| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L Quoted ₹6.5 L | L1 | Accepted-AOC 1st Lowest amount |
| 2 | L2₹6.6 L+₹14,174.72 (2.19%)Rejected-Finance | ₹6.6 L+₹14,174.72 (2.19%) | L2 | Rejected-Finance 2nd Lowest amount |
| 3 | L3₹6.7 L+₹18,470.10 (2.85%)Rejected-Finance | ₹6.7 L+₹18,470.10 (2.85%) | L3 | Rejected-Finance 3rd Lowest amount |
| 4 | L4₹6.7 L+₹19,586.89 (3.02%)Rejected-Finance | ₹6.7 L+₹19,586.89 (3.02%) | L4 | Rejected-Finance 4th Lowest amount |
| 5 | L5₹7.0 L+₹51,114.92 (7.88%)Rejected-Finance | ₹7.0 L+₹51,114.92 (7.88%) | L5 | Rejected-Finance 5th Lowest amount |
Tender Value
₹10.1 L
EMD Value
₹85,907
Closing Date
26 May 2026, 3:00 pmClosed
E.O.
NPP Jaunpur
Civil work 4
2026_DOLBU_1149839_4
374/8-Nirman
Open Tender
Civil Works
Percentage
NPP Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,514
E.O.
₹85,907
23 Jul 2026
19 May 2026
26 May 2026
19 May 2026
26 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary Soil including all complete. (Sl.No.251(a)) | 90.3 | Cum | 189 | ₹17,066.7 |
| 2 | Laying & Providing plane cement concrete 8:4:1 (cement, fine sand & 40 mm gauge brick ballast) including all complete. [SI.No 2751 | 14.45 | Cum | 4,746.1 | ₹68,581.15 |
| 3 | M-150 Brick Work in one cement & four course sand of 2.50 F.M morater in foundation & plinth including supplly of all materials, Labour, Tools & plants etc. required ofr ocmpletion of work. [SI.No.305] | 35.66 | Cum | 6,805.4 | ₹2,42,680.56 |
| 4 | 12mm thick plaster with 1:4 cement and F.sand mortar including supply of all material labour, T&P complete Linh [SL No 583 | 199.5 | sqm | 175.5 | ₹35,012.25 |
| 5 | R.C.C work with cement, approved coarse sand & 2cm. Gauge approved stone grit in proproting of 1:2:4 e, The rate excludes making of dirp course which shall be paid extra Slah PWD SL284 | 0.54 | Cum | 8,667.4 | ₹4,680.4 |
| 6 | Mild steel or iron work such as reinforced concrete wrought required shape to as necessary including bending for proper completion of the work and including supply of steel (SI.No.504] | 0.28 | qtl | 7,070 | ₹1,979.6 |
| 7 | Dismentling of old interlocking paver blocks from foohfath inclding removel all complete. | 341.25 | sqm | 60.66 | ₹20,700.23 |
| 8 | E/W in cutting & filling ordinary soil including cartage of earth 3 KM from site etc. all complete job. | 68.25 | Cum | 259.9 | ₹17,738.18 |
| 9 | Construction fo granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per MORTH specifiction Grade I As per 400-1 | 34.13 | Cum | 2,431.4 | ₹82,983.68 |
| 10 | P/L 80 mm cement brick interlocking/zig jack rabum mould brick interlocking soiling including etc. all complete. | 238.88 | sqm | 856.3 | ₹2,04,552.94 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2152977.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .