - |
| 5 | Centring & shuttering for C.C.Work including all cost of labour T&P etc Complete. | - | SQM | 575 | - |
| 6 | Videography/Photography of canal before work, during the work and after compeletion of the work by DRONE i/c providing pen drive and vehicles for reaching to canal with direction of Engineer-in-charge. | - | KM. | 1,650 | - |
| 7 | Supplying of iron sign board size 1.20 x0.90 mt. with 16 gauge iron sheet 50x50x5 mmsize MS angle upto 3.00 mt. height i/c cost of materials & also including Erection and writing work . | - | NO. | 7,466.6 | - |
| 8 | Earth work in filling for restroresion of both banks of canal at down stream of head and x- Regulator i/c all cost of labour, T&P etc and also i/c lead up to 1.00 km, ramming dressing manual compction etc complete. | - | CUM | 168.1 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
Tenderbooklot05div12.pdf
Tender Documents • 3.64 MB
BOQ_2195193.xls
BOQ • 0.25 MB
Corrigendumtendernotice05.pdf
PDF • 0.08 MB
Corrigendumlot01to06.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .